Loading...
HomeMy WebLinkAboutBOH Minutes 7/30/1974MUT Yi'_;S Present: Clerk Folan B. Roche, L. Andrews 1. Regarding Home health Services bill., cruestion was raised as to why entire bill should be paid nova. Letter to Barbara Paulson ? to meet with Board on August- 13 to discuss budget. 2. Minutes of July 23 Motion: To approve ( "ndrews- Roche, all in favor) T)TiD 34 Messrs. Robinson and Crer>nwood of New "ngland Oracni Steel and their engineer met with Board with a plan showing their connection to town sewa�e and hol dins; tank for pickling *, waste. They propose to run 6" sewer alone' rear of building 7551, connecting to existing sewer on high Street. 8,010 gallon sealed to k for pickling waste, to be picked up every 15 we ks. Board advised them that connecting to Town sewer requires approval of Board of Selectmen and State. Board would want Building Inspector to check installa- tion of holding tank. 4. Oorrespondeace ` Comprehensive Planning Corp. - election of officers Buildin; Inspector "eport Attleboro Board of health - Staples installers permit From Planning Board to P'. L. White,- Woodland Park Commonwealth of Mass. - rabies - re£ered to Town Manager and Dog Officer Bill from Swartz office Supply $12.78 Motion: To ;gay (Roche - Andrews, all in favor) VOTED Building Inspector report Prom State Board of Health - Maple 'ark bacteria count From residents of Williams Street regarding stump dump at Camelot Estates From Town of Foxboro - installers permit for Turtlebrook From Department of Natural Resources - certificate of compliance - '` John Morley (Canoe River Acres) Dept. of H.•alth to Rev. Higgins, it, Mary's Rectory - regarding, burning of property. Bill from Swartz Office Supply 56.95 Home Health Services bill Motion: To table to get further discussion on bill (Andrews- Roche, all in favor) VOTED 5. Stump Dumps - letter to Norman Gray,Trsnsit Seeding and James "i Antosca, Canalot Estates to meet with us on Aus:ust 13 with envineering plan to show location and elevation of stumps, and to cease and dosist operation, until that meetin; {. 6. Application for installers permit for DePlasado. Letter. to Town of Wrentham asking work experience. 7. Letter to Doug King regarding motion of July 16 to perc 9 lots and that remaining lots not be perked until opening; of regular perc season. Notion: That remai:aing lots within Canon Over Acres not be perked until the opening of regular perc season, December 1. (Andrews- troches all in favor) VOT; D 3. Motion: To postpone any action on Norriak problem for two weeks because we•are workin,, * *, toward correctitt_ the problem. (Andrews- Roche, all in favor) VOTED 9. Repair permit for Frank Nilson, Buogay Road. 10. Sca-rpellini, John Street - postpone for another two weeks. 11. Application for construction works permit: Prank. Allen Lot B Motion: To approve (Andrews- Roche, all in favor) VOTED Lot 11 Village Estates Motion: To approve (Andrews- Roche, all in favor) V01D 12. Manof. Jellinek spoke to Board on what she felt was discrepancy on Maple Lark bacteria count. She had a test taker by_a private lab, which shows a much higher count than State report. Letter to State requesting explanation of testing and reporting form. 13. Letter ,to Gibson Bros. regarding guarantee on Alexaoder septic system. They did not show at July 23 meeting as requested. Motion: That if t4ey do not submit an ayrenment by August 13 that Board will revoke their permit to install _septic systems. (Andrews - Roche, all in favor) VOTED Letter to Gibson Bros. to that effect. L'F. Letter to Drakes to meet with us on August 13 with plans for truck wash and grease traps. Y._ July 30, 1974 - 3 - 15. Brown Ave. - L. AA revs viewed lot, some fillip; at the road and 5 -6 feet in, notices no stumps. Lett r to Conservation Commission, copy to Board of Selectmen, stating that there was some filling of wet lands, that were there was a small pond is now dry, that ahc.fillin to the best of our knowledge will have little or no effect on wells in the area, that any action required should be by the Conservation Cormn:ission under Hatch Act. 16. Letter to Albert T. Bruun that his pert application for out of season test is still under consideration and Board will hopefully reach a decision on August 13. 17. Wading River ::'ark - letter to Si.dnev Uovi.ch that Board will reserve decision pending subm.s: ion of Definitive Subdivision plan and conformance to Board of 11;>alth Subdivision Regulations. 18. Lett --r to New lins {land Drawn Steel stating, Board approves concept of connecting to sewer, continp;ent upon approval from Board of Selectmen. request proposed schedule of action and that Board will require Building; Inspector to inspect hold:i.nsy, tank before being covered. Meeting adjourned 10:30 Uate