HomeMy WebLinkAboutPlanning brd min_1021996PLANNING BOARD MINUT . S
October 2, 1996 1 E L 9
PRESENT: Planners Bonda, Dolan, McShane and Penney 93 OCT 3 ► ('i, 2: $3
Shaun P. Burke, Director of Planning and Development
iiASSAC ;U_LTTS
Motion: To appoint Mrs. Bonda Acting Chairman until the arrival of Mr. French and
Mr. McShane Acting Clerk in the absence of Mr. Sullivan.
(Dolan- Penney) All in favor. PASSES
1. Meeting called to order at 7:55 P.M.
2. Public Comment
1. Residents of Massapoag Estates (Charles and Bernadette Geiss of 50
Elyse Road and Jerry Gong of 21 Donald Allen Drive) were present to
discuss the situation of glass in the loam used on their property and in the
drainage area. Mrs. Geiss spoke for the group, stating they would like the
loam removed and new loam brought in. She said they were concerned
about what's under the topsoil and what else will come up. Mr. Burke
reported that a certified letter was sent to the developer and, although
no response with a written proposal has been received, Mr. Bonvie was
in and said that his solution would be to remove the remaining glass by
hand and cover the area with three inches of loam and re -seed. It was
explained that the town has no control over individual lots, but it does
over the easement and that when it is time to make a recommendation
for street acceptance, the drainage area would have to be considered.
Board members were in agreement that Mr. Bonvie's verbal proposal
was not acceptable and that they would not support street acceptance
unless the drainage area issue was resolved in a satisfactory manner.
Board members expressed concern that there may not be enough
surety left to cover the cost of remedial action and were assured that
there was approximately $150,000 remaining, which should be more
than sufficient. The Board also questioned whether or not Mr. Bonvie
had made any offers regarding the private lots and felt that he should
be encouraged to do so.
Motion: To direct the developer to remove and replace the loam in the
drainage area and to consider taking care of the private lots at the same
time. (Dolan- McShane) All in favor (4 -0) PASSES
3. Correspondence
1. Letter from Hutchinsfrrowbridge Associates regarding Keli Green
Subdivision Profile Revisions - Mr. Burke explained that the issue
came about when they were grubbing in the road and that the revisions
were the result of changes in the Title 5 requirements. The proposed
road profile would be about 1.5 feet lower and the excess material to be
removed would stay on site to be used as fill in the cul -de -sac area and
lots where various amounts of fill will be needed. Other changes
involved the elimination of a large poured -in -place concrete wall with
a stone and earthen wing wall and stabilization of the slope. Mr. Penney
questioned the wisdom of going with wood rather than galvanized
guardrails from the standpoint of longevity and maintenance. Paul
Folkman responded that it was a proposal based on aesthetics and
their desire to retain a rustic look. Mr. Penney asked if the Subdivision
Rules and Regulations cover guardrails and was told that they do not
presently do so. He suggested that they might consider brown
galvanized. Mr. McShane stated that he would prefer wood to metal. He
also questioned whether there would be changes in the drainage calcula-
tions and was told by Mr. Folkman that they would be minuscule.
Motion: To approve the proposed road grade revisions.
(Dolan- Penney) 3 -0 -1 (McShane abstaining) PASSES
Mr. Folkman suggested that they postpone the guardrail issue but the
revision to use riprap around the retaining wall would be helpful.
Motion: To accept the proposed revision to use riprap to replace
the cast -in -place concrete wall with stone and remove the old retaining
wall. (Dolan- Penney) 3 -0 -1 (McShane abstaining) PASSES
2. George Fram Estates - Revisions to Definitive Plan: Mr. Burke pointed
out the changes that were made. Mr. Penney checked to see that all the
concerns he had were addressed and was satisfied that they were. He
also asked when the area of land being donated to the town would be
deeded over and was told that it would take place after the release from
covenant.
Motion: To sign the Fram Estate plan as revised. (Dolan- McShane)
All in favor (4 -0) PASSES
Mr. French arrived at 8:30 p.m. and Mrs. Bonda stepped down as Acting Chairman.
3. Minutes of September 18, 1996 - Mr. Penney questioned if the amounts
of surety requested to be released should be put in the minutes on page 2,
item 22. He also noted that action on George Fram Estates was tabled
to October 2, 1996, not October 8th as written. Mr. Dolan noted that
his report of suggestions made in jest at the Master Plan Committee
meeting should not be part of the minutes.
Motion: To approve the minutes as amended.
