HomeMy WebLinkAboutConservation Minutes 8/22/199494 SEP °2 AN P: 1s2
ir ACHUSLT (S
MANSFIELD CONSERVATION COMMISSION
AUGUST 22,1994
MINUTES
MEMBERS PRESENT: Gregory Cauldwell, Marilyn Powers, Paul Sadowski, Jack Smith
The meeting opened at 8:00 p.m. at Mansfield Town Hall.
Mr. Ron Bonvie presented his plans on Massapoag Fstates. The plan of record for Lot 65 is dated
8/10/94. A motion was made to accept the plan as revised. (Powers /Sadowski) The motion passed
unanimously 4 -0 -0.
A motion was made to accept the minutes of August 8, 1994, as amended. (Powers /Sadowski) The
motion passed unanimously 4 -0 -0.
PUBLIC HEARING: OPENED AT 8:00 P.M.: NOTICE OF INTENT HEARING: FOLKMAN &
ZOLA --lot 1 MAPLE STREET -- CONSTRUCTION OF A SINGLE FAMILY HOUSE AND
ASSOCIATED WORK WITHIN 100 FEET OF A WETLAND (SE211 -483).
Mr. Ralph Maloon of Rim Engineering represented the applicant. A new plan dated 8/22/94 has become
the revised plan of record. Commissioner Sadowski asked about the proximity of the hay bales to the
buffer zone. It appeared that they were within 2 feet of the zone. The Conunission will attend a sitewalk
on this parcel. A motion was made to continue the hearing until August 29,1994 at 8:00 p.m.
(SadowskilPowers) The motion passed unanimously 4 -0 -0.
PUBLIC HEARING: OPENED AT 8:15 P.M.: NOTICE OF INTENT HEARING: ALLEN
WILLIS -- WILLOW STREET -- CONSTRUCTION OF ROADWAY AND DRAINAGE SYSTEM
WITHIN 100 FEET OF A WETLAND (NO FILE NUMBER)
Mr. Ralph Maloon of Rim Engineering represented the applicant. No file number has been issued on this
project. Mr. Maloon presented the project to the Conmussion. He stated that this project was located on
the southerly side of Willow Street. The drainage study has been filed and the planning Board has
requested Flow calculations for a 100 year storm in the drainage area. (11/2" deep in a 100 year storm).
There is an earth berm in the low area on the lot, there will be 16 feet of rip rap to act as a natural filter in
the drop area of the 100 foot grass swail. No trees need to be cleared in this area. The siltration controls
will be within 70 feet of the buffer zone, this is not shown on the presented plans because it takes place off
site. The Conunissioners asked questions. Conmussioner Powers questioned the wetlands area in
Lots 8 & 9. During a previous proposal for that site she remembered that the wetland was an isolated land
that was subject to flooding. She would like to view the previous plans. Conunissioner Sadowski had
concerns over the abrupt slope on the drainage area. He felt this the flow in a storm would cause
considerable erosion and wash -out. There was also discussion on the installation of oil water separators.
Mr. Maloon was asked to contact the Town Engineer for his reconunendations. A site walk was
scheduled for this property. A motion was made to continue the hearing until 8/29/94 at 8:10 p.m.
(Sadowski/Powers) The motion passed unanimously 4 -0 -0.
Conservation Commission Minutes 8 -22 -94 pg.2
PUBLIC HEARING: OPENED AT 8:35 P.M.: NOTICE OF INTENT HEARING: (continuation)
GARY FORGET - -LOT 13 WEST STREET -- CONSTRUCTION OF A HOUSE AND
ASSOCIATED GRADING WITHIN 100 FEET OF A WETLAND. (SE211 -482)
Mr. Bill Gottwald - DMG Engineering represented the applicant on this property. He submitted a revised
plan dated 8/22/94. The Connnission visited the area during a site walk. Commissioner Powers had
observed two species of vegetation that she was unable to identify. Through some research she
determined that they were witch hazel and silky dogwood. She stated that this is an area that is in
transition and the parcel contains more uplands, than the commission had previously observed.
Commissioner Sadowski stated that he was concerned with the fill and possible drainage onto other
properties in the area. His concerns were answered after the sitewalk. Harold and Jacqueline Kiley from
West Street attended the meeting. Mrs. Kiley commented that the septic system would be 25 feet from the
lot line and it was confirmed that all trees would be removed sunject to construction. There were no other
questions from the audience. A motion was made to close the hearing. (Powers /Sadowski) The motion
passed unanimously 4 -0 -0. A draft order of conditions will be discussed at the next meeting.
