r- Planning Board Minutes
September 22, 2004
Present: Tom French, Chair; Fred Armstrong, Clerk; Doug Annino, Ken Torman,
Walter Jenkins, John DeMassi, Frank Holmes
Shaun P. Burke, Director ofP . and Develo ment
Motion: To sign the special permit decision for Suzanne Estates
(Torman-Armstrong) Five in favor. Annino, Holmes abstained. PASSES
Richard Hollworth, ESS Group, explained the presentation would address the outstanding
items regarding aesthetics, parking relief and infrastructure. He provided the board with
copies of photographs including views along School Street and Route 140, photos of
anchor stores from other developments and a description of an architectural review
process which they have used in other towns.
Mr. Hollworth introduced John Ruffo, architect and Mark Flanery, landscape architect
Mr. Ruffo explained the architect's renderings of the site, which include features such as
wood details and awnings on the buildings, and stone walls. The School Street entrance
to the site includes a berm and landscaping which are intended to act as a buffer.
r-
Mr. Flanery explained the landscaping plan for the entrance, the loading/service area at
School Street, the pond area and the area along Route 140. He said there will be a
serpentine stone wall along the outside of the street edge, which will curve into the
property. There will be flowering trees along the entrance and street trees and flowering
trees inside the site, as well as plantings along the stone wall. The loading area will have
a ten-foot high earthen berm with evergreens and flowering shrubbery, as well as a
stockade fence. The entrance driveway will be curve linear, with the berm at different
heights on either side. They would like to put additional plantings in the buffer zone,
outside of their property line.
Mr. Flanery explained there will be a utility easement required along Route 140, which
has changed their original plan; they will plant shrubs under the existing vegetation with
large shade trees inside the site and smaller flowering trees within the parking areas.
Mr. Flanery explained the pond area, which calls for edge treatment using native plant
materials, including weeping willows. At the points where the pond will connect with the
buildings, they will use birch trees, along with stone surfaces and benches.
Mr. Hollworth explained a plan showing the parking areas and parking ratios. He said
the board had asked for an explanation of the parking for the whole site, as well as for the
individual buildings. He said they feel a reduction in parking would preserve open space,
r- reduce runoff and be reflective ofthe parking demand for the site. He said the retail
parking requirement is five spaces per 1000 square feet, the hotel requires one space per
r- room, and the restaurant requires one space per four seats. The shaded plan shows where
they comply with parking and the areas where they have requested relief. He said the
parking for the hotel complies with the Zoning By-Law. He said they anticipate the
restaurant and retail uses sharing parking because of different peak hour demands. He
said each restaurant will have around 300 seats and would need 75 parking spaces each.
He said the employee parking needs have been integrated into the site. Mr. Hollworth
said the parking area is based on gross floor area, as are the Zoning By-Law
requirements, which he said is somewhat representative of the gross leasable area. He
said their parking ratios are conservative.
Mr. Hollworth explained other areas on the site where parking could be provided if
demand proves to be higher than they anticipate. He presented a plan showing two
possible areas, but said they are not ideal places for parking because of their proximity to
wetlands; one shows 256 spaces and the other shows 60 spaces. He said the largest
parking field has some landscaping which could be eliminated or consolidated, and could
yield another 60 spaces.
Mr. Hollworth explained a plan showing the open space area, which could be used for
snow storage. He said depending on the snowfall and the season, snow may be trucked
off site; if it is a busy time, they would not lose parking for snow storage. There are
approximately 1.5 acres of snow storage within the site, and with a snowfall of more than
six inches, snow would be trucked off site.
:-
Board Comment
Mr. DeMassi said the presentation has given the board a better understanding of the plan
for the pond, but would like to see landscaping plans. He said the view from School
Street is still of the back ofa building, and he is concerned about the view in the winter.
Mr. Hollworth said there is a dense row of vegetation along the existing corridor, which
they intend to preserve. He said the architectural treatments could be wrapped around the
back of the building, and drivers on School Street will not see the entire building from the
road because of the trees and berm.
