1. V. Boutas - Request for Determination of Applicability-continued hearing
Re: Land at the end of Jennifer Drive-review wetland boundary & access for test pits
No one was present to represent the applicant. General question raised with the flood plain
compensation that is located on the subject site. One of the abutters, Diane Coming, raises a
concern with the location of the wetland flagging in the area near the culverts that run under her
driveway. The flag # 2 as shown on the current plant does not match-up with the flag shown on
her as-built. She would like this to be checked. RIM Engineering will also be asked to show the
location of the existing pathway leading into the open field area. Motion [Smith/Bean] to
continue until November 19th at 7:45 p.m. All in favor.
2.
Bernice Reid - Notice of Intent Hearing
Re: 44 Oak Street, Construction of new house with grading and associated work
Bob Colleran, Hutchins-Trowbridge Associates, represented the applicant. He indicates that the
existing house and garage will be removed, and the new house shown on the plan built. Concerns
raised with the relationship of the limit of work to the proximity of the wetland boundary flagged.
D. Lewis has walked the site and he felt that the wetland line could be moved back several feet in
many areas. Several members of the Commission will try to walk the site next Saturday. The
engineer will re-flag the wetland and present a revised plan showing additional elevations.
Motion [Hanlon/Smith] to continue until 7:55 p.m. on November 19th. All in favor.
3. William Romero - Request for Determination of Applicability
Re: 115 York Rd.-installation of in-ground pool within buffer zone
Mr. and Mrs. Romero were present along with Tony Zagame, of Ferrari Pools. It was explained
that almost all of the work will be within the existing lawn area. Only a couple of small trees and
shrubs will be taken down to accommodate the limit of work line. The pool location may shift
slightly from what is shown on the plan, but will stay within the limit of work. The pool will
have a self-enclosed cartridge filter system with no backwash necessary. Discussion on having
the haybales wrap around the pool and having installation of haybales certified. Motion
[Hanlon/Smith] to close the hearing and issue a Negative Determination with the conditions
discussed included. All in Favor.
4.
Other Business
a. Question of the snow removal area for the Erin's Center on Rte 140 and West Street. D.
.
Lewis will look into this. It is believed that the Planning Board dealt with this in their Special
Permit.
b. Paper work on the Walsh Delineation was signed.
c. The Self-Help contracts for the Essex Street purchase were signed.
d. Correspondence on the recommended final Order for the Erin's Center project, and the
Superceding Order for the lot on Erick Rd. and Steams Ave. noted.
e. Discussion on the vernal pool certification for the Gilbert Street parcels. Natural Heritage
needs some additional photos, which will have to be shot in the spring. D. Lewis will contact
the consultant regarding the finishing up of the project next spring.
-
r
r
t: P. Boyden says he has spoken with Lester Epstein regarding the parcel in the Great Woods
that he owns with two other parties; he is willing to sell it for conservation purposes. How to
deal with the other owners will be explored.
g. Review and discussion of the Clemmey parcel on West Street that he wishes to donate to
Conservation as part of the approval package on the Erin's Center project. Motion
HanlonlBean] to accept the parcel as a donation.
By