A motion was made to accept the minutes as amended. (Powers /Sadowski) The
motion passed unanimously. 4 -0 -0.
The following certificates and orders were approved:
SE211 -351 Partial Certificate Lot 2 - Fawn Lane (Sadowski/Powers) 4 -0 -0
SE211 -311 Duplicate Certificate Sturbridge Estates - Lots 3,4,5,8,12,15,27,28
(Cormier/Powers) 4 -0 -0
SE211 -434 Partial Certificate Lot 4 - Newell Lane (Powers/Sadowski) 4 -0 -0
SE211 -416 Partial Certificate Lot 63 Jefferson Road (Cormier /Sadowski)4 -0 -0
SE211 -483 Lot 1 Maple Street Issue as written (Powers/Sadowski) 4 -0 -0
SE211 -479 Lots 1 -4 Howe Street Issue as discussed (Sadowski/Powers)4 -0 -0
PUBLIC HEARING: NOTICE OF INTENT HEARING: (continuation) Paul
Boyden, -- Lots 1 -4, Howe Street -- construction of 4 single family houses within 100
feet of a wetland and in a flood plain zone. (SE211 -479)
Dick Lewis told the Committee that he spoke with Patty Kellogg of the D.E.P. about the
notation on habitat population concerning SE211 -479. Ms. Kellogg stated that it was up
to the local boards to determine the necessity of a habitat study oil certain parcels.
Commission Sadowski was concerned that this could be a parcel with cumulative effects
on the habitat. he was also not comfortable with the D.E.P. phasing of "habitat potential'.
Commissioner Powers questioned how much area would be affected because of
compensatory flood storage replication. The Commission discussed with the
representatives to have the area replicated with the existing vegetation in an area located
behind a stone wall. This could be a condition on an Order so that the area is not
developed into manicured lawn. A motion was made to close the hearing.
(Sadowski/Cormier) The motion passed unanimously 4 -0 -0.
PUBLIC HEARING: REQUEST FOR DETERMINATION OF APPLICABILITY:
Town of Mansfield -- Intersection of School & Plymouth Streets -- Review and
establish wetland boundaries to plan for future construction.
MINUTES SEPTEMBER 12, 1994 CONSERVATION COMMISSION 2
Dick Lewis presented the plans on behalf of the Town of Mansfield. The plan of record
was revised 9 -9 -94. Mr. Lewis stated that lie and members of the Conservation
Commission toured this area recently on a site walk to set the wetland boundaries for
possible future use by the Town. He stated that much of this area was determined by the
herb layer In most cases the Commissioners confirmed the location of the wetland as
established In the past the Conservation Commission has encouraged the wetland
identification process prior to plan development. Though the Commission did express
concern over the fact that the Town had no plans for this parcel. Mr. Carl Clemmey -
South Main Street, (a concerned resident) stated that for the record he would like to
know if the Conservation Commission would walk any parcel of land that had been
flagged to determine the wetland boundaries at this time of year. The Commission stated
that if the boundaries had been determined then they could and have walked sites to
establish the accuracy of the flagged wetlands. Mr. Clemmey stated that he would like to
see test borings done on this site in March. He also stated that he did not want that parcel
to be used for a fire station. Chairman Cauldwell stated that the Town should be made
aware that the wetlands were determined by the herb layer and that the area could change
seasonally. However if the boundaries are accepted tonight then they would be
established as the legal boundaries for three years. A motion was made to close the
hearing. (Sadowski/Cormier) The motion passed unanimously 4 -0 -0. A motion was
made to give a POSITIVE ONE determination. (Powers /Sadowski) The motion
passed unanimously 4 -0 -0. A motion was made to send a cover letter to the Board
of Selectmen and The Town Manager to express the concerns of the Commission in
regards to this parcel. Copies of this memo will be sent to the Town Engineer and
the Fire Chief (Powers /Sadowski) The motion passed unanimously 4 -0 -0.
PUBLIC HEARING: NOTICE OF INTENT Edward Jerome, - -Lot 108 Bird Road,
Construction of driveway across a wetland to access an area to build a single family
home.