Mr. DeMassi asked about the hotel's employee parking; Mr. Hollworth said if the hotel is
completely occupied~ there would be four employee parking spaces. There is no
employee parking specifically shown for the hotel. Mr. DeMassi asked why the site isn't
being built to the size for which they can provide parking. He said patrons having to
cross the internal drives from far-flung parking areas during peak hours could be
dangerous.
Mr. DeMassi asked about lighting and security for the parking areas behind the buildings.
He suggested some type of communication device for people parked in those areas to
contact the police or mall security.
r-
Mr. DeMassi said he would like to see a snow removal plan as part of the application;
Mr. Hollworth said that could be made part of an operations plan.
.r- Mr. Jenkins asked about the architectural renderings. Mr. Ruffo said the images
presented show what they have done so far, but as the hearings go forward they will
further explore the architectural details. Mr. Masiello said he had submitted language for
an architectural review process.
Mr. Jenkins asked about plans for the pond. Mr. Hollworth said they are proposing a
four-foot high fence, which Mr. Masiello said would not be a security fence. Mr. Jenkins
said the natural vegetation will be an inhibitor to people getting close to the pond for
most ofthe year, but is concerned about access to the pond during the winter.
Mr. Jenkins asked about the changes to the strip of buildings to the north ofthe pond.
Mr. Masiello said they had been unsure about the location of two restaurant pads, which
have now been incorporated into this strip. He said there had been a concern that there
would not be enough parking for the restaurants originally shown along School Street, so
one has been moved to the small strip north of the pond. He said he anticipates one of the
restaurants in that strip to have lunch, rather than dinner, service.
Mr. Masiello said they have signed Kohl's department stores as one of their anchor
tenants. He said they are likely to sign TOI Friday's and Applebee's, which both have
fewer than 300 seats.
~
Mr. Jenkins said the Mass Highway parcel shown on the upper left ofthe plan would be a
good area for overflow parking and asked if some type of agreement could be worked
out. Mr. Masiello said he thought Mass Highway would probably consider that surplus
land, but said the process for him to buy or lease that land would take years.
Mr. Jenkins asked if they have met with the ZBA; Mr. Masiello said he has requested the
ZBA hearing be continued until the Planning Board decides on its recommendation on
the parking variance.
Mr. Annino said the architectural plans could be done in a preliminary manner so the
board could have something to see, then when the tenants are signed, the individual
building plans could be adjusted. He asked to see all the elevations, saying he would not
be comfortable voting without them. Mr. Masiello said he would not be able to produce
factual representations because of the tenant variations. He said he was optimistic he
would be able to come back under architectural review with plans the board would want
to approve. Mr. Annino said he would have to see elevations before voting and he does
not want to see typical big box-style architecture on this site. Mr. Masiello said he has
been able to design big box retail stores on other sites to fit into the development.
Mr. Annino said he would like to see the entrance sign, the back side of the restaurant
closest to School Street and the loading dock at the back of the large retail pad backing
onto School Street. He said the landscaping should accentuate, not hide, the buildings.
r-
Mr. Annino asked about building heights; Mr. Masiello said the anchors are 30-34 feet
,- high and the smaller stores are 25-27 feet high.
Mr. Annino asked about the view from the pond to the backside of the long building; Mr.
Hollworth said there will be no loading at that location and the architectural features will
be wrapped around the building.
Mr. DeMassi asked how large Kohl's will be; Mr. Hollworth said it would be 95,000
square feet, including loading facilities, entryway and a mezzanine.
Mr. Annino asked about site sections; Mr. Hollworth said they are working on those and
will bring them to the next meeting. He said those plans show that the existing
embankment on the Route 495 side of the site will provide significant screening. He said
the existing vegetation along Route 140 will remain, with additional plantings added.
Mr. Armstrong asked about the small stores shown at the front of the large pad at the
back ofthe site; Mr. Masiello said they would be similar to the small retailers at the front
of the site. Mr. Armstrong said there should be individual stores there to break up the
large ~ade.
Mr. Armstrong asked about the screening in the lower right corner along School Street;
Mr. Masiello said they do not own the property shown before the entrance. Mr.
