HomeMy WebLinkAboutmin of planning brd 8/25/1999Planning Board Minutes
August 25 1999
r FICE
S9 SEP -9 All IQ: 25
r I"WILLD
Present: H. Thomas French, Jr., Chairman; Marydee Flynn, Clerkt vla i-&61l SETTS
Bernard J. Dolan; Scott A. Frank; Thomas P. McShane; and Kenneth H. Torman.
Also present was Shaun P. Burke, Director of Planning and Development.
Meeting called to order at 7:30 p.m.
Great Waves Site Plan Review
Mr. French presented an overview of the site plan process and how the meeting
would be conducted.
Richard Samuels, Managing Partner, stated he has been in the water park industry
for nineteen years and has had a great amount of input into the design of the Great
Waves site. He said the site was selected by him after flying over the Route 495
area and looking for a location in this area. The Mansfield site was selected
because of its excellent demographic location and employee pool of young
people, as well as the topography of the site, which offers level ground for the
pools.
William Moore, Engineer with H. W. Moore Associates, presented an overview
map of the site showing the water line coming into the facility from Route 140
marked in blue and sewer lines in orange. He then presented a 40 -scale map with
the wetlands identified in dark green, noting the site is a worked -out gravel pit.
He stated roofs would be discharging into dry wells to recharge the groundwater.
Stormwater detention areas were indicated in blue. Light green showed areas that
will be left in their natural state, and white areas were the actual project. He
noted the project would result in a 10% reduction of outflow in a 10 -year storm
event and a 19% reduction of outflow for a 100 -year storm event.
David O'Connor, Landscape Architect from the Cecil Group in Boston, noted
their plan is the best use of previously disturbed land; the Park will be integrated
into the natural landscaping; it presents a minimal impact on the area and
abutters. He stated they are preserving the wetlands and tree coverage as much as
possible and the Park is laid out so that you can't see the whole area at any one
time within the site. Tall structures have been kept away from conservation land
and the site is enclosed by a wooden fence. The attractions do not extend above
the tree line and they have selected an entirely native plant material palette for
low maintenance, reducing the need for irrigation. All trees will be extremely
drought tolerant and they will be using wetland species around the edge of all
wetlands. They have also provided for Fire Department access and, at the same
Meeting of August 25, 1999
time, reduced the amount of pavement. The buildings are wood frame with wood
siding. There will be a 30 sq.ft. sign for identification. He noted people would
come to the Park as a destination and they are not trying to attract impulse visitors
with signs above the tree line.
Mr. O'Connor also presented computer - generated views of the Park at the request
of Mr. Burke. This presentation showed the view from the northwest comer of
the site, from the Route 495 overpass, from Route 140 across the existing parking
lot, and from directly across Route 495 looking into the Park. He noted that no
structures will exceed 60 feet in height and all views will be filtered through plant
materials.
Jeff Durke, Project Manager from Vanasse Associates, delivered the traffieand
parking segment of the presentation. Vanasse Associates was retained to assist
the project development in traffic operations, pedestrian flow, and traffic
management for the site. Access to the site is from a driveway on Route 140. It
was designed per State standards for access onto a State highway. The driveway
has a large corner radii of 30 feet, a 12 foot entrance lane, and two exit lanes of
12 feet each. Concrete sidewalks are provided for pedestrian flow along Route
140. The site driveway is under stop sign control or police officer control at all
times. The proponent has committed to police officer control during the day, with
stop sign control to be utilized early morning and after closing. There is a separate
10 foot dedicated emergency vehicle access to Great Waves and the Tweeter
Center. Mr. Durke addressed three areas:
1. On -site vehicular and pedestrian flow: A carefully managed traffic
and parking operations plan provides that when guests enter the site,
they are met all along the way by on -site staff and directed to the
parking area. Within the parking area, on -site parking staff will direct
vehicular traffic into parking spaces and pedestrian movement will be
directed to pedestrian aisles, which are separated from vehicle lanes.
