r'resent: COmmissione.. Paul Boyden, Christine Flus, Shirley Hanlon, Carol ~~, ~Smith;
Dick Lewis, Environmental Planner 0 \ SEP
~ \, Us\: \t:.LO
Chairman P. Boyden called the meeting to order at 7:30 P.M., and he indicated that he w " I@ ~~1(L.i. the first
hearing for the Lakeview Ave. project. M fl. ""
1. Request for Determination of Applicability _ Town of Mansfield
Re: Drainage System Improvements to Lakeview Avenue.
John Sullivan, Town Engineer described the work as a proposed maintenance and improvement project
to the existing storm water system He indicated that flooding occurs on a regular basis since the
existing leaching system cannot handle flows, and freezing takes place in the winter creating a public
safety issue. High ground water and the fact that there is no outlet impact the existing system. The
proposed work will take place in the roadway and on a right-of-way between two houses. New catch
basins with sumps and an oiVwater separator will be installed. The existing storm water goes towards
the lake. The new system will have a discharge pipe to the lake with a riprap and outflow configuration
that will reduce velocity. The existing system creates erosion that runs into the lake and the new system
will reduce this. The proposed system will eliminate 50% of total suspended solids. Abutter Kevin
Boyden urges that some immediate repairs be done to the roadway since the conditions this past winter
have tom up the surface. Paul Boyden asks about the high water elevation. John Sullivan did check this
before the meeting and indicated that the outlet pipe could stop at the current high water mark, which is
probably at its highest level. Motion [Flass/Matthew] to close the hearing; Motion [Smith/Flass] to
issue a Negative Determination citing elevation of outlet at high water mark. Both Motions voted 4-0-0.
r
1.. Request for Determination of Applicability - Dean Miller,S Homefield Drive
Re: Minor clearing for the installation of a shed within 100 feet of a wetland resource area
Commission Matthew abstains from this hearing. Mr. Miller outlines the project. He has a limited yard
area is hoping to have the shed close to the driveway. Two large white pines and some limited small
shrubs will have to be removed. There will be minimal excavation for the footings. Discussion of a
proposed condition that building permit papers be submitted to the Commission office and that footing
no larger than 12-inch sauna tubes be used. Motion [Hanlon/Flass] to close the hearing; voted 4-0-1.
Motion [Hanlon/Flass] to issue a Negative Determination with the conditions discussed; voted 4-0-1.
3. Request for Determination of Applicability -Mass. Highway Dept.
Re: Re-construction of Central Street and Copeland Drive
Tom McGuire, Mass. Highway, District 5 Engineer, presented the plans, which involves the grinding
and re-paving of the roadways. lfany concrete areas are encountered, then any joints will be routed,
sealed and filled. Haybales will be place adjacent to Robinson Brook. Motions [HanlonFlass] to close
the hearings and issue a Negative Determination as discussed; voted 5-0-0
4. Request for Determination of Applicability - Paul DeMartino, 16 Shady Brook Lane
Mr. and Mrs. DeMartino were present to outline the project, which is the installation on an in-ground
pool. Work is approximately 80 feet from the wetland, and the pool will have a self-contained back
wash system. S. Hanlon noted that her inspection showed that the area near the play structure needs
some haybales. Most of the yard area has already been graded in anticipation of new seed being planted.
r Motions [Hanlon/Smith] to close the hearing and issue a Negative Determination, # 3, with condition on
haybales being installed; voted 5-0-0.
, T
r'
r
7.
r
5.
Notiee of Intent hearing - Canoe River Campground, Mill Street
Engineer Ralph Maloon and owner Joe Gonsalves presented the plans. Project involves 1.86 miles of
sewer lines, which may be buih in two phases. The shorter phase will connect to the line in Mill St. near
the entrance to the campground. The second phase will serve the majority of the mcility and will go to a
pump station that will run out to Mill St on the north side of the Canoe River bridge. The installation of
the sewer will help with water quality and solve the problem of an old septic system at the campground.
