HomeMy WebLinkAboutZBA_06161992ZONING BOARD OF APPEALS
June 16, 1992
U b -1 c
Fo REC`- I'.'EIl
92 JUL 13 All 9: 04
fl-it • r 7
J'' C
i,i�U, C ET 1 S
The Board of Appeals held its regular meeting in the Town Hall, Mansfield, MA, at
7 :40 P.M. Present at the hearing were the following members: George Wojtkiewicz,
Chairman; Mary-Lou Cotton, Clerk; Karl Clemmey; Eric Butler; Richard Secher,
Associate Member; Peter DeTrolio, Associate Member and Richard Lewis, Zoning
Board of Appeals Advisor.
Mr. Peter DeTrolio was appointed as a voting member for this hearing in place of
Leonard Flynn.
The hearing on the application of Richard and Suzanne Charbonnier for a variance
from Section 4, Schedule 4.2.1 of the Zoning By -Law, to construct a non - conforming
addition to an existing, non - conforming structure at 21 Newton Street with less than the
required frontage and rear yard setbacks in the R -3 Zone began at 7:40 P.M.
The application was labeled Exhibit "A "; newspaper advertisement as Exhibit "B "; a
Plan of Land dated May 5, 1992 prepared by Hutchins- Trowbridge Associates, Inc., of
Mansfield, MA, as Exhibit "C ". Mrs. Cotton read a letter from the Planning Board
into the record. With six members present they voted unanimously to send a positive
recommendation on the application for the variance for rear yard setback. However,
the Planning Board is of the opinion that no variance is needed for frontage because the
applicant has ninety (90') feet of frontage and only eighty (80') feet is required in the
R -3 Zone.
Attorney Edward Valenzola of Mansfield, MA, introduced himself as the attorney
representing Mr. Charbonnier.
Mr. Wojtkiewicz asked Mr. Valenzola to explain the hardship.
Mr. Valenzola explained that the requested addition will be located directly behind the
house. The home is a 90 year old, two -story colonial. The addition, which will be 17'
x 22', is to be a bedroom, bathroom and closet with a full basement. The addition is
to be built for Mr. Charbonnier's 76 year old mother -in -law who uses a walker. The
addition will also have a wheelchair access. The addition will have no kitchen, so it
cannot be used for an apartment or in -law apartment in the future. The backyard has a
rear buffer of hedges.
Mr. Wojtkiewicz asked if any thought was given to placing the 17' x 22 addition
horizontally, instead of vertically, to be less intrusion for the rear yard.
Minutes of June 16, 1992
Page 2 of 4
Mr. Valenzola explained that in the architect's opinion it would be best suited and less
costly to be placed vertically and also did not want the addition to be too close to the
garage.
The hearing closed at 7 :50 P.M.
The hearing on the application of Dana Colby to obtain a variance from Section 4,
Schedule 4.2.1 of the Zoning By -Law, for an existing non - conforming structure at 14
Cavan Crossing with less than the required minimum sideyard setback n the R -1 Zone
began at 7:50 P.M.
The application was labeled Exhibit "A "; newspaper advertisement as Exhibit "B "; a
Plan of Land dated May 5, 1992 prepared by Hutchins - Trowbridge Associates, Inc., of
Mansfield, MA, as Exhibit "C ". Mrs. Cotton read a letter from the Planning Board
into the record. With six members present they voted unanimously to send a negative
recommendation on the application for the variance because it is of the Planning
Board's opinion that the applicant has created his own hardship. The Planning Board
suggested that the applicant work with his neighbor to straighten out the lot line by
submitting a Form A plan.
Mr. Michael Trowbridge of Hutchins - Trowbridge Associates, Inc. introduced himself.
Attorney Edward Valenzola introduced himself as the attorney representing the
applicant, Dana Colby.
Mr. Wojtkiewicz asked them to explain the hardship.
Mr. Trowbridge explained that there were two different sets of plans. The normal
procedure is for Drown Environmental to draw up the septic plans and the house
location. Hutchins- Trowbridge then stakes out the foundation. When Mr. Trowbridge
received the plans he realized that the house location was too close to Kerry Drive. He
informed Drown that the plan would have to be changed because it did not conform to
the town setback of 40 feet for a corner lot. When that plan was revised Mr. Colby
never received a revised copy. During the signing of the Purchase and Sale
Agreement, the prospective buyer requested the builder, Mr. Colby, to enlarge the
house by 6' and slide it toward the property line. The original plan indicated there was
44 feet. Mr. Colby believed he was still well within the requirements and made the
changes. The rear corner of the structure does conform. The front comer is a foot too
close to the setback, it is 24 feet. The furthest encroachment is the chimney which is
21.8 feet.
