May 29,2013 RECEIVED
CLERKS OFFICE
Present: George Dentino; Chairman, Olivier Kozlowski; Vice Chairman, Jess Apt2tz l § P
Doug Annino;Kevin Moran;William Ross,Town Manager; Gary Babin,Director. Minutes taken 4.: LI
by:Tracey Whelan
MANSFIELD
,SETTS
Chairman Dentino called the meeting to order and stated that the meeting is being broadcast live
on Mansfield Cable Access and this broadcast will be available at various times for viewing.
None
s _k .-TT j, s ii s rt Gsli s 5,`11'11 1J i�5 ATat rt g 3 a fin y...
Motion: To approve the MMED minutes from October 17, 2012 (Kozlowski/Aptowitz)
Discussion: Gary Babin, Director of the Mansfield Municipal Electric Department, noted the
reason for the October 17th minutes coming before the Board at this time was due to Mr. Dentino
asking for elaboration on a few issues. PASSES 5:0
Motion: To approve the MMED minutes from March 25, 2013 (Aptowitz/Kozlowski)PASSES
5:0
1D`ii
Mardi Financials-Mr.Babin gave an overview of the FY13 financial results for the nine month
period through March 2013. Mr.Babin stated that net income of the department was $1.9 million
with operating cash of$9.35 million and that the Generation Charge was stable with a payable of
less than $100,000. Mr. Babin reported that energy sales are up 1.7% for the year, which is a
positive sign.
Mr. Babin followed up on a concern raised by Mr. Moran at the last Board meeting about the
decline in HT sales. Director Babin stated there are five commercial customers in this grouping:
Toyota, Smurfit-Stone, Murata, Reit Management and Atlantic Realty. These customers take
service at 13,800 volts and are metered at that level. The customers own and maintain all their
high voltage equipment on the customer side of the meter, which results in a bulk discount. In
researching the HT sales decline, which was about 32% through January compared to the prior
year, Director Babin stated that Reit Management had sold one of its three buildings in the high
voltage loop (located at 100 Hampshire) to Covidien, which then took service directly from
MMED as a standard commercial customer(LT). Mr.Babin pointed to the March 2013 financials,
which when HT and LT sales were added together showed that total sales were about the same as
the prior year.
Light Commissioner's Meeting May 29,2013
Page 1 of 4
Mr. Babin also reported that Smurfit-Stone (Rock-Tenn) is going out of business. In 2012 they
were the Town's 3rd largest customer and MMED sold them about 4 million kWh. Their
consumption has been consistent through January 2013 but has been steadily decreasing since
then. Mr.Babin's understanding was that they would be closed by the end of the summer.
Mr. Aptowitz inquired about the distribution expense, considering each line item is over budget.
Mr. Babin stated that the most significant factor is that MMED is now accounting for OPEB in
their labor costs. As far as other increases in costs, Mr. Babin also reported that the streetlight
re-lighting program cost about $40,000 in labor and about $28,000 in equipment and that the
department has also been more aggressive with tree trimming due to the amount of storms. Mr.
Moran noted that sales are tracking slightly behind budget. Mr. Babin stated that the economic
downturn,weather related issues and the loss of ADM are contributing factors but residential sales
and small commercial sales are up and making the difference. Mr.Annino asked if Smurfit-Stone
owed any monies to the Town. Mr.Babin reported that MMED did lose money due to bankruptcy
Taws when the company filed for Chapter 11 in 2009 but after that the payment stream was
excellent. Mr. Aptowitz asked when the write-off took place and Mr. Babin indicated he would
check on the amount and the date the amount was written off.
Copeland Road Underground Construction Project Mr. Babin provided a progress report
regarding the Copeland Road Underground Conduit project,which is a paper street that runs from
Maple Street.to West Street in a north-south direction. The purpose of building the duct line is to
interconnect the Bird Road substation to the Gilbert Street substation, and to do that several cable
circuits will need to be installed. This will allow the entire Town to be serviced by two substations.
Several steps have been taken by MMED to move the process along: In 2012 Town Meeting
authorized the Town to acquire the property rights needed to construct the right of way; a
walk-through with Conservation Commission, DPW and Town Manager was done;the route was
surveyed and that identified all the parcels and then those parcels were marked; the Conservation
Commission agent and MMED Engineer flagged the wetlands; and Town Counsel prepared a set
of easement documents, which were distributed to all abutters (8 parties) and MMED met
individually with most of them.
One executed easement has been returned and approved by the Board. Mr.Ross noted the Town is
working with the property owners in the area and will spend more time with a few; in particular the
Roman Catholic Diocese because St. Mary's church did not have direct ownership. Mr. Ross
stated that while walking through the area one of the concerns was whether the duct line could be
physically constructed given the routing limitations. A contractor walked the route and concluded
that it is buildable. Mr. Ross felt that Lou Ross from Town Counsel has been extremely
knowledgeable and has guided the Town through the process. Mr. Ross felt Copeland Road is the
viable option and less intrusive then other options. Mr. Babin noted the Town is trying to
minimize the impact of constructing on East Street since it had recently been fully reconstructed.
NextEra Contract - Mr. Babin presented a snapshot view for the value of the recently signed
NextEra contract relative to current market rates for power purchases. This is the energy contract
that the Board authorized the Town Manager to execute in January 2013. Mr.Babin reported that
periodically MMED looks at the value of the contract relative to what it would cost to replace the
power today. The total value of the contract is a fixed price of$12.5 million and the cost to replace
that today would be $1.3 million higher, which is about 8%.