Armstrong said it was unlikely, but the Commonwealth could clear cut that parcel.
r-
Mr. Armstrong noted an article about the Derby Street site in Hingham and asked about
the parking issues that development has had. Mr. Masiello said he did not work on that
project, but he would find out what happened. Mr. Armstrong said this site may not
require all the parking required by the Zoning By-Law, buthe would have to have
confidence in the developer's calculations before he could vote.
Mr. Holmes asked about hte landscaping around the pond and whether there would be a
no-touch zone to protect the wetlands. Mr. Hollworth said there will be a 25-foot no
disturb zone, and the entire pond edge has been previously disturbed. The proposed
plantings are intended to provide diversity, but they will need permission from the
Conservation Commission before planting additional species. He said the Notice of
Intent states they intend to replant native species and remove invasive species.
Mr. Holmes asked if there has been discussion with Mass Electric about the easement
along Route 140. Mr. Hollworth explained they have worked with the utility to offset the
easement onto the parking area, allowing them to provide an undisturbed buffer along
Route 140. Mr. Holmes asked if the required 50-foot landscape buffer would be on their
property; Mr. Hollworth said 20 feet of the buffer would be within the utility easement.
He said there is no impervious surface within that area.
,-
Mr. Holmes said the parking shown at the back of the largest store is not practical and
may not be safe. He said there is no sidewalk shown near those spaces and the roadway
is directly adjacent to both the parking and the back of the store. He said he was
r- concerned about parking being provided across driveways from the stores, which may be
dangerous. Mr. Hollworth said they have used crosswalks and landscaping to designate
pedestrian access areas.
Mr. Holmes said the snow storage plan seems to be within the landscaped areas and
asked what effect that would have on plantings. Mr. Hollworth said trees are required to
be set back four feet, so the front of the islands could be used for storage. He said the 10-
foot wide islands planned for this development would not be able to accommodate large-
scale snow storage. He said depending on the severity of the winter, the snow would
have to be trucked off regularly.
Mr. Burke asked what would happen to the site if the required parking is provided. Mr.
Hollworth said there would be less building but more parking, so the overall impact to the
site would be about the same. Mr. Masiello said the additional parking would have to be
developed in areas they now propose to leave as open space. Mr. DeMassi said the
developer seems to be chosing not to develop the site appropriately for the amount
parking it can accommodate. Mr. Hollworth said Mansfield's Zoning By-Law requires
much more parking than they expect to need.
Mr. Burke asked about the effect ofthe easement over Route 495. Mr. Hollworth said
there is a wetland area along the Route 495 ramp and the poles would be within the
hotel's parking area.
.~
Mr. Burke said a resident had been concerned about the Kohl's loading dock nearest
Cobbler Road. Mr. Hollworth said the building has been shifted as far as possible,
resulting in an additional20-foot buffer, which would encroach further into the wetland
area. He said they have tried to maintain the 25- foot buffer in areas with more mature
vegetation.
Mr. Burke asked about the possibility of relocating the loading dock at the back of the
structure along School Street. Mr. Masiello said they attempted to screen the loading
dock, but would work additionally on that issue.
Mr. French asked if the plans presented this evening are the current set; Mr. Hollworth
said they are. Mr. French asked about the parking schedule and how many spaces are
provided; Mr. Hollworth said there are 1,966 total spaces provided. He said there are 375
parking spaces provided for the 1,500 proposed restaurant seats and 100 for the hotel. He
said they estimated 250 employees for the whole center and have included employee
parking within the spaces provided.
,-
Mr. DeMassi said there are two huge buildings shown that, if done differently, would
improve the plan. He asked if there is any intention to make those large pads into smaller
spaces and if the development could be buili without those stores being so large. Mr.
Masiello said he didn't believe it could be, because it needs to have anchors other than
Kohl's. Mr. DeMassi said those two large boxes next to one another make the whole
plan unattractive, and was also concerned that those two boxes may be combined into one
( huge box. Mr. Masiello showed the board slides of large box-type stores they have done
in other facilities with architectural details to connect them with the style of the specific
development. Mr. DeMassi said he would rather see several smaller stores than one large
store. Mr. Masiello said he understood the concern, and said there will be portions of this
site that will be small stores, but there will be some larger stores like Kohl's and possibly
a large bookstore. Mr. Annino asked if the facades of the large stores could be broken
down to simulate smaller stores.
