April.21, 1993
Present: Chairman Madan, Acting Clerk Annino
Planners: Caponigro, Flynn, McClanahan*
Shaun P. Burke, Director of Planning and Development
1. Meeting called to order at 7:30 P.M.
2. 7:30 P.M. - Appletree Farm Continued Public Hearing
Clerk Cadden read a memo from the Engineering Department to
Planning Board regarding the drainage system.
Ralph Maloon, applicant's engineer, presented revisions made to
the plan which shad been requested at the previous public
hearing.
Board Member Comments
Planner Flynn asked if the perforated pipe being used for the
drainage system is the same type as is used in Windermere and
Sturbridge. Planning Director Shaun Burke stated that it is not
similar to the system used in those subdivisions but may be
similar to Northridge. Planner Flynn also asked if the
residential compound use had been explored, if the handicap ramp
location had been changed, if drainage calculations has been
certified, if the type of wetlands replication has been stated,
and if the trees which are already planted in the location of
the cul -de -sac are going to be included in the surety.
Public Discussion
Dot Paiva of 280 Willow Street stated she is concerned that Lot
5 looks like it is in a lot of wetlands.
Board Member Comments Continued
Chairman Madan asked Mr. Maloon if the Conservation Commission
had set the wetlands lines yet. Mr. Maloon stated that he
recently re- flagged the area, but he has not filed with
Conservation yet. Chairman Madan also asked if the metal pipe
being used for the drainage system meets the requirements of the
Subdivision Regulations. The Subdivision Regulations call for a
reinforced concrete pipe when going under streets. A waiver
would have to be requested for a metal pipe and requested in
writing. Mr. Maloon explained his reason for wanting a metal
pipe.
Planner Caponigro asked if galleries would serve the same
purpose as the pipe.
Mr. Maloon stated that he could design the system so it is not
under the street, but it would require an easement on Lot 4.
Chairman Madan stated that he would prefer discharging water off
the street.
Planner Flynn :asked about the number of sidewalks and if the
fire hydrant 'location has been approved by both the Water and
Fire Departments
Chairman Madan asked if a sidewalk could be installed in front
of Lots 3 and 4 and questions about cul -de -sac planting.
Shaun Burke, Director of Planning and Development, suggested
that a note be added to the subdivision plan stating that the
cost of planting all cul -de -sac plants and shrubs will be
included in the surety.
Chairman Madan suggested that the cost to remove growth already
in the cul -de -sac island area also be included in the surety.
Mr. Burke stated that he had a bad experience with an
infiltration system under a roadway in a previous town he worked
for, but that it may have been more of a construction problem
than a design problem. A note should also be added to the plan
stating that hay bales and a siltation fence shall be used
during construction and an easement may be required for site
distance on Lots 1 and 2 if trimming will have to be done.
Planner Flynn expressed concern of the Lot Nos. 4 & 5 being
located within the flood plain being directly downstream of
significant water body. Planner Flynn also asked what the depth
of the crushed stone is and if' any poorly drained soils are on
site.
MOTION: To continue the hearing to June 2, 1993 at 8 P.M. to
get more drainage discussion from the Engineering
Department. Shaun Burke should point out the
discrepancy between the Engineering Departments_
recommendation and what is required in the Subdivision
Regulations to the Engineering Department.
(Flynn - Cadden) All in favor. PASSES.
3. 8:00 P.M. - Discussion with Jack Riccio Regarding Mill Farm
Estates Phase II
Jack Riccio stated that he would like the Board to release Phase
II of Mill Farm Estates, 10 lots, from the Flint's covenant and
place them back under covenant in his name.
MOTION: To release Phase II, 10 lots, from the Flint's
covenant.
(McClanahan - Caponigro) All in favor. PASSES.
MOTION: To put Phase II under covenant in Jack Riccio's name.
(McClanahan - Caponigro) All in favor. PASSES.
MOTION: To consider installation of sewer for Phase II of Mill
Farm a field adjustment.
(McClanahan- Caponigro) All in favor. PASSES.
4. Town Meeting Warrant Article Recommendations
Article 1127 Resource Recovery Facilities
MOTION: To send a, positive recommendation to Town Meeting.
(Flynn- Cadden) All in favor. PASSES.
Article 1128 Non - Conforming Uses
Prior to voting on this article regarding non - conforming uses,
the Planning Board discussed whether or not to withdraw it.
Based upon information presented by the Land Use Study
consultants, the nonconforming use by -laws will have to be
completed amended in the near future. The Board was presented
with the question of whether or not to withdraw the article now
and wait to submit all the amendments at once at a later date.
MOTION: For a favorable recommendation.
(Flynn - McClanahan) All in favor. PASSES.
Article 1129 Residential Compounds
MOTION: For a favorable recommendation.
(Flynn - McClanahan) All in favor. PASSES.
Article 1130 Temporary Uses
MOTION: For a favorable recommendation.
(McClanahan - Caponigro)
The Planning Board Discussed amending the time frame stated in
this proposed by -law to five consecutive days and no more than
ten days within a year.
MOTION: For a favorable recommendation and to recommendation
the number of consecutive days be changed to five and
the total number of days be changed to ten.
( Cadden- McClanahan) All in favor. PASSES.
Article 1138 Rezoning Petition of Michael Morizio
MOTION: For a favorable recommendation at Town Meeting.
(Flynn - McClanahan) (2 -3) Planners Flynn and McClanahan
in favor. FAILS.
