HomeMy WebLinkAboutPlanning Brd Min_211995( 95 F F 16 P,1 2 :03
PLANNING BOARD MINUTES
FEBRUARY 1, 1995 n
PRESENT: Chairman McClanahan, Clerk Sullivan
PLANNERS: Honda, Dolan, French, Trombetta
Shaun P. Burke, Director of Planning and Development
1. Meeting called to order at 7:30 P.M.
2. Public Hearing Continued - Winslow Estates
The clerk read new correspondence from the Engineering
Department. Michael Trowbridge, Hutchins - Trowbridge
Associates, showed the board revised plans wherein he
addressed Planning Board and department head comments. The
Engineering Department had requested monitoring wells, and Mr.
Trowbridge said he would do them at the infiltrator and
detention basin. He said because March is high ground water
month, he would request a continuation of the public hearing
until April. He added he checked on the culvert under East
Street and found it cannot handle the 100 -year storm.
Mr. Trowbridge requested waivers for the fence around the
detention pond and the oil /water separator at the front of the
subdivision. In exchange, he will plant an extra 200 feet of
trees as screening for existing abuttors. Planner Trombetta
asked about the benefit of waiving the oil /water separator.
Mr. Burke told him it had been done recently on subdivisions
in the area, but those were no longer in the Zone II district,
while this still is. Planner Trombetta said he would like
justification for the waiver. Mr. Burke explained the
abuttors are concerned about additional noise, and planting a
buffer was the developer's attempt to lower the noise. Mr.
Trowbridge said the chance of an oil spill at the catch basins
is slim, and the oil /water separator would just be one more
thing for the town to maintain.
Mr. Trowbridge said he got his drainage calculations from
Ralph Maloon, RIM Engineering and they would be reviewed by
the Engineering Department to look at how much water goes
under East Street and how much the drainage system could
handle.
In a straw vote, Planner Dolan abstained, Planners Trombetta,
Honda, French and Chairman McClanahan said they would be
inclined to be in favor of the waivers, and Clerk Sullivan
said he would not be in favor of the oil /water separator
waiver. He would, however, be in favor of the fence waiver
and suggested staggering the trees. The board agreed that
would be more attractive.
Motion: To continue the public hearing until April 5, 1995 at
7:30 P.M. with a corresponding extension in the
deadline for final decision to April 21, 1995.
( (French - Sullivan) All in favor PASSES
3. Public Hearing Continued - Smithfield Estates
The clerk read new correspondence from the Engineering
Department. Michael Trowbridge, Hutchins- Trowbridge
Associates addressed some of the comments. He asked what more
detail the engineers wanted on the plan. The existing water
main on Balcom Street is the property of the City of Attleboro
and Mr. Trowbridge said he would note on the plan the
applicant must get a connection permit. He said the engineers
had been concerned about ground water and explained he is well
above it. Clerk Sullivan asked Mr. Trowbridge to get. Scott
Leite's adjustment figures. The engineers had also asked for
the fire hydrant to be moved. The Planning Board told Mr.
Trowbridge to place the hydrant at the end of the cul -de -sac.
Planner French asked if the corner rounding easement was
existing. Mr. Trowbridge told him it is. Planner Sullivan
asked if the plan changes with the established wetland line.
Mr. Trowbridge responded it does not. Chairman McClanahan
asked if the abuttors' concerns had been addressed. Mr.
Trowbridge said all but one were satisfied, and they were
working with the last one.
Motion: To continue the public hearing until March 8, 1995 at
9:00 P.M.
(Sullivan- French)
Clerk Sullivan said he was concerned about lots 4 and 9. Jack
Smith said they would be given to the Conservation Commission
or to the City of Attleboro. Clerk Sullivan said he would
like that to be noted on the plan. Mr. Trowbridge said he
would discuss it with his client before the next meeting.
All in favor. PASSES
4. Public Hearing Continued - Classic Court
The clerk read the public hearing notice.
Ralph Maloon, RIM Engineering, presented the plan, which had
been approved in 1991 as a 6 -lot residential compound. Since
then, one lot has been removed and sewer has been added.
There will be a private driveway owned and maintained by the
residents. The Conservation Commission has verified the
wetlands line.
Attorney Garen Bresnick told the audience the open space would
be left in a natural state permanently, according to the by-
law. Mr. Maloon added the owners of the lots will jointly own
the open space, which will not be built on or filled.
William O'Brien, Conrod Court, asked about the restrictions on
the open space. Mr. Maloon told him there would be no
building, filling, changing of the topography or clearing of
the lot, which would be required to remain substantially as it
is when the plan is approved. Department Head Correspondence
The clerk read comments from the Engineering, Conservation and
Police Departments. Mr. Maloon said many of the Police
Department concerns had been addressed in the revision.
Board Comment
Planner Dolan said the entrance was in a good location.
Planner Bonda remembered at the preliminary stage, the
intersection offset had been an issue and wanted to discuss
it. Mr. Burke said he would send a memo to Officer Lawson
A
5.
asking him to reexamine the offset.- Mr. Maloon said he could
move the driveway, but it would be hard to center it with the
road across the street. He added that based on Officer
Lawson's comments, moving the driveway would make the sight
distance worse.
Clerk Sullivan asked Mr. Maloon to explain the drainage; Mr.
Maloon said the driveway pitches down to the sidewalk. Clerk
Sullivan requested proposed contours and spot shots in the
driveway.
Planner French asked where the sewer is. Mr. Maloon told him
it comes from Mill Street with a manhole in front of the
subdivision.
