HomeMy WebLinkAboutPlanning Brd Min_6241992Alter alscusslvil vi —lu Ni -, .. -- - -- --- -_ -- -- -
following recommended prioritization:
1. Williams Street Bridge
Z. Balcom Street Reconstruction
3, Ware Street Sidewalks
4. Overlay projects with the addition of Pine Street
5. Otis Street \School Street \Whitetail Lane Intersection
6. Copeland Dri.ve \West Street \School Street Intersection
7. Maple Street \Bird Road \Winter Street Intersection
8. Stearns Avenue Reconstruction'Intersection
3. 8:00 P.M. - Day Avenue Extension Public Hearing
Clerk Cadden read the public hearing notice and the following
correspondence:
* Memorandum from Ben Couture, Water Department
Memorandum from Richard Lewis, Environmental and Conservation
Planner
David Grant of Norwood Engineering presented the proposed extension
of Day Avenue to the Planning Board and public in attendance. The
proposal is to extend Day Avenue by thirty -five (35') feet.
Public Comment:
Warren Chapman -
14
Bliss Avenue
- Opposed
to extension
Cate Vians -
29
School Street
- Buffer
- Opposed
Zone
to another house being
Peggy Chapman -
14
Bliss Avenue
Carmella Burgio -
built
12 Day Avenue -
Opposed to
another house being
built
Gloria Robertson
- 51
Carpenter Avenue
- Uses
allowed on lot
Marilyn Powers, Conservation Commission Member, stated that the
wetland line did not change after a site walk was conducted by
three Conservation Commission members.
Page 2 of 8
Planning`Board`Minutes
:,-June .24, 1,992
Board Comments:
Planner Cadden questioned the status of Day Avenue, public vs.
private. Mr. Grant stated that Day Avenue is a private way.
Planner Flynn questioned the Board's authority to hear the
proposal because of Day Avenue's status as a private way. Mr.
Burke stated that it is his opinion that the Board has the
authority to hear the proposal and that the issuance of a building
permit is separate and apart from the Planning Board.
Planner Quinn questioned the reasoning behind only extending Day
Avenue thirty -five feet and not to its intersection with Carpenter
Avenue and a waiver of a cul -de -sac or turnaround.
Planner Annino questioned the roadway drainage system. Connection
of new and existing pavement according to Mass Keyway Cut
Standards. Street lights. Fire hydrant.
Shaun P. Burke, Director of Planning and Development, questioned
the need to extend the pavement to the intersection with Carpenter
Street and for a turnaround.
4. 8:30 P.M. - Thomas Street Rooming House Special Permit Public
Hearing _
Request from Charles Mulcahy, applicant's attorney, to continue the
public hearing.
MOTION: To continue the rooming house special permit public hearing
on September 2, 1992 at 8:00 P.M.
(Cadden-Quinn) All in favor. PASSES.
5
no
Day Avenue Extension Public Hearing Continued
At this time the Board discussed maintenance of the way, the need
for a 6" watermain, sewering, and the need for a fire hydrant.
At the conclusion of the discussion, a consensus of the Board was
to request input from Lt. Sarro, Fire Prevention Officer, regarding
the need for a fire hydrant and pull box and Robert Swanson, DPW
Director \Town Engineer, regarding the 6" watermain.
MOTION: To continue the public hearing
1992, at 8:00 P.M.
(Quinn - McClanahan) All in favor.
9:00 P.M. - Discussion with Harry Blackie
Street Cluster Development
on Wednesday, July 22,
PASSES.
- Conceptual - Branch
Harry Blackie, representative of New England Investors Trust,
owners of a site on Branch Street, summarized his last meeting with
the Planning Board. Tim Jordan presented revisions made to the
Planner Quinn stated that he would like to see more worx uoue U<<
the conventional subdivision in order to prove that it could also
be approved and that the cluster development is actually an
alternative. The concept itself looks good. be
it Planner Annino stated that it is his opinion that throughldthe
extremely time consuming to have the developer go
entire permitting process with both a conventional and a cluster
development.
Planner Flynn expressed concern that alot of work has been done to
the plan but no abutters have been present to give comments or
recommendations on the proposal. l
Planner Annino stated that the off -site improvements, buffering
homes across the street from the entrance, but they would have to
figure out how to do it.