Pub6c Comment
Gary DeCosta, representing local union carpenters, said parking appears to be a problem.
He said the development appears to be too dense for the site, and said a variance would
still be required even if the additional parking were constructed. He said the additional
parking would add an additional curb cut on School Street. He presented a photograph of
School Street and a photograph of the back of the development in Smithfield. He said the
developer shouldn't rely on landscaping off their property to provide the required buffer.
Kevin Gartland, 145 School Street, said the developer doesn't want to comply with the
town's standards and is requesting relief based on other town's standards. He said he has
not heard the specific number of parking spaces for which relief is being requested and
said with big box stores, there is never enough parking. He said he is concerned about
cars backing up onto School Street during peak shopping times.
~
Madison Smith, 160 Chauncy Street, asked about the two large stores being combined
into one store and if there would be a way to prevent that. Mr. Burke said the special
permit could be written to specify the number of retail spaces and the size of each, and a
new public hearing and special permit would be required for any changes. He noted the
board specified the number and size of stores in the Erin's Centre special permit.
Kara Lynch, representing Mansfield Citizens to Save the Land, introduced Fayssal
Husseini, a consultant from Edwards and Kelcey, who has done a study of the
developer's parking calculations. Mr. Husseini's study used ITE numbers and generated
data suggesting 2,900 spaces would be needed. Ms. Lynch said she was concerned about
snow storage and about people circling the site looking for parking spaces. Mr. Husseini
explained the ITE parking generation handbook uses 1.21 spaces per hotel room. Mr.
French asked if ITE differentiates between a standard hotel and an extended stay hotel;
Mr. Husseini said the standard in ITE is for a "convention hotel." Mr. French said the
board would have to look at this information and suggested Mr. Masiello do the same.
Mr. DeMassi asked if the hotel would have meeting rooms; Mr. Masiello said it would.
Mr. DeMassi asked what the parking requirement would be for that use. Mr. Masiello
said the entire hotel parking was treated on a per-room basis and said there is no
restaurant proposed for the hotel. Mr. Hollworth said they are not requesting relief from
the parking requirements for the hotel and said he would provide the board with
additional data.
(
Mr. Gartland asked about the 50-foot buffer for the easement on School Street and said
~ the area under the easement is being proposed to be clear cut; he said the ZBA has said
that would require a variance. He said the hotel parking is being placed partially within
the buffer along Route 495, which is an indication that the development is too large.
Mr. Hollworth addressed outstanding comments about drainage, presenting a plan
showing an aerial photograph of wetland areas. He said the watershed area is bounded by
the railroad area across School Street, a portion of which drains to this site via two
culverts, into a small wetland system, over Nordbeck's rear yard and into another wetland
system that drains along Route 140. He said the other part of this site has an intermittent
stream, which goes around the pond and to a wetland system There is a closed drainage
system discharging to a ditch along the existing driveway. There is a series of ditches
running along Route 140 and 495, which were built during highway construction. The
existing culverts have the capacity to handle large, less frequent storms, but during
smaller, more frequent storms, they overflow. Mr. Hollworth said the intermittent stream
encroaches into some of the Cobbler Road properties.
Mr. French asked whether flow from the pond goes across Route 495; Mr. Hollworth said
it does not.
~
Mr. DeMassi asked about the stream; Mr. Hollworth said that would be maintained; the
road will be built over two existing culverts. He said there will be plantings between the
pond and the stream, but they will have to go to the Conservation Commission for that
activity.
Mr. Holmes asked about the drainage that goes to Willow Street; Mr. Hollworth said
there are existing structures in Willow Street.
Leonard Flynn, 102 Jewell Street, said there is an bridge across the Rumford River and
he is concerned about increased flow on that portion of the Great Woods. Mr. Hollworth
said there would be no increase in flow off site.