Clerk Sullivan asked why no test holes were shown. Mr. Maloon
said he could provide the information or do new ones.
Mr. Burke asked if there were any street lights proposed. Mr.
Maloon said there is a light existing across the street near
the proposed entrance, and.two planned for the driveway.
Clerk Sullivan asked about the three houses shown with dry
wells. Mr. Maloon explained that was a Conservation Commission
request because those lots fall within 100 feet of the wetland
line. Mr. Maloon said he would get dry well details. Public
Comment
William O'Brien asked why the open space lots did not appear
to be connected. Mr. Maloon explained they are adjacent, with
a wetland strip between. Mr. O'Brien asked what the
regulations would be if the owners put a swimming pool in the
open space. Chairman McClanahan explained the applicants
would have to go before the Planning Board and Conservation
Commission, and if they fall within 100 feet of the wetland,
the abuttors would be notified.
Motion: To continue the public hearing until March 15, 1995 at
7:30 P.M.
(French - Trombetta) All in favor. PASSES
Correspondence
1. Memo from Mr. Burke to Board of Selectmen and Judy
Scott RE: Annual Town Meeting warrant
2. Letter from Amos Robinson to Bernie Dolan RE: appointment
3. Memo from William Williams RE: planning session
4. Memo from William Williams RE: Kelli Baker town
meeting article
5. Memo from William Williams to Planning Board RE:
growth management seminar
6. Letter from Attorney Robert Mangiaratti RE: Hope
Street Mansfield Realty Trust
7. Letter from Atty Mangiaratti RE: Pheasant Hollow
8. Letter from Amos Robinson to Karl Clemmey RE: open air
parking facility
9. Letter from Tom Graney RE: Woodland and Woodlot
10. Letter from Mary Jameson RE: Jameson Farm
GR
i
11. Letter from John Grady, Dunn - McKenzie RE: open air parking
12. Letter from Glenn Jaros RE: surplus material removal
Ingrid Drive
Motion: To send the Building Inspector a positive
recommendation on the removal of 500 cubic yards
of surplus material (Sullivan - Bonda) All in favor.
PASSES
13. ZBA appeal of Robert Brown Pratt /Crocker Streets
Motion: To send the ZBA a letter of support of the
Building Inspector's decision. (Dolan - Bonda) All
in favor. PASSES
14. ZBA application for variance Lester Epstein Fruit Street
Motion: To send the ZBA a positive recommendation provided
this is the same plan previously granted a
variance.
(Sullivan- French) All in favor. PASSES
15. Minutes January 11, 1995
Motion: To approve as written
(Sullivan- French) Five in favor. One abstention.
PASSES
16. Minutes January 18, 1995
Motion: To approve as written
( Bonda- French) Four in favor. Two abstentions.
PASSES
17. Minutes January 25, 1995
Motion: To approve as amended
(Sullivan - Trombetta) Five in favor. One
abstention. PASSES
Public Discussion
Karl Clemmey told the board the Back Bay Brook goes through
his proposed subdivision, Woodlot Estates, and that he will
have to go through the Engineering Department and the Corps of
Engineers to bring it up to approval. Chairman McClanahan
told him the board would not discuss his subdivision outside
the public hearing. . Mr. Clemmey requested time on the
Planning Board agenda to discuss other issues. He also asked
the board who he should speak to about building a road over
town -owned property because he is trying to buy a house over
the town's interceptor. He told the board he would prefer not
to continue his public hearing to the same night as Woodland
Park. The board will place Mr. Clemmey on the agenda
February 15, 1995 at 9:30 P.M. for discussion.
Michael Trowbridge said he was concerned about the board's
proposed amendment to the lot width definition, saying it
would be impossible to define on a curve or cul -de -sac, and
suggested deleting it. Mr. Burke said it was to prevent lots
from having acute angles and keep them more regularly shaped.
He asked Mr. Trowbridge if the proposed measure wouldn't work,
what would? Mr. Trowbridge asked if he came up with another
proposal, would the board look at it? Mr. Burke said it
\ would, since the amendment had not gone to public hearing yet.
7. Around the Table
Planner Trombetta asked if the site walk for Saturday,
February 4 was still on. The board agreed to meet at Town
Hall at 8:30 A.M.
Planner Bonda asked to send a letter to Representative Barbara
Hyland with a list of topics the board would like to discuss
at its March 8, 1995 meeting. These include day care centers,
impact fees, the February 18 growth management seminar and the
Gilbert Street bridge reconstruction.
Clerk Sullivan suggested the zoning by -law amendments be taken
care of at a public hearing March 1, 1995 at 7:30 P.M.
Planner French asked if Woodlot Estates and Woodland Park had
been sent out for engineering review. Mr. Burke told him they
had not, but would be soon. Planner French also asked if the
Engineering Department had done the sight distance at Carlton
Estates yet. Mr. Burke said he had not heard from them.
Clerk Sullivan suggested sending the Town Manager a letter
asking him to explain why he planned to move the Planning
Department offices from the Paine School to Town Hall without
consulting anyone. Planner Bonda agreed. Motion: To send the
Town Manager a letter requesting his facts and rationale for
moving the Planning Department offices to Town Hall.
The board would prefer things be left as they are and
request he reconsider the move. Send a copy of the
letter to the Board of Selectmen
(Sullivan- French) All in favor. PASSES
8. Adjournment
Motion: To adjourn at 10:30 P.M.
( Bonda- Sullivan) All in favor. PASSES
Date of next meeting: February 22, 1995 at 7:30 P.M.
5�9 S
Si ature o t Clerk Date of Approval