Mansfield Conservation Commission')
Monday, February 12, 1996
Minutes
In Attendance: Acting Chairman Greg Cauldwell; Commissioners
Jill Druhan- Albanese, James Burke, Shirley
Hanlon, Greg Pastore; Dick Lewis; Patti
Papagno, Commission Secretary
Meeting called to order at 7:35 p.m.
Superior Realty Trust -- Notice of Intent Hearing
Re: Keli Green Subdivision - continuation. Ralph Maloon
presented a plan encompassing necessary replication for
historic wetland filling on Maple and Winter Street lots.
Mr. Cauldwell asked about the water flowing into the area,
whether more water would be generated. There is some surface
flow which goes to culvert on the far west on other side of
road. Last culvert they show and then goes to surface
water. What's flowing through will continue to flow
through.
Motion: [Hanlon /Pastore]To close the Hearing;
Vote: Unanimous - [5 -0].
Andres Gazzolo - Rectuest for Determination Hearin
Soccer facilities: Bill Buckley,represented the applicant.
Based on site walk of 1/27/96, flags were adjusted by Carl
Drown. The Conservation Commission was given a revised plan
showing changes to the line, and a cover letter with quick
description of the changes. The plans show old and new
conditions. 100' buffer zone. Carl Drown discussed flagged
areas.
Karl Clemmey was given a copy of the cover sheet - he
previously received the revised plan.
Forrest Emery, of Phoenix Environmental Company, hired by
Mr. Clemmey, discussed a variety of issues concerning the
area including:the catch basin locations as depicted on the
February 8, 1996 plan; grade lines; and, specific
vegetation. Mr. Henry requested written permission from the
owner to do another site walk. He felt that the wetland
boundary should be determined by use of the State's Data
Sheets. Mr. Lewis stated that since work is clearly in the
buffer zone the detailed data sheets are not necessary. Mr.
Emery feels that the isolated wetland pocket is under
Mansfield Conservation Commission Meeting Minutes
February 12, 1996
Page 2
Federal jurisdiction. Lastly, he did state that he felt
wetland boundary would not move substantially if additional
review was carried out.
It was pointed out that there will be a burm around the
parking lot. Paved swale will discharge into natural
depressions where settling can occur. Catch basins will have
to be cleaned. If leaching basins fail, they will have to
come back in for additional basins.
Motion: [Pastore /Druhan - Albanese] to issue negative 3 --
Conditions (litter cleanup; and, extend haybales).Dick Lewis
will walk the site. Vote: Unanimous.
Motion: [Burke /Pastore] to close Hearing. Vote: Unanimous,
to issue as discussed.
Folkman & Zola Builders - Notice of Intent Hearin
[Druhan- Albanese abstains] (George Fram Estates - Bird Road)
Ralph Maloon - 1991 zone approved with 19 lots done by DMG
Engineering. Abuts Town of Foxboro /Sharon -- no wetland
filling , work within buffer zone - 3 detention areas on
site. Flow out to Little Canoe River. The Conservation
Commission needs to do site walk. Reference points will be
marked for the Conservation to review at the next meeting.
DMG flagged in -house (1991).
Abutter Kevin Donnelly -- Concerned with public /private
water supply; site is in Mansfield Water Protection Zone.
Groundwater discharge important especially since it is an
aquifer. Discussed the flow of water including peticides.
Run -off is concern with more homes.
Abutter contends poorly draining soils. Mr. Maloon pointed
out that every single family home will have to pass soil
testing.
Abutter Frank Tibbet - Concerned with runoff from road
through detention and how much will flow into swamp? His
only concern is water runoff.
Abutter Doug Young asked about the permit process and if
there are any other meetings the Commission plans to hold
to ask questions. Mr. Lewis stated that this would be the
case if there is a proposal to modify subdivision.
Mr. Cauldwell informed Abutter John Harrington about the
site walk procedure.
Mansfield Conservation Commission Meeting Minutes
February 12, 1996
Page 3
Mr. Lewis noted that there are three detention basins with
compacted gravel bottoms. Drainage will go through oil /water
seperator per requirement of Planning Board.
Motion: [Pastore /Burke] to continue Hearing until after the
site walk scheduled on February 24, 1996 at 7:00 to 8:30
a.m. ,(2nd walk on March 2) to March 4 at 8:00 p.m. Vote:
Unanimous.
Chris Marcheselli - Notice of Intent Hearing
(Lot 1, Maple Street)
Mr. Maloon presented the plan. Proposed grading is about
60' from wetland. Mr. Lewis will take a site walk.
Motion: [Druhan- Albanese]to continue the Hearing until 7:45
p.m. on February 26, 1996. Vote: Unanimous [5 -0].
Superior Realty Trust - Notice of Intent Hearing
(LOT 2 - MAPLE STREET - DRIVEWAY ON KELI LANE)
Mr. Lewis will do a site walk. Mr. Burke pointed out that
the grading line is missing. Engineer will review.
Motion: [Pastore /Burke] Hearing to be continued until 8:00
p.m. on February 26, 1996. Vote: Unanimous [5 -0]
Mac Homes - Notice of Intent Hearing
(Lot 185 Canterbury Estates)
Mr. Maloon representing ownjer: Lot on sewer, road built
with base coat. Everything done on road except seeding and
grass. Order on subdivision issued in 1992. Flags are still
out. Members will individually walk through site.
Motion: [Pastore /Hanlon] to continue Hearing until February
26, 1996 at 8:10 p.m. Vote: Unanimous [5 -0].
MINUTES
Changes: Carl Brown to (p. 1) Carl Drown /Lowey to Loving.
Motion: [Pastore /Hanlon] To approve the Meeting Minutes of
January 22, 1996 as amended. Vote: Unanimous 4 -0
CERTIFICATES OF COMPLIANCE
211 -451 - LOT 6 - York Road - Mr. Lewis recommended a
partial.
Motion: [Hanlon /Pastore] to issue a Partial Certificate of
Compliance. Vote: 4 -0 -0
Lot 1 Dean Street SE- 211 -539:
Motion: [Hanlon /Patore] to issue an Certificate of
Compliance. Vote: Unanimous
NEW BUSINESS
The Board of Selectmen will be holding a meeting on
Wednesday at 8:00 p.m.with Chairmen of Boards and Committees>
Wegarding the Williams Street Bridges Greg Cauldwell does
not feel it is appropriate to use Conservation Land for a
new bridge. Additional reviews and discussions will be
carried out. We have not received further information. 75%
of the drawing is not yet on file. Project reviewed.
Space Bond Bill signed today.
Motion: [Pastore /Druhan- Albanese] to adjourn at 10:10 p.m.;
Vote: Unanimous [5 -0]