Loading...
HomeMy WebLinkAboutmin conservation com 07/10/00 . , r- TOWN ~fCE/VED ..ERKS OFFIC!faDSfield Conservation Commission 00 DEe - 6 PM 3: Z 5 Minutes of July 10, 2000 Presen\'1A. NSrP'" ()ttavIui, CIIoirmaD; Carol MattMw. Paul Boydea, Jack SmItb, MA SSAC.S oad ])iaae Ready'; Dlek LewIs, Eoviro.....Dt8I & CO....rvatIoD Meeting called to order at 7:40 PM 1. Request for Partial Certificate - SE 211-311, Lot 24A, Sturbridge Estates; Motion Boyden/Smith to issue; voted 4-0-0. [B. Bean arrives] 2. Request for Partial Certificate - SE 211-591, Lots 1-4, 15-20,25-26,31-33, & 35, Woodland Park; Motion BoydenlMatthew to issues; voted 4-0-1 [Smith Abstains] 3. 7:45 Bearing, Notice oUntent for Reservoir Place, LLC Gerard Savard, Abbott Investments [Applicant], and Tom Houston and Chelsea Hanbridge, CID Engineering. presented the project. Project site includes several wetland resource areas [BVW, Bank, LUW, Riverfront, lOO-year flood zone]. The plans show compliance with 25-foot no disturb area adjacent to wetland boundary. Access is off of Reservoir Rd. with a second access being proposed off of old gravel roadway. The stormwater system is a closed infiltration with discharge into a small retention basin that will be created as an amenity to the project site. [*Diane Ready arrives]. C. Matthew states that the local by-law allows the Commission the discretion to require a 50-foot no disturb zone. Project engineer states that drywalls will be installed for roof and driveway run- off. General question raised about lawn areas. T. Houston states that lawns could be reduced in size, relocated, and removed if they are problematic. C. Matthew asks about proposed work in the 200-foot Riverfront area. The engineer states that the wetland boundary is pretty consistent with the edge of water and the bank area. A question is raised if the Town of Norton was notified. The project team will investigate this. A Site walk is scheduled for 7/29/00 at 8:00 am. Motion [Matthew/Smith] to continue the hearing until 8/14/00 at8:00 p.m.; Voted 6-0-0. r 4. Discussion with Mike Acheron concerning the Route 106 Sewer Project. A letter dated 7/10/00 from Penney Engineering regarding the necessary work involved with the installation of the pump station near the highway garage. Because of some contamination [coming from the fuel tank area at the rear of the garage] found when work was starting on the installation of the pump station the Town is seeking a modification to the Order of Conditions. The proposal is to install several tanks that will be used to cleanse the ground water that is pumped out of the newly installed wells. The clean water will then be discharged to an area off of the roadway that leads to the Fish & Game Club. The discharge will be positioned so that erosion is controlled. Motion [BeanlMatthew] to amend the Order to allow this work to proceed. Voted 6-0-0 r - 5. Partial Certitkate of Compliance for SE 111-606, Lot 3, Bird Rd. D. Lewis has done a walk through and sees no problem. Motion [SmithIBean] to issues; Voted 6-0-0. 6. Request for Partial Certificates for Lot 4, Homefield Drive SE 211-560 (the subdivision Order] and 211-597 [which is superceded by a final Order from DEP) D. Lewis explained that the 211-597 Order was recorded with the Registry after the Order had been appealed to DEP. The Commission's original Order should not have been recorded. C. Matthew raised question about the vernal pool identification signs not being in place and the roadway work is not yet done. After some lengthy discussion, no motion was made and request will be taken up at future meeting. 7. Motion [BoydenlSmith]to adjourn; Voted 6-0-0. 8. Commissioner Matthew asked about the Circuit Rider Program at DEP. D. Lewis will contact this office in LakeviIIe to discuss issues and scheduling with D. FouIis or D. Hil~ the Circuit Riders for the SERO. Motion [Ready/Smith] to adjourn at 8:20 PM. Voted 5-0-0. Approved October 30, 2000 ~L r ,-.. .. .