Mr. Ralph Maloon represented the applicant. He submitted a set of plans revised 9- 12 -94,
as per the sitewalk. Mr. Lewis asked if a house could be built on the fiont part of the
parcel. He also asked that the compensation/replication area be drawn in 20 scale to
show more detail. Commissioner Sadowski asked if this project had been discussed with
the Army Corp. of Engineers? He questioned if this area would require a federal permit.
His other concerns were the location of the house at the back of the lot, and the success
of the replication area. He was unsure if we could write an order to protect the area.
Commissioner Powers was also concerned over the fact that this was located in the
ACEC, she was not ecstatic over the location and the hydraulic connection of the
replication area. She asked if the fiont of the parcel could be used as an alternative.
Chapman Cauldwell asked the applicant if the abutter would allow him to use his land to
access this back portion of the parcel. He stated that the applicant had to prove that there
was no reasonable alternative access to his land. He also asked if he could draw plans that
would show the house on the fiont portion of the lot. A motion was made to continue
this hearing. (Powers /Sadowski) The motion passed 4 -0 -0.
MINUTES SEPTEMBER 12, 1994 CONSERVATION COMMISSION 3
PUBLIC HEARING: V.A.S. Land Corp.; -Lot C, East Street -- Construction of
single family house and associated work within 100 feet of a wetland. (SE211 -487)
Mr. Ralph Maloon represented the applicant. He submitted plans revised 9- 12 -94, as per
the sitewalk. Commission Sadowski asked if the siltation control could be pulled back
towards the drywell area. He felt that it was too close to the wetland. He also asked if
the drywell could be moved closer to the house. Commissioner asked if there was an
approved Board of Health Plan. A motion was made to close the hearing.
(Sadowski/Powers) The motion passed unanimously 4 -0 -0.
PUBLIC HEARING: ABBREVIATED NOTICE OF INTENT: Andres Gazzolo, 10
Reservoir Street -- regrading of approximately 50 square feet of site adjacent to
parking area within 100 feet of a wetland.
Mr. Bill Buckley represented the applicant. The area was flagged by Drown Engineering.
Mr. Buckley told the Commission that they were proposing to regrade an area of about 50
square feet. He stated that he was proposing erosion control barriers to protect the buffer
zone. He showed the Commission the plans which showed the proposed conditions. He
stated that the grading should encroach 6 feet into the buffer zone. The area should have
a 2 -1 grade. The work would be done in the fall to be completed on or before November
1,1994. Commissioner Sadowski stated that he had observed the bottom of the silt fence
needed to be dug in. Mr. Buckley stated that the fence was put up as a guide to the limit
ofwork. The fence is well outside the buffer zone. The hearing was opened to the public
for questions. Mr. Dan Clemmey-So. main Street (an abutter) stated that the corner of the
building is close to the buffer zone. he asked if he could see an as -built plan of the
buildings. M. Clemmey asked if the engineer could certify the footprint of the building.
Mr. Buckley stated he could. Mr. Clemmey questioned the wetland line stating that lie felt
they were working within the buffer zone and the area of grading was not 50 feet but
closer to 1000 square feet. There were no other questions or comments fiom the
audience. A motion was made to continue the hearing. (Powers /Sadowski) The
motion passed unanimously. 4 -0 -0.
PUBLIC HEARING: NOTICE OF INTENT (continuation) Allen Willis -- Willow
Street -- construction of roadway and drainage systems within 100 feet of a wetland.
(SE211 -481)
Mr. Ralph Maloon represented the applicant. He submitted a revised set of plans dated 9-
12-94 as per the site walk. The Commission reviewed this area during a recent sitewalk.
Commissioner Powers noted the following flagged areas 463 -78, #42 -10 as defined. The
following flagged areas were either not located or defined #33 -24, #9 -1- were not defined
and there were BV W reserved rights on the rest of the lots. A motion was made to close
the hearing. (Sadowski/Powers) The motion passed unanimously 4 -0 -0.