7. Discussion with Joan Russel - Oakland Maple Street - Map 30 Lot 82
Ralph Maloon presented a proposal to the Planning Board in which
Ms. Russel would like to subdivide Parcel 82 of Map 30 into a
residential subdivision. However, the parcel is zoned industrial
as well as the land surrounding it.
A consensus of the Board was not to support the proposal
d because
e
it would be considered spot zoning and would strongly
from the intent of the Zoning By'
8. Deerfield Village - Signing of Mylars
MOTION: 'To accept the homeowners' association document and
covenant and to sign the plan.
(Cadden- McClanahan) All in favor. PASSES.
9. Beaumonts Pond Modification Decision
MOTION_ To modify the Beaumonts Pond subdivision plan in the
following manner:
i.a. To allow the addition of Form A (ANR) .plan lot line
changes to the subdivision plan. Said lot line
changes are shown on Sheet 5 of 19 and are also
shown on a plan titled "Plan of Land for Ralph
Seifert ", dated October 24, 1989, and endorsed by
the Mansfield Planning Board on April 4, 1990.
Page 4 of 8
Planning Board Minutes
June 24, 1992
b. To approve the request to delete a ten (10') foot
temporary construction easement on the property of
Mark Souza (shown on Assessor's Map Number 38 Lot
Number 34).
2. To add previously approved waiver notes to the
subdivision plan. Said waivers are as follows:
A. Section 4.8 - Sidewalk width, location, location
of grass strip, and location of fire hydrant
B. Section 5.5.1 - Bituminous Cape Cod curb in lieu
of granite curb except vertical granite on radii
C. Section 5.2.2 - Roadway width increased from
24'(feet) to 26' (feet).
3. To approve the request to add a note to the
Beaumonts Pond Estates subdivision plan, revised
April 27, 1992, topographic sheet shown as page 7 of
19 regarding development of Lots 12, 13, 14, and 15
and requiring notice to abutters of Lots 12 -15
inclusive, said note to read:
"NOTE TO OWNERS Prior to the development of Lots
12 -15, you are required to notify the abutting
homeowners listed below, via certified mail return
receipt requested, of the site development _plan
details. This notification will be satisfied via
the mailing of the Board of Health site plan.
Homeowners are: Nos. 308, 318, 328, and 336 Maple
Street, Mansfield."
4. To grant the request for a waiver of Section 5.2.4 -
Embankment of Joanna Drive, Station 8+90 to 11 +80,
to begin slope of earthen berm at edge of roadway in
lieu of to be starting at the edge of right -of -way.
5.a. To grant the request to modify the plans by removing
from the plans a retaining wall detail shown on the
Beaumonts Pond Estates subdivision plan Sheet 9,
revised September 19, 1992 from said plan and to
grant the request to replace said retaining wall.
with an earthen berm as shown on Sheet 9 of 19
revised April 27, 1992, and again on Detail Sheet 19
of 19 revised April 27, 1992.
b. To configure a temporary construction easement for
the purpose of construction of an earthen berm on
Map Number 38 Lot Number 2, N/F Ralph Penney shown
on Sheet 9 of 19 revised April 27, 1992. Terms and
6. As a condition of approval of the Beaumonts Pond
Estates subdivision plan, the applicant and /or
subsequent owner(s) and /or assignees shall be
required to construct the earthen berm as shown on
Sheets 9 and 19 revised April 27, 1992 concurrently
with the initial construction of Joanna Drive. The
installation of the earthen berm shall occur
immediately after the tree stumps are removed for
the installation of Joanna Drive and before the
installation of the underground utilities for the
subdivision (i.e. water, drainage, electric, and /or
gas). The installation of the berm shall be
complete when the berm is loomed and seeded.
It is the intent of this approval to include by
reference all conditions contained in the original
written subdivision approval of July 12, 1989 and
the subsequent modification of said approval of
September 4, 1991
(Quinn - Cadden) (6 -0 -1) Planner Annino Abstains.
PASSES.
10. Form A (ANR) Plans
Muller & Stowe - East Street
PfOTION:_ To sign.
(McClanahan- Flynn) All in favor. PASSES.
Billings Realty Trust - Thomas Street /No. Main Street
MOTION: To sign.
(McClanahan- Caponigro) All in favor. PASSES.
,,j TION :_ To reconsider. McClanahan
(Annino - Flynn) (5 -2) Planners Caponigro and
opposed. PASSES.
MOTION_ To table until the dimensions of the Billings Realty Trust
lot are sho�•rn on the plan.
