HomeMy WebLinkAboutConservation Minutes 7/27/1998TOWN OF MANSFIELD CONSERVATION COMMISSION MEETING MINUTES JULY 27,1998 Present: Chairperson Shirley Hanlon; Commissioners: Christopher Boyer; Greg Cauldwell; Mark Cook; William Ottaviani; Richard Lewis, Environmental and Conservation Planner; Patti Papagno Conservation Commission Secretary Chairperson Hanlon called the Meeting to order at 7:30 p.m. Eagle Scout Project Presentation: Eagle Scout Brendan Holt provided a project description and defined the process he must follow in order to bring this work to fruition. This project will take place in September at some point. Dick Lewis did note that Mr. Brendan should contact him prior to starting anything in this area and also noted that if any questions should arise, contact him in the Office. The Commission commended Mr. Holt for the ingenuity used to create this project and his fine presentation of the project. PUBLIC HEARINGS 7:35 P.M. Stan Feck c/o Christian & Feck— Continued Notice of Intent Hearing Re: Woodland Park Subdivision, South Main & Fruit Streets Construction of roadways, utilities, and drainage work associated with 45 lot residential subdivision with work with wetland resource area and the 100 foot buffer zone. The File Number is SE211 -591. This has been filed with M.E.P.A. for sewer extension. D.E.P. suggested meeting with the Corp. of Engineers regarding the isolated wetlands. No meeting has been scheduled. The Commission recognizes there may be other jurisdictions out there but one issue is erosion control bales — the hay bales were not shown on the plan. The plan does not show erosion control along the roadway or the berm. Dick Lewis needs to see this before work commences. Motion: [Boyer /Cook] to close the Hearing. Vote: 4 -0 -1 (Greg Cauldwell abstained.) Motion: [Boyer /Cook] to issue Order of Conditions. Vote: 4 -0 -1 (Greg Cauldwell abstained.) 7:45 P.M. Charles Plante — Continued Notice of Intent Hearing Re: 48 Darby Drive Construction of house and driveway, with septic system and grading work within 200 feet of a wetland resource area. Siltation control is 10' away from wetland at flag #5. The house has been moved on the plan. Mr. and Mrs. Charles Plante were present at the Hearing. One condition is that work shall not begin until they have Board of Health stamp. The Board of Health will not issue a permit until a test hole is put in. The File number is SE211 -590. Motion: [Cook/Boyer] to close the Hearing. (Greg Cauldwell abstained.) Vote: 4 -0 -1 Motion: [Cook/Ottaviani] to issue the Order of Conditions. Vote: 4 -0 -1 (Greg Cauldwell abstained.) Town of Mansfield Conservation Commission Meeting Minutes July 27, 1998 Page 2 8:00 P.M. Chatham Realty Trust — Continued Notice of Intent Hearing Re: Residential Compound off of Bird Rd., near Maple Street Construction of access drive for a 6 -lot Residential Compound with 3 single - family homes within 100 feet of a wetland resource area. The File Number is SE211 -589. The Commission reviewed the Order of Conditions for this project. Lot 5, Flag 82- 83 -84, opposite 94 on Area 5 around hay bales with silt fence. Dick Lewis will add that in to the Order. Motion: [Boyer /Cook] to close the Hearing. Vote: 5 -0 -0 Motion: [Cauldwell /Cook] to issue Order of Conditions as amended. Vote: 5 -0 -0 8:15 P.M. Sanford Ecological Services — Request for Determination of Applicability Re: Great Waves Water Park, South Main Street Review of wetland boundaries per the Site Plan to determine the accuracy of the wetland delineation. A site walk was held on Saturday and some delineation flags are being moved in three locations on site and those revisions are shown on two revised sub - plans. For orientation purposes, the plan was reviewed. Three minor changes were made: 1) minor changes at Z49 & Z51, flag Z50 removed; 2) change made at Z62 and Z64, Z63 removed — wetland line brought down; and, 3) removal of flags at beginning swale and four series of flags at Y127 connected to Y130, 128 and 129 removed. In addition they identified two small vegetated wetlands. The series of tests being conducted, i.e. drainage study, were reviewed by the Commission. Lenny Flynn was present to discuss the project, Abutter Karl Clemmey said he was concerned with the size of the project and he felt that the Commission needs to look at a variety of issues before making a decision. Forrest Emery was present to discuss the area he reviewed and point out concerns. Both Mr. Clemmey and Mr. Emery felt an outside consultant should be hired to review issues and questions. It was also mentioned that the purpose for this Hearing was to approve validity of this line and to issue a Determination of Applicability. Motion: [Cook/Boyer] to close the Hearing. Vote: 5 -0 -0 Motion: [Cauldwell /Cook] to issue a Positive 1 Determination. Vote: 5 -0 -0 8:35 P.M. Fruit Street Realty Trust — Notice of Intent Hearing Re: Stillbrook Farm Subdivision, Fruit Street Construction of roadway, with drainage and associated grading work within 100 feet of a wetland resource area. The Applicant nor his Engineer were present. Planning Board is reviewing subdivision plans. Motion: [Cauldwell/Ottaviani] to continue the Hearing until Monday, August 17, 1998 at 7:45 p.m. Vote: 5 -0 -0 Certificates of Compliance SE211- 524 Neil Levine — Full Certificate of Compliance Re: 596 Maple Street Motion: [Cook/Boyer] to issue a Full Certificate of Compliance. Vote: 5 -0 -0 Town of Mansfield Conservation Commission Meeting Minutes July 27, 1998 Page 3 SE211 -540 Riecio Builders — Partial Certificate of Compliance Re: Lot 7, 30 George Fram Estates Motion: [Cook/Ottaviani] to issue a Partial Certificate of Compliance. SE211 -417 Folkman & Zola Builders — Certifrcate of Compliance Re: Lots 18, 56 -68 —73, Stearns Avenue Motion: [Cauldwell/Cook] to issue Certificate of Compliance. SE211 -488 Michael Peterson Re: Lot 84, Marjac Way, Fast Street Vote: 5 -0 -0 Vote: 5 -0 -0 Motion: [Cauldwell /Cook] to issue both a Partial and Full Certificate of Compliance. Vote: 5 -0 -0 Requests for Extensions SE211 -507 Town of Mansfield — Request for Extension Re: Walsh Well Water Plant, Gilbert Street The Order of Conditions were issued in 1993. The Town hopes to start work soon. The Extension, if issued, would be effective until November, 1999. Motion: [Cauldwe0/Cook] to issue this Extension. Vote: 5 -0 -0 SE211 -512 Norwood Engineering — RequestforExtension Re: 124 Forbes Blvd. The Order of Conditions was issued in September, 1995, and they have indicated no changes to the plan. The plan would be done in about one year. If there are any questions, they will meet with the Commission. Motion: [Cook/Ottaviani] to issue this Extension. New Business Vote: 5 -0 -0 Land Acquisition: Mr. Flynn met with the Commission to review proposed land acquisitions. Next Meeting: The next Conservation Commission Meeting will be held on Monday, August 17, 1998 at 7:30 P.M. Adjournment: Motion: [Boyer /Cook] to adjourn the Meeting at 10:00 p.m. Vote: 5 -0 -0