2. Parking: Peak summer attendance was presented as 7,000 patrons,
with an estimated 780 of these arriving in 26 busses, resulting in 6,220
guests who would arrive in private passenger vehicles. This would
result in a net requirement of 1,555 available parking spaces for these
vehicles. He stated, however, they don't have the need to provide this
number of spaces because there is a tum -over rate of 1.4 times per
parking space each day, resulting in the need for only 1,111 spaces. In
addition, they are required to provide one parking space for each of the
employees on their largest shift, which would bring the number of
required spaces to 1,211. They have provided 1,323 spaces for private
passenger vehicles and 26 spaces for busses, for a total of 1,349
spaces.
2 Meeting of August 25, 1999
3. Traffic management: They need to be able to manage traffic on Route
140 when there's an event at Tweeter Center. They believe there will
be no conflict the majority of time. Mr. Durke stated Great Waves
will be closed during evening sell -out events at Tweeter Center and a
plan is being developed to deal with any conflicts during other sell -out
events. The driveway for Great Waves, which Tweeter Center uses
during sell -out events, will still be used by Tweeter Center when
needed for sell -out events, with a separate emergency access being
maintained at all times. In addition to detail officers hired for Tweeter
Center, there will be an additional officer to handle Great Waves
traffic.
Staff Comments
Comments were read from the following:
Jack Beliveau, Light Department Director, dated July 16, 1999
Shaun P. Burke, Director of Planning and Development, dated July 17,
1999 with addendum dated August 17, 1999
Robert P. Bellavance, Deputy Fire Chief, dated July 28, 1999
Steve Bishop, Acting Water Operations Manager, dated August 4,
1999
Scott Leite, Health Agent, dated August 16, 1999
Consultant Comments
Comments were read from the following:
Southeastern Regional Planning and Economic Development District
(SRPEDD) dated August 13, 1999, relative to traffic issues
Weston & Sampson Engineers, Inc., dated August 18, 1999, relative to
conformance to the Zoning By -Law
Written Comment from the Public
David Lee of 18 King Arthur Way — March 29, 1999
John B. Southard, Professor of Geology at MIT, resident of15 Old Elm
Street —July 26, 1999
Phoenix Environmental Group of North Pembroke, MA on behalf of
Karl Clemmey —July 28, 1999
Phoenix Environmental Group of North Pembroke, MA on behalf of
Karl Clemmey — August 12, 1999
Following a brief recess, Mrs. Flynn read into the record a letter from Vanasse &
Associates, Inc., dated August 18, 1999, in response to staff comments. Jeff
Durke of Vanasse & Associatse followed up with additional comments. Also
3 Meeting of August 25, 1999
read into the record was a letter from Attorney Eugene F. Boyle dated August 15,
1999, regarding parking issues. Mr. French advised them that the Building
Inspector would review their parking calculations with respect to conformance to
requirements and determine if the number of spaces provided is correct. Mr.
Burke noted that is an area which comes under the purview of the Planning Board
relative to site plan recommendation. Discussion ensued regarding the
comparative need for parking spaces in an event with a defined time versus a
situation where there is a constant turnover of parking spaces when people are
arriving and leaving throughout the day.
Mrs. Flynn asked why the figure of 7,000 was used for peak attendance, when
previously 10,500 was given. Mr. Durke noted the 7,000 figure is for Phase I of
the project and 10,5000 was for full buildout. '"
Dr. Torman noted the figures used for peak attendance are those for Portsmouth
and asked what the capacity of the park is. Mr. Samuels said the largest
attendance to date has been 10,800 — of which 2,000 were people in attendance
for a corporate barbeque. Mr. Durke noted that Water Country is larger than
Phase I of Great Waves. Mr. Samuels noted the average attendance is 4,000,
pointing out that last Sunday when it was raining there were only 280 people in
attendance which greatly affects the calculation of "average" attendance figures.