Before voting on the above motion, the Planning Board discussed
the effect rezoning the land would have on it.
Article 1140 Rezoning Petition of Karl Clemmey
MOTION: For a negative recommendation to Town Meeting.
(Flynn - Madan) (2 -3) Chairman Madan and Planner Flynn in
favor. FAILS.
Special Town Meeting Article 115 Moratorium
Planning Director Shaun Burke respectfully suggested the
Planning Board withdraw this article from the Special Town
Meeting warrant stating that the Land Use Study being conducted
in the Great Woods area is already well under way and should be
completed by June.
MOTION: To withdraw Article #5 from the Special Town Meeting
warrant.
(Caponigro- Flynn) (4 -1) Planner Flynn opposed. PASSES.
5. 8:45 P.M. - East Street Residential Compound Public Hearing
Applicant: Exclusive Realty Trust
After reading the public hearing notice, Clerk Cadden read a
request for continuance of the public hearing from the applicant
because only five of the seven Board members are present.
MOTION: To continue the public hearing to May 19, 1993 at 7:30
P.M.
(McClanahan- Cadden) All in favor. PASSES.
6. 8:50 P.M. Hub Folding Box Site Plan Review
The applicant and his engineer presented the site plan of a
proposed one -story addition to the Hub Folding Box company.
Clerk Cadden read a memorandum to the Planning Board from the
Engineering Department.
The Planning Board discussed the number and type of parking
spaces.
MOTION: To send a favorable recommendation to the Building
Inspector including all of the Engineering Departments
comments.
(McClanahan - Cadden) All in favor. PASSES.
7. Correspondence
ENF for Mill Farm Estates
Memorandum from the Engineering Department to the Planning Board
regarding Deerfield Village drainage
A concensus of the Planning Board was to request a copy of the
drainage plan referenced in the above memorandum and request
that the Board be included in the approval process and
discussion of the plans.
Memorandum from Shaun Burke, Planning Director, to William
Williams, Town Manager, regarding the Windermere drainage
system.
Robyn Lane Form J Release & Letter from Joan Cutillo, Town
Treasurer, stating that she is in receipt of a passbook in the
amount of $19,000 to guarantee completion of the subdivision
MOTION: To sign the Release.
(Flynn - McClanahan) (4 -0 -1) Chairman Madan Abstains.
PASSES.
Biofiltration workshop notice given by Phil Barske
Memorandum to Joe Pasquale, Chairman, Board of Selectmen, from
the Planning Board regarding George Fram Estates.
Memorandum to the Planning Board from Shaun Burke, Planning
Director, regarding sale of Balcom Ridge III
Memorandum from the Conservation Commission to the Planning
Board regarding street acceptances
Letter to David Longendorfer from Dan Clifford, Subdivision
Inspector
Letter to Dan Haley from Dan Clifford, Subdivision Inspector
IDC Meeting Notice
Memo from Folkman & Zola Builders to the Planning Board
regarding Beaumonts Pond Estates
Letter to Walsh Development from Dan Clifford, Subdivision
Inspector, regarding Treetop Estates
Zoning Board of Appeals recommendations:
John Sylva - 105 Union Street
MOTION: To send a positive recommendation to the Zoning Board
of Appeals.
(McClanahan- Flynn) All in favor. PASSES.
Barry and Susan Melemed - 5 Morini Street
MOTION: To send a positive recommendation to the Zoning Board
of Appeals.
(McClanahan - Flynn) All in favor. PASSES.
Michael and Winifred Masino - 49 Fruit Street
MOTION: To send the same recommendation as we did before.
(Flynn - Cadden) All in favor. PASSES.
Easton Public Hearing Notice
Foxboro Public Hearing Notice
Letter from Bay State Gas Co.
Outreach Newsletter
Letter from Harborline Environmental Services
OECD Recent Publications
Mansfield IDC Forum
Notice
APA Magazine
Journal of the American Planning Association
Seminar Notice Investing in Urban America
CUPR Books
8. Form A (ANR) Plans
Exclusive Realty - East Street_
Request from the applicant to withdraw the plan and for the fee
to be waived if the plan is resubmitted
MOTION: To accept the withdrawal of the plan and to waive the
filing fee for the resubmission of the plan.
(McClanahan- Caponigro) All in favor. PASSES.
9. Town Meeting Warrant Article Recommendations Continued
Article #36 Petition to Sell Lot 200 Assessor's Map 1
MOTION: To recommend the parcel be sold.
(McClanahan- Cadden)
The Planning Board discussed the proceeds from the sale of land
being used only to purchase other land and the lot being sold
with the stipulation that no structure could be erected on the
lot.
MOTION: To table.
(Flynn- McClanahan) All in favor. PASSES.
Article #37 Petition to sell Assessors Map 27 Lots 54 and 57
MOTION: To table.
(McClanahan- Flynn) All in favor. PASSES.
_Sale of Balcom Ridge III
MOTION: To authorize the Board of Selectmen to do what they
need to do.
(Flynn- McClanahan) All in favor. PASSES.
Article #39 Petition to sell Assessors Lot 26 Map 37
MOTION: To support the sale of the lot in order for the lot to
conform to both side and rear yard setbacks.
(McClanahan - Caponigro) All in favor. PASSES.
10. Adjournment - 10:00 P.M.
Clerk's Signature
Q, J a--h3
Date of Approval