HomeMy WebLinkAboutBOS MINUTES 8-27-1975BOARD OF SELECTMEN
MINUTES
August 27, 1975
Present: Chairman Caponigro, Selectmen Titus, Selectmen Colella,
Town Manager Hannon
1) Meeting was called to order at 7:40 P.M.
2) Board of Selectmen reviewed the warrant of August 26, 1975.
On a motion made by Selectmen Titus and seconded by Selectmen Colella
the Board voted to approve the warrant subject to review of the bills
in the Selectmen's office.
3) Town Manager Hannon advised the Board that there is going to be a joint
installation of officers on September 20th at 7:00 P.M. at the American
Legion Hall.
4) Town Manager Hannon advised the Board that next Wednesday there would
be an open house at U.S. Plywood in the Cabot, Cabot and Forbes
Industrial Park. It was noted that this included a clam bake.
It was the consensus of the Board to hold there regular meeting next
Wednesday at 8:00 P.M. so that they could attend this open house.
5) Town Manager Hannon noted the Bicentennial Committee is making arrangements
for a festival and that they are interested in having fireworks. He noted
it is best to go to one supplier instead of having bids and requested the
Board to waive the bid procedure for the Committee. He noted that the
estimated cost for the fireworks is between $2,000 and $2,500.
On a motion made by Selectmen Titus, seconded by Selectmen Colella, the
Board voted to waive the bid procedure due to it being such a special
item.
6) Town Manager Hannon noted that the low bidder for the Stearns Avenue
Water Main Extension was Frank Fredericks of Dedham and his bid was
$13,736. He noted that he would like to award the contract to them.
He noted that there is no. way this will be in before October lst.
He noted that $17,500 had been appropriated for thisjob.
Selectmen Colella felt that the local companies should be notified when
items of this nature are being put out to bid. Town Manager Hannon noted
that they are notified when small jobs are put out to bid.
7) Town Manager Hannon noted that the Selectmen's Association Conference
is going to be September 26th and 27th in Boston and that he has to
advise them which days the Selectmen plan to attend.
8) Town Manager Hannon advised the Board that they received an application
from Mrs. Bowed at 200 Hope Street to tie into the sewer and that there
is a problem with her present septic system.
On a motion made by Selectmen Titus, seconded by Selectmen Colella the
Board voted to grant Mrs. Bowed permission to tie into the sewer system
on Hope Street subject to assessment fees being charged.
Minutes
August 27, 1975
Page 2
9) Town Manager Hannon noted that he requested funds from the Board to
attend the International City Managers Association Annual Conference
in Seattle Washington. He requested that the funds be approved through
the Electric Light Department as administrator of the Light Department.
He noted that the conference is related to management of municipal
fields, and that he attended one two years ago and found it very helpful.
He noted that the expense should be in the area of $650 for a 5 1 day
program. Town Manager Hannon felt that it was worth his while going
and requested the Board approvethe funding of the out-of -state travel.
Selectmen Titus questioned if it would be helpful to the light
Department. Town Manager Hannon noted that it would be. He noted that
he would be attending 25 or 30 conferences.
On a motion made by Selectmen Titus, seconded by Selectmen Coleila
the Board voted to approved the out -of -state travel funds for Town
Manager Hannon to attend the International City Managers Association
Annual Conference.
10) Town Manager Hannon advised the Board that they planned to begin the paving
on South Main Street on Friday morning and that they may be done by Monday.
11) A public hearing was held on the Flood Insurance Program prepared by HUD.
Selectmen Colella read the notice of hearing as posted. Selectmen
Chairman Caponigro noted that they sent notices to all Boards and
Committees in the Town and then turned the meeting over to Mr. Bob
Archilla from HUD.
Mr. Archilla noted that he, along with his associates Judy Holloway,
and Bob Tierney, were here to solicit comments on the study prepared
for the Town. He noted that the study started in June of 1974 after a
meeting in Mansfield. He noted that prior to this a meeting had been
held with Town Officials back in December of 1974. Since then Anderson
Nichols, with Mr. Warren Gynon and Charlie Namous, helped to prepare
this study. He noted that Mansfield had been in the National Flood
Insurance Program for over 1 I years and have been participating in the
emergency phase of the program. He noted that the initial step was
to place restrictions on building. After a community like Mansfield
has been in the program for quite a while HUD will do a hydraulic study.
After the study they come up with the final draft results. He noted that
five (5) copies of this were sent to the Town and they did the appropriate
thing by forwarding the copies to the various Boards and Committees in the
Town.