PUBLIC HEARING: OPENED AT 8:50 P.M.: NOTICE OF INTENT HEARING: (continuation)
FULCO, INC. SADE'S WAY AND COOPER LANE -- CONSTRUCTION OF 6 SINGLE FAMILY
HOUSES AND ASSOCIATED GRADING WITHIN 100 FEET OF A WETLAND. (SE211 -480)
Mr. Ralph Maloon - Rim Engineering represented the applicant on this property. He submitted a revised
plan dated 8/22194. Cormussioners Sadowski and Powers attended the sitewalk. Conm»ssioner Powers
questions the flagging. She was interested in the location of the flags after #42 and if the flagging of #41
and #42 continues in a straight line. Ms. Powers was also concerned with the steepness of the slope in Lot
7. She recommended that the siltration be adequate between flags #3 - #10. Commissioner Sadowski
stated that Ire was concerned over the location of the oil water separator, if there was access to maintain
this device. The Commissioners also discussed the maintenance of the siltration controls, it was observed
that they were not being maintained properly. The Commission recommended that the applicants take
care of this as they had agreed to do so. A motion was made to close the hearing. (Sadowski/Powers)
The motion passed unanimously 4 -0 -0. A draft order of conditions will be discussed at the next
meeting.
PUBLIC HEARING: OPENED AT 9:20 P.M.: NOTICE OF INTENT HEARING: (continuation)
FULCO, INC. MONAHAN LANE, TARA ESTATES -- CONSTRUCTION OF ROADWAY AND
DRAINAGE WITH PROPOSED 4600 SQUARE FEET OF WETLAND ALTERATION
(SE211 -481).
Commissioners Powers and Sadowski did a site walk on this property, however, there were a number of
issues that need to be discussed. They felt it would be beneficial to schedule another sitewalk with the full
board of Conservation Commissioners before making a determination on this site. A motion was made to
continue this hearing until 8 /29/94 at 8:25 p.m. (Sadowski/Powers) Tire motion passed unanimously
4 -0 -0.
PUBLIC HEARING: OPENED AT 9:50 P.M. NOTICE OF INTENT HEARING: (continuation)
PAUL BOYDEN - -LOTS 1 -4 HOWE STREET -- CONSTRUCTION OF 4 SINGLE FAMILY
HOUSES WITHIN 100 FEET OF A WETLAND AND IN A FLOOD PLAIN ZONE. (SE211 -479)
The Conurnissioners visited this property on sitewalk. Mr. Boyden presented a revised set of plans dated
8/19/94. The DEP issued a number on this property, however, they commented on the possibility of the
applicant having to do a habitat study on the area. Mr. Boyden said that he will hand deliver the map to
the DEP and ask them
Conservation Commission Minutes 8/22/94 Page 3.
about this continent. A motion was made to continue this hearing until 8/29/94 at 7:55 p.m.
(Powers /Sadowski) The motion passed unanimously. 4 -0 -0.
OLD BUSINESS:
The commission discussed the situation on Balcom Street. They reviewed the plans and had many
questions on them. It was thought that the change is elevation on the driveway was due to the alteration
of the recommended piping. The Commission had required 3 12" pipes be instated. The developer had
installed 2 18" pipes. This could have affected the flow and the contour appears to be higher and wider
due to this change in piping. A memo addressing the concerns of the Conunission needs to be written.
The Commissioners were concerned with the following:
1. A copy of AS BUILT plans needs to be submitted. These plans are separate from the submitted plan
of record.
2. The contour lines need to be corrected.
3. The spot elevations need to be included. There needs to be illustrations showing the low points in
between the two driveways so that the direction of the flow can be determined and why it is flowing in
that direction.
4. The elevations showing the finish grade of the driveway need to be added.
5. The invert on the base of the pipes on both sides needs to be shown.
The Town had done some previous drainage work on Balcom Street. It was noted that this area is
composed of very hard clay and there is no recharge into the ground water. A motion was made to have
a letter sent to the developer stating the concerns of the Conservation Commission.
(Powers /Sadowski) The motion passed 3-0-1 (Smith abstained)
• The Commission took no action on the memo from the Planning Board regarding Hodges Brook..
There was not a quorum to address this issue.
• The Couunission reviewed the revised plan for Lot 8 York Road. The plan did not have a new date
listed on it, however, notations were made to show that it had been revised. A motion was made to
accept this plan as the plan of record. (Powers /Smith) The motion passed unanimously 4 -0 -0.
• The Conunission reviewed a request to release money from the bond on Jennifer Drive. The
Conunission discussed this briefly and determined that they had questions. A motion was made to
table this item until 8/29/94. (Sadowski/Powers) 4 -0 -0.
• The Conunission was copied on a memo regarding the Williams Street Bridge Project. A request
was made to ask The Town Engineer for a copy of the plans so that the Commission may review.
• The Commission was invited to the September 7, 1994, meeting of the Board of Selectmen at 7:50
p.m.
• Chairman Cauldwell would like to see the Commission institute the Rules and Regulations for the use
of Conservation Land prior to January, 1995.
The meeting was adjourned at 10:50 p.m.
Respectfully Submitted,
Maureen R. Doherty - Secretary