HomeMy WebLinkAboutPlanning Brd Min_10111995'IS OCT 27 Ali O .. l,9
PLANNItNG BOARD MINUTES
October 11, 1995 x i - t 1 ( )
PRESENT: Chairman French, Clerk Sullivan 17S5',CHUSETTS
PLANNERS: Bonda, Dolan, Flynn, McShane, Trombetta
1. Meeting called to order at 7:00 P.M.
Motion: To appoint Clerk Sullivan Acting Chairman and Planner Bonda
Acting Clerk (Dolan - Flynn) All in favor. PASSES
2. Correspondence
1. Letter from Herb Fuller, East Coast Development, RE: Street Acceptance
2. Minutes September 27, 1995
Acting Chairman Sullivan asked that condition 2 on the Old Colony site plan be
amended to read there be trees between the fence and the abutters.
Motion: To approve the minutes as amended
(Flynn - Dolan) Five in favor. Two abstentions. PASSES
3. Memo from William Williams to Chief Arthur O'Neill RE: East St speed limit
4. Memo from Chris Marion, Assistant to the Town Manager RE: joint IDC meeting
Mr. Burke told the board he had received a call from Patricia Reading of the North
Attleboro Planning Board asking if any of the Mansfield Planning Board members
would be interested in filling a vacancy on the Mass Association of Planning and
Appeals Boards. ivh% Burke will get a description of the responsibilities.
3. Around the Table
Planner Flynn said she had seen an article about parking at the Cleveland Twist
building saying there would be no site plan review needed. She suggested the
board send a letter suggesting they check with the Planning Board or Building
Inspector on that,
Motion: To send the above letter (Flynn - Dolan) All in favor. PASSES
Planner Bonda asked if Town Counsel had responded to the request for
opinion on the Williams Street bridge. Mr. Burke said he had not.
Planner McShane asked if anything had come out of the East Street discussion
and said two days before the joint meeting, a child was hurt there.
Planner Dolan said the ramp from Route 140 onto Route 495 was dangerous
and asked if there was anything the town could do about it. Mr. Burke told him
if it is in the state's layout, there was not.
Chairman French asked if the board should support the Scott/Goyea land
acquisition at Town Meeting. Mr. Burke said the board should have a presence
and the chairman usually speaks.
4. Public Hearing Continued - Eastiield Village
The clerk read new correspondence.
Mt. Folkman said he had spoken with Mr. Frain and they were in agreement,
and Mr. Covett had agreed to grant an easement.
Ralph Maloon, RIM Engineering, addressed the items still under discussion.
1. Stoimwater detention basin design and location - Mr. Maloon said he was
requesting a waiver on the location of the basin, because although it would
be closer than 100 feet to the property line, if it were in the valley it would
be shallower.
2. Roadway to Covett-Mr. Maloon said an easement had been worked out.
3. Drainage easement to wetland - Mr. Maloon has added this to the plan and
there is an agreement with the abutters.
4. Sight Distance - Mr. Maloon did a sight distance plan and said there is a
small hill that will have to be removed.
5. Sidewalk - Mr. Maloon said the easement is shown on the plan and there
had been discussion about replacing one with a sidewalk on Maple Street.
6. Street length - Nicole Road - Mr. Maloon said it has been brought into
compliance.
7. Open space lots - Mr. Maloon identified lots 10 -11 as open space because
they abut the town -owned land.
Board Comment
Planner Flynn said if the location of the drainage area was alright with the
abutter, Mr. Covett, it would make more sense to leave it in the valley.
Planner Bonda asked where the sidewalk would go on Maple Street. Mr.
Maloon said it would go from the Easton line to the Certuse's property. Mr.
Burke said it made sense to eliminate the sidewalk on the last stretch of Noreen
Road and keep the sidewalks on Nicole and Maple Street. Planner Flynn asked
if the board should be discussing eliminating sidewalks at all for safety.
Blasting - Mr. Folkman said he had no new information and it would be up to
the board whether to leave the notification and pre -blast inspections at 500 feet
or require him to go further. He said he had considered volunteering to go
further, but discovered that was unreasonable because of the number of houses.
Mr. Burke said he had contacted other cities and towns, which said they do not
regulate blasting, and put an ad in The Beacon requesting information on
blasting regulations, and received no response. He said the Fire Department
regulates blasting, and the Board of Health if there is potential impact to a well.
