Board of Light Commissioners
Minutes of Meeting 914 € 0V -2 P1 3: 1A
October 3, 1994
-TTS
PRESENT: Chairman Penney, Commissioners Ronald and Robinson.
Commissioners Pasquale and Royle were absent
Meeting called to order at 7:12 pm
MOTION: To approve minutes of September 12, 1994
Robinson/Ronald Vote 3 - 0
Fiberglass vs Cast Iron Replacement Light Fixtures
The Manager advised the Board that he felt it would be more economical to replace the
damaged poles uptown with the existing fiberglass poles instead of the cast iron poles.
Although the cast iron would be more durable, the pole weighs over 1400 pounds and
would be a lot more expensive than the fiberglass ($600 vs. $1400). If the poles are
damaged again this winter, then the Manager would consider replacing the poles with the
cast iron at that time. -
The Manager agreed to send a memo to the Town Manager advising him of the damage
caused to the poles by the snow plows. Additionally, the Board advised the Manager to
inform the Town Manager that if this type of damage occurs again this winter, the Town
Manager should inform the DPW Director that the DPW will be billed for replacement
poles.
Developer's Connection Charge:
The Manager advised the Board that the cost per house lot for new underground
subdivision, was approximately $1,350.00 per lot and for existing overhead lots the cost
to tie in would be approximately $150.00.
The Manager also stated that most heavy industrial users provide their own transformers,
cable and labor so he didn't feel their should be a fee for industrial users.
Commissioner Ronald stated that he wanted to recoup the capital costs associated with
wiring a new subdivision so that the developers are paying the capital costs and that the
rate payers are not subsidizing these costs through the rates.
MOTION: All new residential underground subdivisions will be charged a fee of
$1,350.00 per house lot for each Planning Board approved phase of the
' planned subdivision. Additionally, new construction which will require an
overhead connection will be assessed a fee of $150.00 per house lot.
This fee structure will take effect November 1, 1994. All fees are to be
paid up front, prior to the Mansfield Electric Department beginning any
work on the subdivision.
Ronald/Robinson
Vote 3 -0
The Manager suggested that this new policy be posted at the Building Department as
soon as possible. Additionally, the Manager was requested to look at gray areas, such as
existing unfinished phases of subdivisions, new commercial sites, etc. and report his
recommendations to the Board by October 14, 1994.
Customer Satisfaction Survey
The Manager suggested that he mail out approximately 600 surveys to residential
customers, providing return self - addressed stamped envelopes. This will be done prior to
the next meeting.
Conservation Program
The Board requested that the Manager submit a complete program at the next meeting for
approval. The Board want this to be completed and ready to roll out the new program at
the next meeting.
The Manager advised the Board that overtime work was primarily due to the following:
1) trouble
2) volume of work
3) nature of work i
4) storm trouble
5) accidents
6) squirrels
7) transformer failure
In the long term, we have plenty of work, not overwhelming but enough to keep us busy.
In the short term, work sometimes bunches up.
Staggering shifts might affect overtime a little bit but the majority of overtime would
still exist.
Swing shift results in reduced visibility and productivity. A troublemen wouldn't save
i you any money, because he could only take the calls and then call a crew in to repair the
problem.
The Manager doesn't feel the work load warrants another crew at this time. There are
other less costly alternatives, such as adding an additional man or contracting out tree
trimming if the work volume gets overwhelming. The Manager feels once you hire a
crew your married to that crew and he doesn't feel he could cost justify a crew at this
time.
The Manager feels that the perception of excessive overtime by the Electric Department
was stirred up by the Mansfield New article. The Manager feels that the results of the
customer satisfaction survey will support his view that overtime is not an issue relative to
the Electric Department. The Manager feels that he is efficiently operating the Electric
Department in the most economical method.
It was agreed that the Board would re- evaluate this issue after the completion of the
customer satisfaction survey.
The Manager presented a proposal to basically leave things as they are, or if the Board
insisted that they would like a position created for Assistant Manager, he would
recommend that Kym be awarded this position.
The Chairman stated that he did indeed want an Assistant Manager's position created, but
did not feel that Kym McGough was qualified for the position. The Chairman wants
someone with both a business and an engineering background to fill this position. The
Manager advised the Board that he felt that the technical expertise required was minimal
and felt that the Acting Superintendent was performing the job functions extremely well.
A lengthy discussion followed regarding what each Board member would like to see
happen in regard to the Acting Superintendent's position.
The Manager was instructed.to reorganize the department and present the proposed
reorganization at the next scheduled meeting.
MOTION: To adjourn the meeting at 9:30 pm
Ronald/Robinson
a/ � -
Jerk's signature & date
klaniffil