HomeMy WebLinkAboutConservation Minutes 7/26/1993TOWN OF MANSFIELD, MASSACHUSETTS
10 50 West Street, Mansfield, MA 02048
MANSFIELD CONSERVATION COMMISSION
AGENDA
MONDAY, JULY 26, 1993
7 :30 CALL TO ORDER
7 :50 WETLANDS PROTECTION ACT HEARING CONTINUATION - James
Barry, Jr. -- Exclusive Use Area D, 90 Oaf; St.--
Construction of house and related grading within 100 ft.
of wetlands
8 :00 REDUEST FOR DETERMINATION OF APPLICABILITY - Town of
Mansfield, to determine wetland resource area at
Clinton, Pleasant, and Cottage Streets
8.30 WETLANDS PROTECTION ACT HEARING CONTINUATION - Crosspoint
Development Carp.-- Chauncy St. at Forbes Boulevard - -Tc-
construct an 87,048 sq. ft. shopping center, a portion
of which will require work within bordering vegetated
wetland, intermittent stream bank:, and buffer zone.
9 :30 WETLANDS PROTECTION ACT HEARING — Karl C:lemmey-- Perkins
Ave. Lots 1 -3 - -To construct roadway and three dwellings,
including associated grading & utilities, within 100 ft.
of wetlands
AS TIME ALLOWS:
MINUTES
CORRESPONDENCE/NEW BUSINESS
CERTIFICATES OF COMPLIANCE
NEW BUSINESS
MANSFIELD CONSERVATION COMMISSION MINUTES
MONDAY, JULY 26, 1993 -- PAGE 1
Members Present: Chairman Cauldwell, Commissioners Cormier,
Oberlander, Powers, Sadowski, Smith, Weidner
MINUTES: MOTION: To approve minutes of 7 -12 -93 as amended: clarify
that Comm. Smith was present; clarify that Comms.
Powers and Cormier were not present for the
Mansfield Oil discussion; correct spelling of Mike
McClanahan and Steve Bernstein's names.
(Powers - Sadowski; all in favor, with
Powers abst. from reviewing portions
involving Mansfield Oil) VOTED
[Comm. Smith arrived.]
WILLIAMS ST. BRIDGE DISCUSSION
Memo from Bob Swanson asking for comments from Commission. Since
no plans for relocation /reconstruction of bridge, the Commission
should refer back to R. Lewis memo. Commission should ask for notices
Of future hearings and copies of plans.
MOTION: To send Bob Swanson a memo incorporating above
discussion.
(Powers - Sadowski; all in favor) VOTED
CERTIFICATES OF COMPLIANCE:
Lot 1, 2 Gander Lane, SE211 -395, Dick reports all work is done.
MOTION: To issue certificate.
(Powers - Cormier; all in favor,
Smith & Sadowski abst.) VOTED
571 Maple St., SE211 -340. Attorney needs 're- certification;
commission released this lot in 191.
MOTION: To issue the certificate.
(Powers - Oberlander; all in favor) VOTED
WETLANDS PROTECTION ACT HEARING CONTINUATION - James Barry, Jr.--
Exclusive Use Area D, 90 Oak St. -- Construction of house and
related grading within 100 ft. of wetlands
No DEP number received. Ralph Malcon presented a new plan which
moved the hay bale line around test hole 06 for clean -up purposes.
Comm. Powers stated she had keyed out one of the ferns found on the
site. Interrupted Fern which is a non - wetland species. Bick will have
a proposed Order on August 9th which will address any issue raised by
the state.
MOTION: To continue to 5 -9 -93 at 7:50 p.m.
(Powers - Sadowski; all in favor) VOTED
REQUEST FOR DETERMINATION OF APPLICABILITY - Town of Mansfield, to
determine wetland resource area at Clinton /Pleasant /Cottage Sts.
Abutter Ban Thurber presented a plan prepared by David Grant
(dated 7- 26 -93) showing wetland line flagged by Gary Sanford. Mr.
Thurber says the Sanford wetland line stops at the Bernstein property
iline since Sanford did not go on to Mr. Bernstein's land. Mr. Thurber
believes that wetland area does exist on the Bernstein property.
Abutter Bernstein disagrees with this statement; says mater backs up
MANSFIELD CONSERVATION COMMISSION MINUTES
MONDAY, JULY 26, _1493 -- PAGE 2
onto his land.
In response to question from Commissionq abutter Forbes says pipe
at Clinton Pleasant intersection does not carry any street flow.
Mr. Bernstein agrees with this. Abutter Griffin asks about
implication if area is determined to be bordering vegetated wetland.
The application process for work in bvw or the buffer zone was
explained.
Mr. Thurber states that Gary Sanford says area does contain a
bvw. Mr. Bernstein says that for as long as he has lived in the
neighborhood that no water has flowed through this area. Abutter
Cindy Bertram disagrees with Mr. Bernstein and says that water flow
does occur. 0',�k,S okea wr1;h IHr, Sah�orn uJhb vd c<ted ttiaY.rPCevrF
cdjvdicaicry Means 5 WUvid it"Xceite Ylee dra6� t+a /Ai {oe. cjnbeterPG( 6VW.
