HomeMy WebLinkAboutConservation Minutes 6/24/1994MANSFIELD CON"EIRV&I6N iCrb'WSSION MEETING MINUTES - PAGE 1
Members present: Chairman CauldweL;�m
oms. Powers, Sadowski, Weidner
'`ir.i�;t � c
Mark Bobrowski, 41 Fr r+i'cktane, reminded the commission of a $3500 bond Mr. Bonvie had
with the town and requested that something be done about a stump dump in his neighborhood.
MINUTES: MOTION: To approve minutes as discussed.
SADOWSKI- POWERS; all in favor VOTED
ADOPT -A -TRAIL PROGRAM: Leonard Flynn, Natural Resources Trust, reported that if the
Commission approves the previously discussed potential Adopt -a -Trail Program, Colin Cauldwell
has volunteer to serve as the chairman. Harry Chase would be available to consult with the
group. The first section to be developed would be the section held by the state; remnants of trails
could be restored. Harry suggested doing planning now, with actual trail clearing to begin in the
fall. Comm. Powers would like to walk the trail with the commissioners (esp. G. Cormier, who is
the commission's designated trails person) and discuss the issues as a commission. Lions Club has
volunteered to participate in such a program, as have a walking club and various Girl and Boy
Scout troops.
Lenny Flynn also reported that a discrepancy in one of the lines drawn on land held by the Mass.
Highway Dept. has been researched and redrawn; Lenny is leaving plans which have been
researched with Dick. There was no deed for the lot itself, so it was researched by referencing the
lots surrounding it.
NOTICE OF INTENT HEARING- -Town of Mansfield, D.P.W., Ware Street roadway
improvements, sidewalk installation, and drainage work
Bob Swanson, Town Engineer, and Shaun Scully, Beta Engineering, Inc. were present. No EIR
required. No endangered species in project area; documentation to that effect included in the
NOI. Abutters have been notified. Dick has walked the site with Mr. Scully. Plan has been
modified accordingly to relocate several utility poles in order to move sidewalks away from
wetlands. No new outfalls; all drainage will go where it goes now. Edge of work in vicinity of
wetlands, using outfall structures, but no wetland filling. Will be replacing one pipe which is
undersized. Minimum alterations, project designed in accordance with standards; MEPA has
signed off and all permits have been obtained. New catch basins, using existing drains. New
manhole, erosion and sediment controls along roadway in all cases.
Dick had no questions. He and Shaun have reviewed prior to meeting, and have walked site.
Most of the work is repair /replacement. No file number received. Site will be walked on Wed.
eve. 6/29 at 6:30 p.m. Comm. Powers requested a full set of plans for site walk. Reason for
putting in sidewalks: public safety issue. Comm. Powers requested document for that reason, for
the record. Provisions in limited project section should cover.
MANSFIELD CONSERVATION COMMISSION MEETING MINUTES - PAGE 2
Will be bid with granite curbing on one side and Cape Cod berm on other side; depending on cost
could be Cape Cod berms on both sides. Standard sumped and hooded oil /water separators can
be included, according to Bob Swanson. Total length of sidewalk about 8000 ft., all on westerly
side of Ware St. In only one place is there potential for overtopping the road in a 25 year storm;
this is where the pipe size is being increased.
Robert Medeiros, 258 -260 Ware St. was present and expressed concerns about stream along side
of his house; he is afraid his back yard will be flooded. His septic system is back there, too. Will
be no change in flow, according to Mr. Scully. Commission will take a look. New catch basin
going in the area. Shaun will double check on whether any of the area falls within the 100 year
flood plain.
MOTION: To continue to 7 -11 at 8:10.