Light Commissioner's Meeting May 29,2013
Page 2 of 4
Mr. Aptowitz asked about the new construction across from Mansfield Crossing and do
installations of this type replace the loss of Smurfit-Stone sales. Mr.Babin felt small commercial
development does not really make much of an impact and that a large company is needed to offset
the loss of sales. Mr. Babin felt that large commercial loads in the Cabot industrial park area are
what will offset loss of sales.
Mr.Ross noted the continued emphasis on conservation efforts and that replacing equipment with
more energy efficient items seems to be the trend and had an adverse impact on sales. He stated
that the challenge for utilities is to support the large fixed cost of plant facilities in the face of
declining sales. His observation was that a reverse situation occurs because energy conservation
reduces the consumption by customers but it becomes harder to reduce the cost of actually
operating and maintaining the utility at the same rate.
Bird Road Substation Final Cost Summary - Mr. Babin wanted to bring closure to the Bird
Road Substation and provided a final summary of construction costs for the project. He reported
the projected final cost to be $6.597 million and that MMED is withholding $25,000 for
completion of landscaping. MMED has been engaged in discussions with the contractor, Ryan
Company,who reported their sub-contractor has not been responsive to the fact that the initial
hydro-seeding did not take.
Mr.Babin reviewed the Change Order summary and told the Board that the staff had done a very
good job in managing the project. The initial contract with Ryan Company for construction of the
substation was$1.94 million and that the change order total for the project was$88,639. He noted
that most of the change orders were due to unit price items, such as boulder removal and tree
cutting that could not be anticipated. Taking these into account,the sum total of the change orders
due to changes in scope was only 1.7% of the final cost. He said that the biggest cost item for
changes in scope was for construction being slowed by delays in the transformer delivery but that
MMED had the transformer company split the cost of the change order with the Town. This
reduced the final cost impact to MMED of the change orders due to changes in scope to 1.1%.
Mr.Annino noted that the amount of change orders were good and asked about the credit the Town
was due for the staining of the perimeter wall. Mr. Babin noted that the final change order took
this and several other items into account to settle the final cost of the project. He named several
items that were involved with the reconciliation of the final change order. Mr.Moran asked about
the hydro seeding and asked if it isn't too late to do it. Mr. Babin stated that there is a one year
warranty on all landscaping work and that he was told it would be done by the end of the week.
Mr. Aptowitz inquired about the original cost of the entire project at the outset of planning. Mr.
Babin reported initial estimates were about$8 million and now the project cost was down to the
$6.7 million price. Mr. Ross noted that the biggest factor that brought the price down was the
transformer bid, which produced significant savings. Chairman Dentino inquired about the
boulder removal change orders and if the size of the boulders was measured,which Mr.Babin said
they were. Mr. Babin reported that the boulders were broken up on site and then they were
removed. He noted the site was extremely rocky and that most of the boulders were subsurface,
which necessitated the unit price method. Chairman Dentino was concerned about the cost
charged for that removal and the length of time it took,which was approximately six months. Mr.
Babin noted that as the boulders were removed they were stock piled and as time allowed then
broken up.
Light Commissioner's Meeting May 29,2013
Page 3 of 4
CPR Training -As a follow up item from a prior Board meeting where the question of whether
the Fire Department provided CPR training that MMED had contracted out, Mr. Babin reported
that MMED had used Life Support Systems,which handled all of MMED's CPR and AED needs.
Mr.Babin also spoke with Deputy Chief Puleo who noted that the Fire Department is not staffed o
do the CPR training and lacked some of the materials that are required to be distributed. In order
for the Fire Department to complete the training it would be necessary to have someone come in at
an overtime cost. Deputy Puleo suggested they would do it as a courtesy but do not market those
types of services and felt that MMED made the right call in going with the vendor. Further
clarifying, Mr. Babin noted the charge was $850 for two sessions, as opposed to the cost for one
session that he had said earlier. Mr.Dentino mentioned a$2,000 figure he had seen on an invoice,
which Mr.Babin said was for 8 AED rentals with semi-annual service for a total bill of$2,300.
Chairman Dentino felt a CPR training session is a positive for the Town and asked Mr. Ross to
follow up and find out what was done in the past.
tfi k ft 90f9:! ,0411116`WI(001(t,
Chairman Dentino noted there is a significant amount of engineering bills associated with the Bird
Road project and he would like Mr.Babin and Mr.Ross to provide a list of projects that MMED is
working on that require engineering. Both Mr.Babin and Mr.Ross will provide that information.
Mr.Kozlowski noted that each time the substation discussion comes up he wonders if it is feasible
to install underground conduit along the railroad right of way. Mr. Ross stated it is difficult to
work with AMTRAK and the MBTA for simply getting an aerial crossing and suspected strongly
that they would not want additional lines in that area, mainly due to their overhead catenary
structures. Mr. Moran is concerned about giving any control to the MBTA for our electric
facilities and the timing in their response.Mr.Babin mentioned a few instances of the difficulty of
getting AMTRAK to respond to simple requests.
G�i3 F kFi '�Ts"ria l ab (� { X10 .
1z �ti? j Q� 4� AWi����a��:uir as 6 1 w'I6 r F t [ii iJ6i it'
None
,0411,-- i i s ila i
Motion: To adjourn the MMED Light Commissioner's meeti g 8:03 PM PASSES 5:0