Mr. Archilla noted that the meetings with the Town Officials, such as this,
is called consultation officers. This is due to the act-of 1973, which
intends that HUD be involved in all of the steps of the study. He noted
that basically the intent of this report is twofold. It is to advance the
availability of Flood Insurance by adding another layer of coverage. Also
by applying the proper risk value to the premium rate for insurance. High
risk areas will have appropriate premiums applied to that area. Theother
use of the report is the basis for adoption of a more defined flood plain
in the form of zoning. The State of Massachusetts has seen that each
community is provided with a Building Code. Under 7.80 of the Building
Code this has been defined.
Minutes
August 27, 1975
Page 3
Mr. Archilla noted that they do not insure structures underground such
as shelters. Bridges are not insurable nor any type of transportation
structure, such as roads. It only applies to buildings and utilities.
He noted that in the second, more definitive level, it is required that
no residential structures be built within the 100 year flood plain so
that the lowest point in the floor is at least 1 foot above the level of
the 100 year flood . All other requirements of the first phase of the
program still apply.
Mr. Robert Show questioned what the 100 year flood was. Mr. Archilla
noted that Congress has set up this as a basis for the flood program.
It is a 1% chance each and every year of occuring.
Mr. Archilla turned the meeting over to Mr. Tex Gynon of Anderson Nichols
who presented slides on the Flood disasteract of 1973, House and Urban
Development Act of 1969, House and Urban Development Act of 1968 as the
base of this report. He noted that the purpose of the flood insurance
program is to provide financial assistance for victims of flood
disasters in order to rehabilitate their property and to help provide
use of land where flood damages would mount steadily and rapidly.
He presented the flood plan poorective measures where you build dams
and levis and noted that the amount of damages kept rising. The other
plan is the protective measure which would keep building out of the
flood plains. He noted that flood plain regulations and flood insurances
were main items in this program.
He noted that the Flood Disaster Act of 1973 provided more coverage.
Showed the properties which had restrictions on new development such
as items requiring federal funding such as FHA mortgages and VA
mortgages. He noted that funds would not be provided for these without
flocd insurance. Showed the streams that were studied in detail and
which had an approximate study. He noted that the approximate studies
were taken from the USGS r'quardrangle maps, Soil conservation survey maps,
obtained information form the Zoning By -law, stream chanalization from
Cabot, Cabot and Forbes on the Hodges Brook, and survey data from
John Leverault, special flood areas map from HUD, information on Flood
History from Boston Public Library and information received from Town
Officials.
Mr. Gynon noted that 15 days from this date he would be required to send
a report with any comments received this evening to HUD, for their review.
They then have 30 days to review that and return the report to Anderson -
Nichols for corrections. Then, additional cop,i.es are prepared and provided
to the Town along with Maps and within 30 days from that it has to be
completed by Anderson - Nichols.
Planning Director Maurer noted a few years ago they had come up with the
Wetland Protection Zoning and that some areas of the zoning are more
restrictive,than the plan and other areas in the zoning would have to
be amended. Planning Directoe'Maurer questioned if more information could
be obtained on the approximated areas. Felt that it would be better to get
the exact location as opposed to having to make someone go through the
appeals period and so forth. Noted that some areas are in the vicinity of
streams but do not include the streams. He noted that the lowest habitable
floor has to be one foot above the flood area.
Minutes
August 27, 1975
Page 4
Mr. Leonard Flynn questioned if there were areas shown prone to flood
due to topography and soil. Mr. Gynon noted that it is more from ponds
and rivers rather than local drainage problems.
Chairman Caponigro questioned if it would be a map at scale of 1" = 200'
or if it would be the elevation that would be the determining factor. Mr.
Gynon noted that the elevation would be the determining factor. Chairman
Caponigro questioned how they could determine a 500 year storm when they
have only been there 200 years. Mr. Gynon noted it is a statistical factor.
Chairman Caponigro questioned if they had uncovered any records that
determine what.damages they received during the last storm. Mr. Gynon
noted that this was in the report. Selectmen Chairman Caponigro questioned
if it was possibl8 for a field review to go out and give a double check to
see how close or hoot accure this will be and questioned what happens to
existing construction like Cabot, Cabot and Forbes who have spent; hundreds
of thousands of dollars building roads. It was noted that this is not In
effect yet, and that the requirement is only after the final document is
adopted by the Town and that it is only in the preliminary stages now.
Mr. Archilla noted that after it is presented to the Town it will be
published two times in the local paper and there will be a 90 day
appeal period to repute any of the data in the report. He noted that the
insurance rate is determined by the location of the property in relation
to the flood areas and that information in this report can be continually
updated.
12)-Meeting adjourned at 9:30 P.M.
er
Date approved