Mr. McShane noted the difference in the number of parking spaces provided and
the number calculated by Weston & Sampson to be required. Following
discussion and explanation of various methods of calculation, Mr. McShane
asked where on the site additional parking would go if it is determined that more
is required. Mr. Samuels was unable to provide a definitive answer, to which Mr.
Dolan suggested that perhaps they would have to go into their Phase II property to
provide the required parking spaces.
Ted Morini, senior hydrogeologist from D. L. Maher, responded to the comments
of John Southard regarding pump tests. Mr. Morini noted he found the
comments to be "scholarly, academic, disingenuous self - serving and inaccurate."
In his letter, Professor Southard suggested that the 48 hour pump test done is not
sufficient to derive information needed to determine safe yield and adverse
impact on nearby wetlands that might occur. Mr. Morini cited what he believed
to be various deficiencies in the procedure used by Professor Southard in drawing
his conclusions. Mr. Morini also pointed to differing regulations between states
that are determined by the amount of water to be pumped. Discussion followed,
with Professor Southard stating that pumping time varies from case to case and
that all he had done was analyze the numbers presented. He noted he did not
address regulations, but only what was happening in a particular well, noting that
48 hour pumping is not a good indication of how much drawdown there would be
( in a particular well and adjacent wetlands. Professor Southard stated he is open-
4 Meeting of August 25, 1999
minded about the results, but believes that more than 48 hours is needed to obtain
the necessary information.
Mr. French acknowledged the presence at the meeting of the Mansfield Board of
Selectmen, Senator Joanne Sprague, and Representative Barbara Hyland.
The following residents or their representatives offered questions and comments:
David Hammond, 48 Branch Street
George Dentino, Gladiola Terrace
Forrest Emory on behalf of Karl Clemmey of South Main Street
Lou Andrews, 255 Fruit Street and Vice President of Natural Resources
Trust (NRT)
Joanne Ferrari, 32 Erin Drive
Nancy Wall, 31 West Street
Edward Carl, 199 Branch Street
Jane Sheehan, 600 South Main Street
Peter Presentato, 650 South Main Street
Christine Flaas, Rumford Avenue
John Russo, 16 Ware Street
Issues raised were:
"amusement" park versus recreational facility
adequacy of parking
noise and traffic
anticipated peak attendance
capping the number of tickets sold
patrons parking on nearby streets and lots in area and walking into
facility if the lot is full
adequacy of water
impact of pumping from on -site wells on groundwater levels in the
area
hours of operation
Mr. Samuels said they would operate from 9:30 a.m. to 6:30 p.m. The only time
they would operate during the evening hours would be if they hold a special
event, such as a "chemical -free night' in conjunction with graduation. For such
an event they would operate attractions throughout the night.
With regard to limiting decibel levels, Mr. Burke explained that the Town does
not have a noise by -law; however, decibel level can be addressed through the
licensing procedure by the Board of Selectmen.
Meeting of August 25, 1999
At 11:00 p.m., with the Planning Board not yet having had the opportunity to ask -
questions, Mr. French suggested that consideration be given to continuing the site
plan review to another meeting.
Motion: To continue the site plan review to next Wednesday, September I", at
7:30 p.m. in the second floor meeting room.
(Dolan -Cook) 7 -0 PASSES
The applicant was asked to grant an extension of the time to make the
recommendation to the Building Inspector. They agreed and Mr. Boyle said he
would get it to the Planning Department in writing the next morning.
Mr. McShane asked if there was any comment from Lance Lawson. Mr. Burke
replied that there were no separate comments, as he had already submitted them
as part of the Final Environmental Impact Report (FEIR) process. Ptlm. was not
present at the staff review. Board members will be provided with a copy of his
FEIR comments.
Motion: To adjourn at 11:30 p.m.
(Torman- Frank) 7 -0 PASSES
Sign�iurc of Clerk
//? d/
Date of Approval
Next Meeting: September 1, 1999
6 Meeting of August 25, 1999