Mr. Hollworth presented a slide showing a lighting fixture detail that will minimize
lighting spill and provide safety in the parking lots; the poles would be 30 feet in the
parking area and 12-15 feet in the pedestrian areas. He presented a detail of a wall pack
that would be used on the buildings. He said he would be redrawing the lighting plan to
incorporate these changes.
Mr. Hollworth provided a list of other projects that have been discussed and their
locations.
Mr. Hollworth said there had been a question about cutting and filling; he said they may
have to import structural fill and materials such as loam, and would remove unsuitable
materials. He said they have done soil permeability tests and there will be some
challenges to activities like compaction.
.~.
Mr. Hollworth said the developer is willing to :fimd an independent peer review of the
r- traffic study. Mr. Masiello said he is comfortable with paying for that review and said he
would like to be involved in the contractual arrangements. Mr. Burke said a Scope of
Services would be prepared.
Mr. Holmes asked about the possibility of enclosing the Kohl's loading dock; Mr.
Hollworth said they are thinking about using a 70-foot screening wall at that location.
Mr. Masiello said it would be the same height as and longer than the building in order to
screen the trucks. He noted the building has been shifted 20 feet away from that lot line.
Mr. Hollworth said the wall would be sound absorbing.
Public Comment
Len Grimes, 10 Sean Drive, asked about the undeveloped areas for future parking and
asked if it could have buildings; Mr. Masiello said it could not without the board's
approval.
Kristine Mickey, 38 Cobbler Road, asked what kind of maintenance in the easement
behind her street would be done; Mr. Hollworth said that easement allows access to
maintain the drainage system in Cobbler Road. Mr. Burke said that easement is for the
town to maintain the drainage.
".--..
Mr. Burke said there are a handful of items remaining from the Outstanding Issues list,
including: tenants, signage, light department changes and upgrades, Mass Electric
response, cross-sections through the site, pump station details, revised drainage
calculations and test pit results.
Mr. Masiello said the only tenant they have signed at this time is Kohl's, and mentioned
Applebee's and TGI Friday's.
Mr. Hollworth explained they have not completed signage details but the plans show
signage locations, with one free-standing sign for each building. Mr. Burke said the
elevations should be submitted. Mr. Masiello said the anchor tenants, significantly sized
stores, and restaurants would be included on the signs, but all the stores would not be.
Mr. Hollworth said the approximate cost of infrastructure for electric will be $80,000.
He said the Mass Electric plans have been developed and include parking area overlap
with the easement to allow maintenance of vegetation along the edge. He said he has not
received a response from Mass Electric regarding their reason for not allowing the lines
to be installed underground.
Mr. Hollworth said they would provide cross sections for the next meeting.
Mr. Hollworth said they would include the pump station details on the revised plans.
Mr. Hollworth said they would be providing revised drainage calculations and test pit
results. Mr. French said the board would rely on Mr. Sullivan's review of these items.
,--
/"" Mr. Masiello said he had meet with Mass Highway, town staff and state representatives
regarding direct access to this site from Route 140. He said there is significant resistance
from Mass Highway, but felt the door was left open. Mass Highway has asked him to
develop the plans and do a feasibility analysis.
Mr. Masiello asked about the board's recommendation regarding his request for parking
relief. Mr. French said he did not feel prepared to vote on this tonight. Mr. Annino and
Mr. Armstrong agreed. Mr. French suggested having the independent traffic consultant
review the parking issue.
Mr. Grimes asked if the reduction in parking were granted, would other landowners be
allowed to do the same? Mr. French explained the board does not grant variances, but
only makes a recommendations to the ZBA. He said other landowners could apply for
variances.
Mr. Masiello said his traffic engineer would not be available on October 13 and asked for
traffic to be discussed on another night, and said he would be willing to discuss different
topic on October 13. The board discussed covering Community Impacts on that night.
Mr. French said that would be a very significant discussion; Mr. Masiello suggested
discussing Community Impacts on November 10.
.---
Motion: To continue the public hearing to October 20, 2004 at 7:00 p.rn.
(Annino-Armstrong) All in favor. PASSES
Motion: To adjourn at 10:15 p.rn. (Torman-Jenkins) All in favor. PASSES
Next meeting: October 6,2004 at 7:30 p.rn.