(McShane - Dolan) 4 -0 -1, Penney abstaining. PASSES
7
4. Letter from Karl Clemmey requesting interpretation of Zoning By -Law
re: bulk storage - The Board agreed with Town Counsel that there is
nothing in Section 6.2 that states that bulk storage is an allowable use
in the B -3 zone. Mr. Burke explained that if Mr. Clemmey does not like
the decision of the Building Inspector /Zoning Enforcement Officer, there
is an appeals process in place.
Motion: To send a letter to Karl Clemmey advising him that the Board
reviewed his letter and agrees with Town Counsel and further advising
him of the appeal process and/or the process of having the By
amended at Town Meeting.
(Penney - Bonda) All in favor. PASSES
5. Letter Burke dv sed the Board that htas spoken t Dan Clifford,
Way
Subdivision Inspector, and that Mr. Clifford is in the process of doing a
preliminary accounting and expects to have a final total in two weeks.
6. Letter from Attorney Cerrone re: Tara Estates - Lot 16 - Mr. Burke ement
explained that the relocation
t from cul-de-sac t would ul de saoa The for
the water system by g
Water Department was asked to identify the mains and draw a line
between them and that the end result of relocating the easement would
be a Form A Plan. Mr. French asked if relocation of the easement would
result in the developer getting two lots out of it. Mr. Penney stated that
he would like to see the road go through.
7. ZBA Decisions ranted
419 South Main Street - Finding g
19 Noonan Street - Variance granted
40 Lantern Lane - Variance granted
Mr. Dolan questioned the ZBA's decisions and how they could state
that their decision does not nullify the intent of the Zoning By -Law.
Mr. Burke explained that they are using boilerplate language to
state the three statutory findings which must be made and that they
aren't explaining the reason for their decisions. He cited the old
St. Mary's variance to allow for the conversion of the ranted agaon,
apartments which was granted, appealed, remanded, g
appealed again and eventually overturned. He explained that while
most Zoning Boards use the boilerplate explanations, it makes a
decision easily overturned if the reasons for granting are not stated.
8. Copy of letter from Building Inspector to Superintendent of Schools re:
High School fuel storage tank - Mr. McShane stated that he is concerned
about the retraction by the Building Inspector of his previous decision
3
and requested an explanation. Mr. Burke explained that although he
would personally testify that the tank is in the Zone II based on visual
analysis, the location of the tank was outside the line on the Zone II map.
The Building Inspector's retraction was based on the DEP's letter stating
that the location is not within Zone II and Town Counsel's opinion
that it is outside Zone II as shown on the map. Mr. McShane stated
that it is his belief that town officials have a higher responsibility to
show due diligence in upholding the law and that the School Depart-
ment should be concerned with putting their fuel storage tank in the
middle of an aquifer. Mr. Penney questioned the reasoning for going
with an underground tank and the belief of the Board was that the
decision was based on cost and the fear of vandalism. Mr. Penney
responded that a convault system would be indestructible and that the
cost of an underground tank will be even greater if they install it below
groundwater.
Motion: To send a letter to Dr. Nicoletti stating that the Planning
Board is disappointed with their decision to put an underground
fuel storage tank at the High School and that, as public officials,
the School Department has a higher level of responsibility than a
private developer and that they should be seeking other alternatives
instead of going with an ambiguous line on a map to locate the tank.
(McShane - Bonda)
Amendment to Motion: To also send a copy of the letter to each
School Committee member and to the Water Commissioners.
( Bonda- Dolan) All in favor. PASSES
9. Copy of memo from Shaun Burke re: Master Plan Update
10. Copy of memo from Shaun Burke re: Master Plan Committee
request for support services
11. Public Hearing Notices -Easton ZBA
12. Public Hearing Notice - Attleboro ZBA
13. Public Hearing Notice - Attleboro Planning Board
14. Public Hearing Notice - Attleboro ZBA
15. Public Hearing Notice - North Attleboro ZBA
16. Special Permit Decision Notice - Norton Planning Board
17. Public Hearing Notice - Attleboro Municipal Council
18. Journal of the American Planning Association
19. Municipal Report
20. Zoning Board of Appeals Applications
25 Rvlta Vista e y nu - request for a finding to allow for an alteration
(deck addition) of a pre- existing, non - conforming single family structure
in the R -3 Zone. Mr. Burke suggested the Board give a positive
recommendation.
Motion: To send the ZBA a positive recommendation
(Penney- McShane) All in favor. PASSES
4
44 Shields Street - request for a finding to allow for the alteration of a
pre- existing, non - conforming single family structure in the R -2 Zone.