Comm. Powers asks if 1989 drainage work has solved flooding and
drainage problems. Mrs. Thurber says problem area is the catch basin
at Cottage /Brook intersection - -basin is too high. Mr. Bernstein
agrees. Says Town efforts to regrade and Swale the depression was not
done with back -up engineering or survey work.
Sarah Forbes shows old plan which identifies low spot which is
where current problem is found. Wonders what will happen to this area
if all water is evidently directed away from this depression.
No input at meeting from Engineering Dept. Comm. Powers says
Sanford information is helpful. The hearing was closed. r/
MOTION: To issue a Positive Determination 01, with copy of
Grant /Sanford plan attached to the Determination.
(Powers - Sadowski; all in favor) VOTED
WETLANDS PROTECTION ACT HEARING CONTINUATION - Crosspoint Development
Corp. - -Chaim cy St. at Forbes Boulevard - -To construct an 87,048
sq. ft. shopping center, a portion of which will require work
within bordering vegetated wetland, intermittent stream bank, and
buffer zone.
Engineer Don Springetti distributes reports from himself and
Sanford Ecological Services which respond to issues raised at last
hearing and site walk. Issues discussed are: 1. Erosion Control and
Construction Sequencing -- replacement bvw areas and wet marshes will be
readied to receive wetland soils and hay bale /silt fence plus concrete
retaining wall in back of site will help with sediment control. 2.
Rubber roof membrane will promote clean run -off; revised plan showing
roof flow being directed toward rear where replication and wet marshes
area located. 3) Second catch basin in truck loading area being
added.
Gary Sanford addresses roof water /quality of run -off; tests in
similar area show drinking water criteria meta Water quality should
be improved through wet marshes. Wetland replication area will use
existing soils or 50 /50 peat /loam mix. Reviews report relative to
impacted tree in replication and marsh areas and lighting impact on
MANSFIELD CONSERVATION COMMISSION MINUTES
MONDAY, JULY 26, 1993 -- PAGE 3
wildlife. Finds no substantial impacts on wildlife in the general
area from lighting.
Comm. Cormier asks about life expectancy of roof membrane and
construction of detention basin. Don Springetti says roof material is
good for 15 -20 years at least; explains detention basin construction.
MOTION: To continue to 8 -9 -93 at 8:00 p.m.
(Powers - Cormier; all in favor, Smith abst.) VOTED
WETLANDS PROTECTION ACT NEARING - Karl Clemmey -- Perkins Ave. Lots 1--
3--To construct roadway and three dwellings, including associates
grading f, utilities, within 100 ft. of wetlands
No file number received from state. Mr. Clemmey presents letter
from Day Colony Group askincg f0r.COntinuation. Comm. Powers asks Mr.
g - -p
Clemmey if he is givin t.e v me ermi m1ss�pn ss ion to enter onto his land given
his previous statements regarding access. Mr. Clemmey says he has
filed a Notice of Intent and that the Commission can enter onto his
property.
Site walk scheduled for 6:30 p.m. on 7- 29 -93. Mr. Clemmey has nc
objections to abutters walking the site. Dick will contact Day Colony
regarding staking the site.
MOTION: To continue hearing to 8 -23 -93 at 8:00 p.m.
(Powers - Sadowski; all in favor) VOTED
MOTION: To send letter to applicant stating that hay bales shall
remain in place and no further work shall be done until
the final Orders are issued and the appeal period is
over.
(Powers - Sadowski; all in favor) VOTED
MILL POND DAM DISCUSSION
Bob Swanson, DPW Director, was present to report the violation.
Says DPW crews did the work involving excavation of old sluiceway and
Placement of wood forms. Work was performed contrary to his
instructions; he had no intention to do work without a permit and said
he had instructed crew that no work should be done without permit.
Said he had no knowledge of work being performed. Bob Swanson
apologized for the violation.
Comm. Weidner asks what happens now. Mr. Swanson outlines the
bad condition of the old sluiceway. Once he discovered the violation
he informed Dick. Money in State budget for study of dam and
construction. Mr. Swanson not-sure when study will be completed.
[loping to do some work this season. Final reconstruction design has
yet to be worked out.
Comm. Powers asks if work order had been signed for this project.
Chairman Cauldwell asks if anything was in writing not to do any work
until permits were in place. Swanson says no to both questions.
MOTION: To issue an Enforcement Order with attached memo stating
that an Order is the best mechanism to reach compliance.
Two weeks to complete restoration work outlined in
Dick's memo.
i(Powers - Sadowski; all in favor) VOTED
Dana Colby requested Certificate: no action taken. Send letter
MANSFIELD CONSERVATION COMMISSION MINUTES
MONDAY, JULY 269 1993 -- PAGE 4
to Colby asking him to review number of lots requested for release in
order to stay below 507 threshold in Order.
DISCUSSION OF ROUTE 495/140 LAND TRANSFER
Letter from Secretary Kerasiotes outlining state's proposal.
Board of Selectmen not pleased with proposal. Importance of, having
Town -wide cooperation on this issue. Dick will draft Commission
response with Greg to check.
Comm. CaUldwell raises issue of individuals coming before
Commission prior to formal application being filed: is this a good
thing? Asks commissioners to think about this.
DISCUSSION OF LETTER FROM RALPH PENNEY. Dick will draft response and
send letter. [0o ; *i# lowem &Oio , +Ilis dI560560k1J
The meeting adjourned.