MINUTES SEPTEMBER 12, 1994 CONSERVATION COMMISSION 4
PUBLIC HEARING: NOTICE OF INTENT (continuation) Falco, Inc.--Monahan
Lane, Tara Estates -- construction of roadway and drainage system with proposed
4600 square feet of wetland alteration. (SE211 -481).
A letter was received fiom the applicant stating that they would like to withdraw their
application on this project. Commissioner Powers stated that Dick Lewis should send a
letter to the applicant stating that the Commission had closed the hearing and that the
wetland area had not been defined. A motion was made to administratively close the
hearing and to send a letter(ce D.E.P.)to the applicant stating the wetland line had
not been defined. (Powers /Sadowski) The motion passed unanimously 4 -0 -0.
PUBLIC HEARING: REQUEST FOR DETERMINATION OF APPLICABILITY:
Town of Mansfield - -Maple Street -- Installation of sidewalk between Jennifer Drive
and Franklin Street.
Mr. Robert Swanson, Town Engineer, represented the applicant. Mr. Swanson stated that
recently the Town had reclaimed Maple Street, during that time the residents of 558
Maple Street had requested a sidewalk for their handicapped child. He noted that the
Board of Selectmen had not voted to approve this requested as of this date. Mr. Lewis
commented on the stabilization of the back side of the sidewalk, he suggested that a slope
of 3 -1 with loam and seed. Commissioner Sadowski asked why were their stakes off the
edge of the road by 22 -24 feet. It was noted that these were the property line corners.
Commissioner Powers noted inconsistencies with the Plan of Record. She stated that the
catch basins are illustrated to be in the middle of the street when in fact they are not.
Chairman Cauldwell asked were the wetland compensation would be. The Commission
felt they needed to review this area with a site walk. A motion was made to continue
the hearing. (Powers /Sadowski) The motion passed unanimously 4 -0 -0.
PUBLIC HEARING: REQUEST FOR DETERMINATION OF APPLICABILITY:
Michael Hinchey - -9 Robinson Court -- filling and grading work in backyard for
landscape proposes within 100 feet of a wetland.
Mr. Michael Hinchey represented the applicant. Mr. Hinchey stated that the applicant
would like to put in a boulder retaining wall and grade a small area of his yard to by used
for recreation.. Commissioner Sadowski stated that the edge of the pond is the end of the
wetland there was no other vegetation passed that point. Commissioner Powers stated
that the area was generously flagged. A motion was made to close the hearing.
(Sadowski/Powers) The motion passed unanimously 4 -0 -0. A motion was made to
issue a NEGATIVE THREE determination. (Sadowski/Powers) The motion passed
unanimously 4 -0 -0.
MINUTES SEPTEMBER 12, 1994 CONSERVATION COMMISSION 5
HODGES BROOK SE211 -356:
The Commission discussed the Hodges Brook Project: they stated that they would like to
see the plans revised to show where the detention area should be The would also like Mr.
Lewis to send a letter to RIM Engineering stating they had questions on Lot 17 and they
would be scheduling a sitewalk for September 19, 1994.
WILLIAMS STREET BRIDGE:
The Commission briefly discussed Williams Street Bridge. They had not received plans
yet from the State.
MILL POND PROJECT:
The Commission asked that this project be scheduled for an upcoming meeting so they
may review. The Commission will have to make a determination of the scope of the work.
NEW BUSINESS:
Mike Madon, an Eagle Scout applicant is interested in maintaining a trail in Maple Park.
11te Commission discussed this project and generally thought that it was a good idea to
get started.
JENNIFER DRIVE:
The commission discussed the possible release of $2500 fiom the bond on Jennifer Drive.
A motion was made to release $2500 from the Bond on Jennifer Drive and that the
area would be reviewed in June, 1995 (Powers /Sadowski) The motion passed 4 -0 -0.
A motion was made to adjourn the meeting. (Sadowski/Powers) The meeting closed
at 11:45 p.m.
The next meeting was scheduled for September 19, 1994 to review, no public hearings
would be set for that meeting,
Respectfully submitted:
Maureen R. Doherty
Secretary