HomeMy WebLinkAboutmin of planning brd 10/29/1997PLANNING BOARD MINUTES - „ t = fir-
October 29, 1997
°;i II QQ
J 1 'N."11-6 ,
Present: H. Thomas French, Jr., Chairman; John D. Sullivan, Jr., Clerk; Bernie J. Dolq
Marydee Flynn; Scott Frank; and Kenneth H. Torman. Also present washuti P :Bt}J TS
Director of Planning and Development.
Meeting Called to Order at 7:30 p.m.
Mr. Dolan served as Acting Chairman until the arrival of Mr. French.
Cot respvndetce
1. Memo from Dan Clifford recommending that surety for Donald Estates be set at
$40,000., with a copy showing $40,000. check received by the Treasurer's Office
as surety.
Motion: To set surety for Donald Estates at $40,000.
(Sullivan - Tonnan) 5 -0 with Mr. French not present. PASSES
2. Form J releases for Donald Estates
Motion: To sign the Form J releasing Lots 2 -9 of Donald Estates.
(Tonnan- Sullivan) 5 -0 with Mr. French not present. PASSES
Letter to SRPEDD re: Route 1401495 intersection study
Jim Hadfield and Roland Hebert of SRPEDD were present and
explained how this particular intersection was selected for study.
The issue of other intersections being more of a public safety
concern was addressed, with Mr. Hebert explaining that this
intersection was chosen due to traffic congestion, and that public
safety was not the criteria used in the selection of intersections for
this particular study. He said the scope was to study the
intersection only and does not include the option of putting a new
road through the Great Woods. Mr. Hadfield and Mr. Hebert also
discussed with the Board the history of this intersection, going back
a number of years to the construction of Route 495 and the
relocation of Route 140. Mrs. Flynn stated that SRPEDD should
have taken the time to provide the Town with the scope of their
study prior to proceeding with it. Mr. Burke said that there is no
doubt that further development is going to take place in that area
which will necessitate road improvements. He stated his concern
that if nothing is done, we will end up with a road going right
through the Great Woods and that we should encourage the Board
of Selectmen to support the study for this reason. Mr. French
stated that he sees the study as being beneficial in providing a
means to analyze the outcome of the study Campanelli will be doing
and that Mansfield is better off being a player than a bystander.
Motion: To support the study, provided that in no way does the
Minutes of October 29. 1997
study include alternatives, such as a new road through the
Great Woods, and noting that the Planning Board is
disappointed that they were not provided with a copy of the
Request for Proposals prior to SRPEDD's selection of a
consultant to perform the study.
(Sullivan- Dolan) 6 -0 PASSES
John Sullivan disclosed that his firm is doing engineering work for the
applicant and that he would be excusing himself from the Planning Board
review and leaving the room during the discussion.
James Almonte of Waterman Design Associates presented the site plan
prepared for Mansfield One Limited Partnership at 89 Forbes Boulevard.
He stated that there is an existing 40,000 square foot office building on the
site with 122 existing parking spaces. They are proposing to add an
additional 78 parking spaces to the site to meet market requirements for an
office building of this size. Mr. Almonte confirmed that the site conforms
to zoning. They propose to add additional parking spaces in the rear
portion of the lot, which is currently open lawn area, as well as to re -align
some of the existing parking on the side and front portion of the lot and
( relocate some of the handicap spaces to the front of the building, closer to
the entrance. He pointed out that a good portion of the landscaping on the
site will be maintained and that quite a bit of new landscaping will be
provided. Revised drainage was also presented for review and discussion.
Mr. Dolan, serving as Acting Clerk, read comments received from
department heads and Mr. Almonte responded to them.
Motion: To send a positive recommendation to the Building
Inspector on the site plan, pending review by the Town
Engineer of the revised drainage calculations.
(Flynn- Torman) 5 -0 with Mr. Sullivan not present.
PASSES
Mr. Sullivan read correspondence received from Town Counsel which provided his
opinion that a two - family dwelling could not be included as part of a Residential
Compound-
2 Minutes of October 29. 1997
Ralph Maloon of RIM Engineering, representing the applicants, asked that the hearing be
continued for six weeks to allow them time to determine how they wish to proceed.