The connections to the individual trailers will be made with a tight fitting approved by the state. The
project will also be reviewed and approved by the Town. The sewer line that runs under the secondary
outlet to the pond, can be done under dry conditions as the flow of water can be controlled by boards.
Motion (HanIonIFlassJ to continue the hearing until 7:45 p.rn. on June 4th, with a site walk on June 2 at
8:30 a.m.; voted 4-0-1 [Smith Abstains]. _
6.
Notice olInteDt hearing - Home Depot, West St and Route 140
Jack Mette, App1edore Engineering, and Mickey Marcus, New England Environmental presented the
plans. Brian Leahy, representing the landowner, also present. Project involves construction of several
building and associated parking for around 1300 cars. There are two bvw areas near Route 140, and an
isolated area just off the site. This isolated area is presently the subject of an adjudicatory appeal. No
wetland alteration is proposed. No work proposed within 50 feet of any resource area with the exception
of the removal of existing pavement and some invasive plants, and the planting of native species which
will improve the wildlife habitat features. The applicant is looking for the Commission to approve this
work within the 50-foot zone. There is no true stonnwater management system in place. The proposed
system will meet or exceed all DEP policies and practices. All catch basins will have deep sumps, with
water quality swales. These swales will have a plastic turf re-enforcement barrier that allows grasses to
grow through them This helps to prevent eroding of the swales over time. Pre and Post development
flows are balanced. A maintenance program for the basins, swales, parking areas, etc, will be in place
and is outlined in the NO!. Snow storage areas are identified. The shape of Basin # 3 [around 2 acres in
size J may change due to just received information on soil conditions. A revised plan will be presented at
the next hearing. Abutter Bob Jones, Walnut Street, voiced concerns with some of the historical
activities on the site that have impacted his property. A swath was cut near the rear of the proposed
basin # 3, and he is worried with water weeping from the basin onto his land. Also indicates that past
work on the site has backed water onto his land, which in turn helped enlarge this isolated area.
Attorney Bill O'Connell, representing the abutter Royal Oak Trust, outlined the ongoing appeal on the
question of the nature of this isolated area and whether it is in fact a bvw. Mentioned that the EIR is
supposed to address the questions of the filling of ponds on the site years ago. He ask the Commission
continue the hearing so that the EIR can be reviewed and considered. In response to these comments the
applicant's representatives state that corrective action nears Mr. Jones' land will be performed to prevent
any negative impacts. And, they state that the ENF and EIR process is separate and not part of this
Notice review. [Commissioner Flass leaves the meeting]. Motion [Matthew/SmithJ to continue the
hearing until June 4 at 8: 15 p.m when a revised plan for Basin # 3 will be presented; voted 3-0-1
[Hanlon abstains J.
Request for Determination of Applicability - Miehael Trowbridg~ South Main Street
Motion [Matthew/SmithJ to continue the hearing until 8:45 on June 4 ,with a site walk at 8:00 am on
June 2ad. All in Favor.
2
I 1
8. Other Business:
a Commission endorsed the application for the Self-Help program for the Essex St, acquisition.
r b. Commission voted on Motions to issue Certificates for SE 211-592 [Stillbrook Estates], 211-212,
Concetta Drive, and 211-589 [Lot 2 Mary Dee Lane]
c. Commission reviewed the plan for the improvements to the track behind the High School. Approval
for this under the existing Order was given.
d. Commission approved the issuance of letter of support for the Norton Conservation Commission's
Self-Help application A request will be made to have Norton send a letter of support for the
Mansfield project also.
e. The Commission signed an Order for T. Kinter on Greenwood Lake; a Determination form was
signed previously, but an Order of Conditions form was necessary. Same conditions on the project
apply.
f. Commission reviewed and approved the work at the Little league complex on Otis St. Work
involves the construction of new bathroom facilities which are handicapped accessible.
The next meeting date is June 4th.
Motion [SmithIMatthew] to adjourn; voted 4-0-0/