POWERS- WEIDNER; all in favor VOTED
REQUEST FOR DETERMINATION OF APPLICABILITY- -Town of Mansfield, D.P.W. - -8
Jewell St.-- Reconstruction of roadway with drainage improvements within 100 feet of a wetland
Bob Swanson presented the project. Will be formalizing an easement with a town resident to do
the work. In years past the Town has had to send a front end loader to scrape the ice, because of
a low point which creates puddles. Rip- rapped structure shown on plan, but Comm. Sadowski is
concerned that it looks like the water is being channelized rather quickly into the wetland and
wants to know what can be done to reduce the velocity, since the marsh is a fairly quiescent
wetland. Mr. Swanson explained that the reason for not extending the pipe any further was to stay
out of c.etland, but if velocity is a concern, riprap could be extended into the flatter area, and the
area could be dug down a bit also. Catch basins will be sumped and hooded. Lenny Flynn
abutter stated that this has been a long - standing problem and is glad to have it corrected.
Wetlands not shown on plans, though contours are shown. No more than a day and a half in the
buffer zone.
MOTION: To close
POWERS- WEIDNER; all in favor VOTED
MOTION: To issue a negative #3 determination, with siltation controls, sump design at
outfall, making sure catch basins have hoods or some oil/water separator, with no
work to be done in wetlands.
POWERS- SADOWSKI; all in favor VOTED
REQUEST FOR DETERMINATION OF APPLICABILITY- -Town of Mansfield, D.P.W.- -
Maple St.-- Reconstruction of roadway with drainage improvements within 100 feet of a wetland
Drainage will be to same places as currently existing. In response to the site walk, some redesign
has taken place in order to allay commission's concerns about the amount of sand along the
roadways. Additional discharge point catch basin structures being installed. Project duration:
about a week and a half. About 4900 ft. will be affected. Comm. Powers requested that the plans
MANSFIELD CONSERVATION COMMISSION MEETING MINUTES - PAGE 3
show the areas in which the commission had concerns about proximity to wetlands. Potential
areas of concern: 551 Maple St., opposite site of street at 558 Maple St. Dave Archard made
note of the areas while on the site walk. Dick will walk area with Dave Archard, get concerns put
on plan so commission feels comfortable with negative determination.
MOTION: To continue to 7 -11 at 8:30
POWERS- WEIDNER; all in favor
VOTED
Mr. Swanson was also reminded about materials which have been dumped at several locations
from work already being done, some near Jennifer Dr., on the southerly side, but the worst was
Bird, Maple Winter area, where the gravel and asphalt needs attention/cleanup.
NOTICE OF INTENT HEARING CONTINUATION-- SE211- 472 -- Michael Trowbridge, Lot 4,
16 Douglas Drive -- Proposed house and associated grading within 100 feet of a wetland and flood
plain
Note # nine has been added to the plan, regarding location of septic system, which will remain the
same regardless of the size of the house built on the lot. Double row of hay bales discussed on
site; should be included in orders.
MOTION: To close.
POWERS- SADOWSKI; all in favor
VOTED
NOTICE OF INTENT HEARING CONTINUATION: SE211- 473 -- William Bertarelli- -Lot 106,
37 Bird Rd.-- Construction of single family house with associated grading within 100 feet of a
wetland
NOTICE OF INTENT HEARING CONTINUATION: SE211- 474 -- William Bertarelli- -Lot 107,
41 Bird Rd.-- Construction of single family house with associated grading within 100 feet of a
wetland
Mr. Sean McCarthy presented project on behalf of Mr. Bertarelli, SE211 -473: Stone wall
located on plan; plan marked for areas to be restored; A -flags added; smaller house staked in field
than on plan; the smaller house will be built. New plan; rev. date 6- 20 -94. SE211 -474:
Commission had problem with house location; has been shifted by almost forty feet. New plan;
rev. date 6- 20 -94. Hay bale lines all connect. All commission concerns have been met. Plans
have been submitted to DEP as well. Dick has reviewed on site; everything looks fine. Comm.
Powers asked what is planned for the wetlands area on lot 106 which is in need of restoration.