Motion: To continue the hearing to December 17, 1997 at 8:00 p.m. with the
applicants being required to re- notify all abutters of the continuation.
(Sullivan - Dolan) 6 -0 PASSES
Mr. Frank asked that any additional legal matters which arise regarding the proposal be
cleared up prior to the continued public hearing.
Coiresp4ndenee (coiitrntted) =
4. Memo from Dan Clifford recommending partial release of surety for
work completed on Shawmut Avenue Extension.
Motion: To release $14,023.20, leaving a balance of $3,224.80
to cover the 10% contingency, as- builts and legal
description.
(Dolan - Sullivan) 6 -0 PASSES
5. Memo from Dan Clifford recommending partial release of surety for
work completed in Cedar Ridge Estates.
Motion: To release $19,775.00, leaving a balance of $7,225.00
to cover the 10% contingency.
(Flynn - Sullivan) 6 -0 PASSES
6. Memo from Dan Clifford recommending partial release of surety for
work completed on Cottage Street Extension.
Motion: To release $1,000.00, leaving a balance of $1,710.00 to
cover the 10% contingency.
(Sullivan- Flynn) 6 -0 PASSES
7. Letter from Jack Riccio re: extension of time to finish Mill Farm Drive
Mr. Burke advised the Board that he has spoken to Dan Clifford
about the request and that at this point there are not a sufficient
number of houses built to warrant finishing up the road.
Motion: To grant an extension to August 15, 1998 for the
completion of Mill Farm Drive.
(Torman- Sullivan) 6 -0 PASSES
8. Receipt from the Treasurer's Office showing Stan Feck's $2,500.
contribution to the Sidewalk Fund in lieu of installing sidewalks
for Shawmut Avenue Extension.
Invitation to a reception for School Superintendent John A. Moretti
on Monday, November 10th at 7:00 p.m. at the Robinson School
Cafetorium
10. Copy of letter from James Hadfield, Director of Highway Planning at
SRPEDD, to the Board of Selectmen re: Route 140 /I -495
interchange study.
Mr. Sullivan stated that he would like to see SRPEDD and those
Minutes of October 29. 1997
reviewing the ENF for Campanelli to study the traffic impact on the
area as far as the North Main Street /Route 106 and Routes
140/106 intersections.
11. ZBA Decisions:
The Pires Family Trust for the expansion of pre- existing, non-
conforming apartments at Copeland Drive. Denied; Planning Board
recommendation was 6 -0 negative.
ETC Trust for the expansion of pre- existing, non - conforming apart-
ments on Ware Street. Denied; Planning Board recommendation
was 7 -0 negative.
12. Public Hearing Notice - Attleboro ZBA
13. Public Hearing Notice - Norton Planning Board
14. Public Hearing Notice - Attleboro ZBA
15. Memo from SRPEDD re: RFP for transportation projects funding
opportunities.
16. Letter from Comprehensive Environmental Incorporation re: Brown-
field Redevelopment and the Massachusetts Contingency Plan
17. SRPEDD Regional Review
ArAUnd the: t stbte
Mr. Dolan brought up that Franklin is installing new concrete sidewalks
and that he would really like to see Mansfield's Subdivision Regulations
revised to require concrete sidewalks also. Board members asked that a
workshop be scheduled following the conclusion of the Special Town
Meeting to address this issue and other revisions to the Subdivision
Regulations. Mr. Burke agreed to put together a list of possible items for
consideration for the Planning Board's December 3rd meeting.
The question was raised as to whether the Airport Commission has
received the information requested from Omnipoint Communications
regarding the proposed monopole at 30 Reservoir Street.
Motion: To notify Omnipoint Communications that their
continued public hearing scheduled for November 12th
will not proceed if they have not provided the required
information by the preceding Friday for Planning Board
review.
(Sullivan - Torman) 6 -0 PASSES
Mr. Burke said that he would contact Jeff Siena, Chairman of the Airport
Commission, regarding their meeting with Omnipoint and would also
f contact Omnipoint to see what their intentions are.
Minutes of October 29, 1997
Motion: To adjourn at 9:55 p.m.
(Sullivan - Dolan) 6 -0 PASSES
S ature of 4clr�
i//�F7
Date of Approval
Minutes of October 29, 1997