HomeMy WebLinkAboutConservation Minutes 9/28/1998MANSFIELD CONSERVATION COMMiSSiON
MEETING MINUTES SEPTEMBER 28, 1998
!o UL, 1 6 1 ril T
Present: Chairperson Shirley Hanlon; Commissioners: Paul Boyden; Christopher Boyer; .Mark,
Cook; Greg Cauldwell; William Ottaviani; Jack Smith *; Richard Le ?,.Ehviionmeritia 1r1d
Conservation Planner.
Chairperson Hanlon called the Meeting to order at 7:30 p.m.
Minutes: September 14th meeting -- add that Minutes of July 27th were accepted. Motion (Boyer /Cook)
to accepted as amended. Voted 5 -0 -1 ( Cauldwell Abstains)
Public Hearings
7:35 p.m. Clair Cole -- Request for Determination of Applicability
Re: 1110 East Street; Construction of addition to single family house with site
work within 100 feet of a wetland resource area.
Joseph Cole outlined the project. Work had begun prior to an application to the Commission; silt fence was put
up in August when Shirley Hanlon inspected the site along with the Building Inspector. Dick Lewis has visited
the site and has not found any erosion occurring. The silt fence will stay in place until the lawn is established.
Abutter Ken Mello raised question about the amount of water coming over the driveway, which has a 12" pipe
under it. He was told that he and Mr. Cole would have to make an application to the Commission to change the
piping. Motions (Cook/Boyer) to close the hearing and issue a Negative # 3 Determination. Voted 6 -0 -0.
7:45 p.m. Paul Jodice -- Notice of Intent Hearing
Re: 10 Riverwood Drive; Construction of addition to a single family house with
the driveway and associated site work within 100 feet of a wetland resource area.
Bob Colleran, of Hutchins- Trowbridge, presented the plans. The proposed activity will be taking place within the
existing lawn/landscaped area adjacent to the house. Questions from the Commission on the distance between the
haybales and the wetland boundary, and the trench along the driveway, it was felt that the silt controls could be
closer to the proposed addition; the trench will capture water coming off of the driveway and get it back into the
ground prior to reaching the wetland. No DEP File #. Motion (CauldweWOttaviani) to continue until 10/19/98
at 7:45 p.m. Voted 6 -0 -0.
8:00 P.M. B & M Realty Trust -- Notice of Intent Hearing -- Continued
Re: River Edge Estates, Ware Street; Map 33, Lots 5 & 6
Construction of residential subdivision with grading and storm water drainage
system within the 100 foot buffer zone from a wetland boundary and the 200 foot buffer zone
from the edge of the Canoe River.
[ *Jack Smith enters]
Jim Dunn, Drum - Mckenzie Engineering, indicated that he had spoken to DEP, which said any work in the
intermittent stream/drainage channel would trigger a Water Quality Certificate process if this work was combined
with the overall subdivision. General discussion of whether the channel is perennial or intermittent; the
consensus was that it was intermittent. Mr. Dunn presented a 20 -scale plan highlighting the proposed work in the
channel, which would involve creating a channel approximately 5 feet wide at the bottom with side slopes. This
new channel would blend in with the beginning of the more defined channel area. Some discussion of how to
clean/restore the other sections of the channel. It was felt that the removal of small trees and shrubs in the bottom
of the channel would be satisfactory. Consensus that a separate application for the channel will be filed. No DEP
I
9/28/98 Conservation Commission Minutes page 2
file number yet; Jim Dunn will be submitting new material to DEP this week. Motion (Cook/Boyer) to continue
the hearing until November 9th, at 7:45 p.m. Voted 7 -0 -0.
8:20 p.m. Folkman & Zola Builders -- Notice of Intent Hearings -- Continued
Re: Lots 1, 4, and 7, Homefield Drive.
Ralph Maloon and Jay Zola presented the revised plan/proposal for Lot 4. Abutter Carol Matthews asked about
the Friday site walk. Shirley and Dick Lewis reviewed the events at the site walk on 9/25/98, where Pat Huckery,
of the Natural Heritage program, and Kyla Bennet and Stafford Madison of EPA, along with RIM Engineering
and the applicant, walked lot 4 with the purpose of establishing the boundary of the venial pool. This line was set
approximately 2 -3 feet above the delineated wetland boundary. The revised plan proposed to have the top of the
septic system at an elevation below any portion of the venial pool within the required 100 foot separation between
the pool and the system. This proposal will have to be approved by the Board of Health. Some discussion
occurred regarding the certification process for venial pools. Greg Cauldwell mentioned infrared photos. No
DEP file # yet. Motion (Cauldwell/Cook) to continue to 10/19/98 at 8:00 p.m. Voted 7 -0 -0.
Certificates of Compliance
SE211 -119 Fran Sarro, 6 Brian Lane - Partial Certificate of Compliance
Motion: [Cauldwell/Boyer] to issue a Partial Certificate of Compliance. Vote: 6 -0 -1 (Boyden abstains)
SE211 -568 National Readville Realty Trust - Francis Ave. work - Certificate of Compliance
Motion: [Cauldwell/Cook] to issue a Certificate of Compliance. Vote: 6 -0 -1 (Boyden abstains)
- --- ---------------------------------------------
Minutes August 17th meeting -- Motion (Cook/Smith) to accept. Voted 4 -0 -3 ( Cauldwell, Boyer, and
Boyden abstaining)
Motion (Cauldwell/Boyden) to send a letter to National Lumber thanking them for material for sign at Oak Street
conservation land. Voted 7 -0 -0.
Motion (Cauldwell/Boyer) to send letter of support to EOEA re: purchase of land. Voted 7 -0 -0.
Review of site walk on 9125/98 of Feck project on Stearns Ave. Applicant has given permission to wait on issuance of
order until we receive letter from Natural Heritage.
Motion (Cauld{vell/Ouaviani) to adjourn at 9:45 p.m. Voted 7 -0 -0.