Loading...
HomeMy WebLinkAboutConservation Minutes 9/19/1994it u, 03 OU 17 PM 3. 33 t MANSFIELD CONSERVATION COMMISSION MINUTES ri_LD SEPTEMBER 19,1994 !' i A'' .`; A (, U S E T TS MEMBERS PRESENT: Gregory Cauldwell, Shirley Hanlon, Marilyn Powers, Paul Sadowski, Jack Smith The meeting opened at 7:35 p.m. Tonight's meeting was a workshop, no public hearings were held. WILLIAMS STREET BRIDGE: The Commission reviewed preliminary plans that were received fiom the State for the Williams Street Bridge. It was decided that the Conservation Commission will have to issue permits and an order of conditions on this project. It was noted that there would be some conservation land taken for this project. The Commission felt that it would be setting a bad precedent to give land without some form of agreeable compensation. The reasoning for the construction project was also discussed. The discussion concluded with the following questions and issues being raised. • Can the present bridge be made safe and durable as a walk way with some recreation area? • Have the new bridge constructed as a darn to hold back any flood waters fiom the present dam/bridge. • Will there be a significant loss of BV W - how will the bank be increased? • How much conservation land will be taken, Who will own the land remaining? The Conservation Commission would favorable look upon this project if these additional factors were met. • Project must be done as a public safety issue. • A clear statement must be set forth station that conservation land isn't just there for the taking, this would be a special circumstance that would not be detrimental to the conservation effort in Town. • The opening -- relocation of the roadway clearly must be determined as a hazard. • What is the soundness of the present structure is it safe for a walk way and other recreational uses? • The Conservation Commission may not convey this property without reaching a consensus of agreeable compensation with the Town. • What are the proper legal procedures involved in the taking of conservation land? • How many square feet of land would be involved? • Would the future bridge be designed to withstand the possible collapse of the present dam/bridge? What is the structural soundness of the bank -pond -dam? The Commission felt that this area would be better suited for more active recreation and not as a conservation area. A motion was made to ask Dick Lewis to draft a memo for review on the Williams Street Bridge project. (Sadowski/Powers) The motion passed 5 -0 -0. MILLPOND: The Commission reviewed the plans for Mill Pond. They discussed the project as it was presented in a prior meeting by Dr. Phil Barske. The Commission asked if they could receive a revised plan from Beta Engineering. They also wanted to know, from an engineering standpoint, what effect the lowering of water would have on the project. Commissioner Sadowski did not see a problem with some limited escavation, the added depth of the water would be beneficial for the fish population. Chairman Cauldwell felt that a private person may not want to be involved in a small escavation project. He also indicated thet is it important not to move the sandbar and have a drain installed as deep as the pond for future clean -out projects. The slopes would need to have a gradual 5 -1 or 6 -1 grade. Commissioner Powers was concerned with the time fi•ame and the grant money that was awarded. She asked if we could ask the Town Engineer and Beta Engineering for a time frame. Ms. Powers would like to be sure that we act responsibly to insure the grant money is not lost. BALCOM STREET: The Commission reviewed the as built plans on this project. Dick Lewis discussed his recommendations on this project. The Commission felt that the hydraulic connection was hindered when the developer changed the pipes from the recommended three pipes to the two pipes. The present situation is causing a dam effect. Dick will write a letter to the developer on this issue. Order of Conditions Lot C East Street: A motion was made to issue as written. (Sadowski/Powers) The motion passed 5 -0 -0. Mr. Lewis told the Commission that he had received a phone call from a resident on Gilbert Street stating that an illegal bridge had been built on the Ash Property? Dick was directed to send a letter to the Board of Selectmen informing them A call was received from National Lumber requesting that they be allowed to dump snow on the Maple Street Conservation Land? The Commission would not discuss this unless they received a written request. Chairman Cauldwell welcomed our newest member Shhley Hanlon to the Commission. Shirley has been eager to get started as she has been attending the sitewalks and meeting for several months now. The meeting adjourned at 9:30 p.m Respectfully submitted, Maureen R Doherty - Secretary