(Quinn - Annino) (6 -1) Planner McClanahan Opposed. PASSES.
Ferrara
MOTION:
11, Minutes
Minutes
MOTION:
- Branch Street
To sign.
(McClanahan_ Cadden) All in favor. PASSES.
of May 13, 1992 and May 27, 1992
To accept.
(Flynn - Quinn) All in favor. PASSES.
MOTION: To accept.
(McClanahan- Annino) (6 -0 -1) Chairman Madan Abstains.
PASSES.
12. Correspondence
Request from Folkman and Zola Inc. and recommendation from Dan
Clifford, Subdivision Inspector, that the remaining balance for the
Sturbridge Estates 'surety shall be $248,364.40
MOTION: The remaining balance of the Sturbridge Estates surety
shall be $248,364.40.
(Cadden- Flynn) All in favor. PASSES.
Request from William Yetman and recommendation from Dan Clifford,
Subdivision Inspector, that the remaining balance for the surety
for Erick Road shall be $131,705.00
MOTION_ The remaining balance of the Erick Road surety shall be
$131,705.00.
(Cadden - Caponigro) All in favor. PASSES.
Planner McClanahan left the room at this time._
Recommendation from Dan Clifford, Subdivision Inspector that the
bond amount for the Pheasant Hollow subdivision be set at $39,400.
The road and sidewalks must be at binder course, the granite
curbing installed, and street lights and fire alarms installed
before surety is posted.
MOTION: To accept the amount of $39,400 to guaranty completion of
the Pheasant Hollow subdivision. However, the road and
sidewalks must be at binder course, the granite curbing
installed, and street lights and fire alarms installed
before surety is posted.
(Cadden - Quinn) All in favor. PASSES.
Letter from Lori K. White, Secretary to Maria T. O'Connell, Wynn &
Wynn, P.C., requesting the Planning Board sign a Form J for Lots
on York Road
MOTION_ To sign the Form J.
(Cadden- Quinn) All in favor. PASSES.
Request from Herb Fuller to extend the deadline date for Piasecki
Farm gravel removal permit
MOTION: To deny the request and send a letter to Mr. Fuller asking
him to meet with the Planning Board to discuss the reason
for the delay.
(Annino - Quinn) (4 -1 -1) Planner Caponigro Opposed.
Chairman Madan Abstained. PASSES.
Letter from David E. Newton, President, MediGen; to Susan Tierney,
Secretary, Executive Office of Environmental Affairs
Letter to Susan Tierney, Secretary, Executive Office of
Environmental Affairs, from Scott Leite, Mansfield Health Agent
Letter from William Williams, Town Manager, to William Madan,
Letter to Bert Cook from William Morton regarding the Mansfield
Fish and Game
Letter from Barbara Hyland to William Williams
Letter to Dan Clifford, Subdivision Inspector, from the
Mansfield
Planning Board
Tara Estates Notice of Dismissal
Receipt of a passbook for Katherine Court from the Town
Treasurer
and Form J Release for Katherine Court
MOTION: To sign the release.
(Cadden- Quinn) (6 -0 -1) Chairman Madan Abstains.
PASSES.
Rehoboth Legal Notice
Mansfield Conservation Commission Hearing Notice
APA - Candidates for APA Board and President
Ad for Booklet: Burning Garbage in the U.S.: Practice
vs. State
of the Art
EOCD - Notice of Funds Availability
The Beacon
APA bulletin Board
Housing Partnership Network
NE Economic Indicators
MAPD Annual Meeting Notice
Building Construction for May
Letter from EOCD re: Municipal Incentive Grant Program.
The dedication of the Lincoln House
JTPG Cookout June 3 at 6 P.M.
Attleboro Hearing Notice
Rehoboth 'ZBA Statement of Facts
Bruce Campbell and Associates Newsletter
Corrected Rehoboth ZBA Statement of Facts
Public Management Magazine
Ad: The urban Land Institute
Planning Journal
SRPEDD Annual Meeting
No. Attleboro ZBA Hearing Notice
Lincoln Institute of Land Policv Publications
- JTPG Meeting Notice
Foxboro Hearing Notice
Easton Hearing Notice
Self Discipline & Emotional Control - One Day Seminar
Landscope
13. Around the Table
Upon the request of Mayfair Development, Chairman Madan asked the
Planning Board if a public hearing would be required to eliminate
one sidewalk in the Tara Estates Extension subdivision or if it
would be considered a field modification.