Mr. Bertarelli's representative suggested it would be preferable to include restoration
work/specifications in the orders, rather than to request a plan from Mr. Bertarelli prior to the
orders. Sensitive areas: near flags 3, 4, 5.
MOTION: To close
SADOWSKI- POWERS; all in favor VOTED
NOTICE OF D-iENT HEARING -- Folkman -Zola Builders - -Lot 22B Bird Rd.-- Constriction of
house and associated grading within 100 ft. of a wetland
MANSFIELD CONSERVATION COMMISSION MEETING MINUTES - PAGE 4
DMG Engineering, John McDonald. Flags moved forward; (10 -15 feet); siltation controls will be
double, noted on plan; 100 ft. buffer zone line shown. Rev. plan dated 6- 22 -94. No number
received.
MOTION: To continue to 7 -11 at 8:45.
POWERS- SADOWSKI; all in favor
VOTED
NOTICE OF INTENT HEARING CONTINUATION -- William Romero - -Lot 8,115 York Rd. --
Construction of house and associated grading within 10 ft. of a wetland area
House will be shifted forward, retaining wall will be eliminated; plan is not yet re- drafted. No
number received.
MOTION: To continue to 7 -11 at 8:50.
POWERS- SADOWSKI; all in favor
VOTED
AGENDA FOR JULY 11: RDA received from Mass. Highway Dept. for work on 495. Site walk
on 7 -6 (Wed.) at 6:30p.m. Meet at town hall.
CERTIFICATES:
A partial certificate has been requested for SE211 -416, Lot 69, Longwood Circle. Comm. Powers
elected to abstain from this decision due to conflict. No quorum remained, and therefore no
action was taken.
Partial requested for SE211 -434 from overall subdivision; no wetlands on this lot.
MOTION: To issue partial for Lot 9, SE211 -434
SADOWSKI - POWERS; all in favor VOTED
Partial requested for SE211 -385, Jennifer Drive, Lot 1
MOTION: To issue partial release for lot 1, Jennifer Dr., SE211 -385, contingent upon review
of original orders to confirm the intent of the commission re wetland replication
completion.
POWERS- WEIDNER; all in favor VOTED
Comm. Sadowski doesn't feel he can vote for a partial because of the incomplete and inconclusive
nature of what exists on site, even though money is there in the form of a bond held by the town.
Comm. Powers also raised the question as to whether the new owner would permit any remedial
work. Commission would prefer to see planting finished. Request for certificate was submitted
today. Comm. Weidner would rather vote on this certificate after seeing all materials before the
commission (i.e., order reviewed, letter granting permission to do work, etc.).
MOTION AMENDED: Add: "and also contingpt upon ability to get permission to enter land
for the purposes of replication Wp;rk."
POWERS- SADOWSKI; all in Ihypl VOTED
MANSFIELD CONSERVATION COMMISSION MEETING MINUTES - PAGE 5
MAIN MOTION: Powers in favor, Sadowski, Weidner MOTION FAILS
NEW BUSINESS: Mr. Barske - -who has worked for Connecticut Fish and Game as well as the
Army Corps, and who has done extensive work with pre- treatment marshes - -and Chairman
Cauldwell travelled up the river from Mill Pond; tested for silt. Depth of silt varied but couldn't
find bottom of silt in some places. Silt is a result of lost velocity before the water ever gets to
pond. Mr. Barske felt it was a remarkable habitat/area; his recommendations were that the dam
should be lowered by 6 inches and the pond should be dug out about five or six feet. His initial
consultation was free; after that, his fee is $75 per hour. Dick suggested having him come in for a
July meeting, then return to discuss issues with Beta Engineering.
MOTION: To meet on July 18 for the purpose of discussing the above with Mr. Barske, and
also for the purpose of discussing Great Woods issues.
SADOWSKI- POWERS; all in favor VOTED
Meeting adjourned at 10:33.