Planner Dolan was concerned about the abutters who had come to the public
hearing and said he thought the developer would want to do pre -blast surveys
for at least those people. Mr. Folks an said he was willing to do surveys on the
subdivision side of Lewis Road. Mr. Burke suggested doing the frontage lots
on Maple Street and the direct abutters on Lewis Road. Mr. Folkman said a lot
of those abutters would be caught in the required 500 feet. Clerk Sullivan
suggested doing a test blast to see what charge is needed, and based on that
decide who will be effected.
Water Issues - Mr. Folkman said he had met with staff and it was suggested a
water pressure boosting system may be entertained by the Water Department.
He asked if one system to take care of this subdivision should be done, or
should he get together with staff to work something out for the whole area. He
said he wasn't sure of the magnitude of the problem and what could be done,
but is willing to get a company that designs pumps and water systems to find
the best solution. He said he would need direction from the board and staff.
Chairman French was concerned about the length of time the public hearing
has gone on. Mr. Folkman said'he is willing to work on an existing problem in
the area, and the other issues about his subdivision had been resolved. Clerk
Sullivan said Mr. Folkman had had plenty of time to work out all of the items.
Planner McShane said the worst outcome would be a solution just for this
subdivision and there should be a broad solution found quickly.
Planner Bonda asked why the developer had not suggested a cooperative effort
sooner, adding that she was not willing to entertain another extension and was
disappointed all the items had not been taken care of Mr. Folkman said he
had waited six months for answers to his water questions and then worked out
what he could in two months. Chairman French said he had seven weeks
between the time he got the water letter and this meeting. Mr. Folkman agreed
he could have pushed harder in that time, but there is a need for a joint
discussion. Planner Flynn said she understands Chairman French's concerns
about the length of time the public hearing has gone on, but said she does not
want the extra expense of pumps. She said she was prepared to vote, and
although she thought a joint meeting was a good idea, it was something for the
Board of Selectmen or Water Commissioners to work out with the developers.
Site said the Planning Board had to look at the plan, the recommendations, and
make its own decision. Planner Trombetta said he was not inclined to drag the
public hearing out any further.
Mr. Burke said water is a significant issue, and resolution may be broader than
one subdivision. He said it is a legitimate planning goal to look at the whole
system, and the board has until November 17 for final action.
Public Comment
Fred Leach, Cavan Crossing, said Folkman and Zola had blasted in his
subdivision a year ago and caused a lot of damage and noise.
Rick Gleason, 14 Lewis Road, said blasting is likely because of the large
boulders in the area, and that the 500 feet required is the Fire Department's
regulation and is not concerned with radon, wells, etc.
Phil Gengera, 5 Lewis Road, said the board should consider working out a
broader solution.
Nancy Richardson, 23 Lewis Road, said she has radon because of blasting and
because of the radon system she has to use, her electric bill has gone up.
Nit. Folkman suggested himself and Mt•. Zola, a representative of Tata and
Howard, the Water Commissioners, and the Planning Board, Dave Archard,
Bob Swanson, Mr. Burke, their consultant and Mr. Maloon get together to
discuss the problem and potential solutions. He said he does not want to do
specs on something like pumps without direction from the town.
Motion: To close the public hearing
(Sullivan - Bonda)
Clerk Sullivan said there may be a solution, but it should have been done before
this. Planner Dolan agreed it may not be all the developer's fault. Chairman
French said an option would be to grant one more continuance with the
stipulation there be real progress made, and put the charge on the developer to
decide what he is willing to do, contact people and put the meetings together.
He said he would like to be able to do something about the whole area, but
didn't want to keep dragging this public hearing out. Planner McShane said he
was in favor of the developer and staff getting together, but it should be done
with a short time frame, adding he still has some problems with the other issues.
Three in favor. Four Opposed. FAILS
Mr. Burke suggested continuing the hearing two weeks and have the developer
put together a list of the group and an outline for discussion, then hold the
meeting with the results reported back to the board. Based on these results,
consider an extension of the final action date.
Motion: To continue the public hearing to October 25, 1995 at 8:30 P.M.,
with the developer organizing and holding a meeting and reporting its
results to the board. Based on these results, the board will then
consider the need to extend the final action date.
(McShane- Dolan) Five in favor. Two opposed. PASSES
5. Public Hearing - Eastleigh Estates North Phase II
Planner Trombetta left the meeting room at this point.
The clerk read the public hearing notice and correspondence. There was no
representative of the developer at the meeting, and Mr. Burke told the board he
had had no response from the developer or his office to calls or letters over the
last several months.
Mr. Burke explained the Planning Board has the ability to modify, amend, or
rescind the plan, and had done a modification hearing in 1990 to force the
completion of Phase I, then accepted surety for Phase II. When a developer
defaults on the two year completion deadline, the board can apply the balance
of the surety to the completion of improvements. He said because this surety is
in the form of an insurance company bond, completion would depend on the
bonding company's expediency, the Town Meeting vote to use the $200,000
surety to complete the ways, and the town acting as the contractor to finish the
required improvements.