Mr. Burke suggested that a positive recommendation could be made for
the addition, but that the deck encroaches on the setback requirement.
Motion: To send the ZBA a negative recommendation because the
deck does not conform to the zoning requirements.
(Dolan - Bonda) All in favor. PASSES
447 West Street - request for a variance from Section 1.5.17a to allow for
a lot with less than the required lot width in the R -2 Zone. Mr. Burke
suggested the Board send a negative recommendation since the appli-
cant created the hardship himself when he subdivided the land.
Motion: To send the ZBA a negative recommendation with a copy
of the plan, pointing out that the plan was approved based on the
existing dwelling being moved and that Lot 1 was identified as
non - buildable.
(McShane- Penney) All in favor. PASSES
21. Memo from Dan Clifford re: recommendation that surety be set at
$95,000 for Mill Farm Drive.
Motion: To approve the amount of surety at $95,000 for Mill Farm Dr.
(Bonda - Dolan) All in favor. PASSES
22. Memo from Dan Clifford re: recommendation for partial release of
surety in the amount of $37,351 for Fawn Lane, leaving a balance of
$6,745.
Motion: To approve recommended partial release of surety as requested.
(Penney- McShane) All in favor. PASSES
23. Memo from Dan Clifford re: recommendation for partial release of
surety in the amount of $54,000 for Plowshare Court, leaving a
balance of $8,800.
Motion: To approve recommended partial release of surety as requested.
(Bonda - Penney) All in favor. PASSES
24. Survey from DEP re: Ten Mile River Watershed - Mr. Burke to
complete and provide Board members with copy.
25. Cobbler's Corner - Form J and request that surety be set in the amount
of $33,000.
Motion: To approve the Form J and accept the recommendation for
surety.
(Dolan- Penney) All in favor. PASSES
26. Taunton River Watershed Alliance: request for letter of support
Motion: To have Mr. Burke send a favorable response to their
request for support.
(McShane- Penney) All in favor. PASSES
27. Letter from Folkman & Zola Builders re: status update of Sturbridge
Estates fall roadway construction
28. Letter from SRPEDD re: transportation enhancement activity projects
i
4. Form A (ANR) Plans . on Ware Street filed y
1. A plan for 2 lots contaning 120,182 sq.
Stephen Benoit. Mr. Burke recommended endorsement.
Motion: To endorse the Form A. (Dolan - Bonda) All in favor. PASSES
5. Around the Table date at the next meeting
Mr. Penney asked that Mr. Sullivan v with the Selectmen at which Mr. Sullivan
on the Wastewater Workshop
by Carol? Dresser er & McKee ecommented
and that it didn't tell us anything we don't
re read the report
by Camp, ested that it was time to begin putting together
already know. He also sugg ations for
a list of items for amendment roFrench Subdivision sponded t at an ate mpt had been e it
the Annual Town Meeting
made over the summer months hat pe hapsswe could set aside an evening for
impossible. He suggested
this purpose. Mr. Penney suggested that sections be delegated to each
member for review. Mr. French said that we could take two or three
issues and concentrate on them at the next meeting. October Mr. Burke stated that
when it might be possible to
the 30th will be an extra Wednesday
do this. hf r MreBurke requested to v and schedulingioritized items to the
next meeting
Mr. Dolan asked if we could do a salt policy as part of the Subdivision Rules
and Regulations and was advised that the Selectmen are doing a policy on
that issue. law
Mr. Penney suggested that we send a copy of our adult entertainment by
to abutting towns, explaining our thought process in the setback requirement
from the town line of abutting towns, and asking them to consider such a
setback in their requirements.
Mr. Burke was nd vi will get one. GIS maps are available which also have land that new
use on them
Mr. Penney advised the Board that his firm, Penney Engineering, is involved
with a 21E property assessment for Folkman & Zola. He does not see any
conflict of interest at this point; however, he wanted to disclose the fact to
the Board.
growth management by -law to the Master Plan
he B ard. advised the Board that she had received a memorandum from the
Town Manager referring the g
r
eoce end by the r Board of Selectmen from result of a letter
om Paul Folkman
Mr. McShane stated that he has a conflict with the October 16, 1996
scheduled meeting and will not be able to attend.
6. Adjournment
Motion: To adjourn at 10:20 p.m. (Dolan- Penney) All in favor. PASSES
Date of next meeting: October 16, 1996 at 7:30 p.m.
Lea o_9G
Signature of Clerk Date of Approval