Mr. Colby has tried to approach the neighbor, Mr. Faherty, but could not reach an
equitable solution.
Mr. Wojtkiewicz asked why Mr. Colby never received a revised plan.
Minutes of June 16, 1992
Page 3 of 4
Mr. Trowbridge explained that when the new plans were completed they were
submitted directly to the Board of Health. Drown Environmental assumed Mr. Colby
would get the new plans directly from the Board of Health. The problem was not
discovered until Hutchins - Trowbridge drew the new plans on May 5, 1992.
Mr. Faherty, the abutter directly next to the lot in question, was approached by Mr.
Colby to relocate his property line. His concern was that if and when he builds a
garage in the future, he doesn't want to have a problem with his property line.
Attorney Valenzola explained that Mr. Colby tried to work the problem out with the
abutter, but they could not reach an agreement. There was a reasonable effort made to
solve this problem.
Mr. Richard Franklin introduced himself as the proposed buyer of this property. He
was scheduled to pass papers last Friday, but did not find out about this problem until
the bank surveyed the property for his mortgage. He has three small children; has sold
his other home; and if the variance is not granted he has to find another home very
soon. He feels he has a major hardship. He requested that if this variance is granted,
he would like it to be expedited. He has a commitment from the bank that runs out at
the end of July.
The hearing closed at 8:20 P.M.
A motion was made by Mrs. Cotton and seconded by Mr. Clemmey to grant a variance
to Mr. and Mrs. Charbonnier. Unanimously granted. It is felt that it is a clear -cut
case. There is no kitchen, so there could be no apartment. The restriction is that it
will be a one -story building.
A motion was made by Mr. Clemmey and seconded by Mr. Butler to grant a variance
to Dana Colby. Unanimously granted. They proved a hardship and it is not
detrimental to the neighborhood.
The Minutes of June 2, 1992 have revisions.
The Board granted a variance to Sheila Ristaino at 971 West Street. This variance was
for a house to be built that is 24' x 65' feet long. The Board approved this variance.
She now wants to sell the land to a builder from Attleboro. The builder, Glen Jaros,
has a client who wants to build a smaller house in the exact location. However, when
Mr. Jaros went to the Building Inspector to get a permit to build the house, Mr. Cook
said that the foundation plan that you want to build is not 24' x 65 feet, it is smaller.
Since you are changing what was approved by the Zoning Board, I will not issue you a
building permit. The Zoning Board is requested to write a letter to Bert Cook stating it
would be the intent of the Board to allow a lesser building than the one that was
originally granted a variance. They originally had 30,000 feet for lot area, when
zoning changed to 45,000 feet, they had to apply for a variance.
Minutes of June 16, 1992
Page 4 of 4
The variance was for minimun lot width. The owner had planned to build a house on
the lot but have since decided to sell the lot instead.
Fred Upham, Registered Land Surveyor, introduced himself. The new plans were for
a house only 36 feet in width, a smaller home than the original plan showed.
Mr. Wojtkiewicz suggested that the Board direct the Clerk to send Mr. Cook a letter
saying that if the house fits within those plans that the Board has no problem. Richard
Lewis should draft a letter and have the Board members sign it.
Motion to send Mr. Cook a letter was made by Mr. Butler and seconded by Mrs.
Cotton. The letter will be left at the police station with the decisions to be signed.
Mrs. Cotton read a letter into the record from First Christian Church to waive the
application fee. Mr. Clemmey made a motion to grant the waiver of fee. It was not
seconded. It was felt that since they are tax exempt from everything, and the Board
has never waived a fee for any other organization, they should have to pay the fee.
A motion was made by Mr. DeTrolio that the Church pays the fee. The motion was
seconded by Mr. Secher. The vote was 4 -1 in favor. Mr. Clemmey voted against it.
Mr. Lewis should draft a letter to First Christian Church denying them the waived fee.
Mr. Wojtkiewicz requested having a meeting with Mary-Lou Cotton, Richard Lewis
and Karen Lawlor within the next few weeks to start working on several things; a
redesign of the application and also a redesign of the decisions. The applications have
not been updated since 1953.
Mr. Butler mentioned non - conforming structure. It was felt that Bert Cook should be
invited to one of the Board's meetings to discuss issuance of permits for non-
conforming structures. Mr. Wojtkiewicz asked Richard Lewis to work with Shaun
Burke regarding drafting an amendment to the By -Law.
Mr. Wojtkiewicz requested Bert Cook be put on one of the agenda for August to
discuss the matter of non - conforming structures and updating of the By -Laws.
The meeting adjourned at 9:15 P.M.
Respectfully submitted,
Mary -Lou Cotton
Clerk