Public Comment
Carol O'Donnel, 18 Cavan Crossing, asked how long that would be. Mr.
Burke told her it depended on how fast the bonding company settles. He said it
would probably not be before the end of this construction season, but he hoped
it would be by next year. He explained the Board of Selectmen could vote to
make temporary repairs to the private way, but for the town to do more than
that he would have to check with Town Counsel. He told the abutters it was
possible that if the board rescinded the four unbuilt lots, the developer could
pile all of the refuse there because it is private property,
Steve Parker, 48 Wexford Drive, said there are dangerous piles of dirt and
rocks and asked if anything could be done to clean them up in the meantime.
Mr. Burke said he didn't think the town had the ability to do anything, but he
would check with Town Counsel.
Bill Madan, 30 Winthrop Avenue, said it had been Planning Board policy to
immediately rescind the unbuilt lots, which may get quicker action than taking
the bond. Mr. Parker said he did not think those lots were builidable. Mr.
Burke said he had spoken with Conservation Agent Dick Lewis, and there is
some question about buildability.
Planner Dolan suggested sending Town Counsel a letter asking for an opinion
on the feasibility of the town entering onto private property and said
previously, residents had petitioned the court because of safety issues. Mr.
Burke said the dint pile would be cleaned up when the town goes in to do the
other improvements. Planner Flynn was concerned with the safety issues and
said there should be some way for the board to help. Mr. Burke said the board
is constrained by the developer's rights, which is why he suggested contacting
Town Counsel. He said the board could find the developer in default, rescind
the lots, and direct Town Counsel to acquire the surety. He recommended
sponsoring a Town Meeting warrant, writing the Board of Selectmen advising
them of the board's action and requesting sending the DPW to do repairs.
Fred Leach, 35 Wexford Drive, said there are also drainage pipes, rocks, trees,
etc. in the right -of -way and Kerry Drive is not completed. He asked if the
board finds the developer in default and then he begins work, what would that
do? Mr. Burke said once the board makes a decision and Town Counsel takes
action against the surety, that would be followed through.
Mr•. Madan said if the developer has been non - responsive, he probably will not
( sign a hold harmless for snow plowing and suggested sending the Board of
Selectmen a letter asking them to have the road prepared for the winter.
John Thayer, Cavan Crossing, said the punch at is long and asked if there
would be enough money to complete it. The clerk re -read Mr. Clifford's
memorandum saying the $200,000 would be more than enough to finish the
required improvements.
Richard Franklin, 14 Cavan Crossing, asked how sure the board was the work
can be done for $200,000. Mr. Burke explained that is the insurance
company's money, and the developer only paid a premium on that.
Susan McCormack, 52 Wexford Drive, asked what would happen if the town
did not secure the bond. Mr. Burke said the board could sue the developer
personally, but there is no reason the town won't get the money, as it is clearly
a case of default.
Motion: To close the public hearing
(Dolan- Sullivan) All in favor. PASSES
Motion: To find the developer in default for failure to complete the required
improvements, rescind Lots 53 -56, instruct Town Counsel to pursue
the bond, sponsor a Town Meeting article for the bond money to go
toward the improvements, send the Board of Selectmen a letter
advising them of this action and request they send the DPW out to do
temporary repairs and get the street ready for snow plowing, send
Town Counsel a letter requesting an opinion on what the town can
do on private property and what the town can do under its police
powers to address the public safety issues
(Dolan- Bonda) All in favor. PASSES
Motion: To send the Board of Health a letter asking what it can do under its
public safety /public nuisance powers.
(Sullivan - Bonda) All in favor. PASSES
Planner Flynn said under 3.3.3.22, the developer is supposed to have stabilized
he dirt piles and asked if there was anything that could be done under that
regulation. Mr. Burke said he would check with Town Counsel.
6. Public Hearing - Chandler's Estates
The clerk read the public hearing notice and a letter from the applicant's e
engineer requesting the public hearing be continued due to a procedural defect.
Motion: To continue the public hearing until November 8, 1995 at 7:30 P.M.
(Dolan - Flynn) All in favor. PASSES
7. Adjournment
Motion: To adjourn at 11:15 P.M.
(Dolan - Bonda) All in favor. PASSES
Date of next meeting: Wednesday, October 11, 1995 at 7:00 P.M.
/0A5 /05---
Sign. rre of Clerk Date ofi p roval