HomeMy WebLinkAboutPlanning 07/22/2026Town of Mansfield
i;��: I`if_Il
6 Park Rmv, Mansfield, MA 0204
Planning Board
1YI`eetirig'1GIinates
July 22, 2026
Meeting Meld in Person in Meeting Roont 3AM
Present: Michael McClanahan/Chair, Ryan Maxwell/Clerk, Joseph Cerretani, Ralph Penney,
Sreelatha Allam, Bryan Haworth, Kaitlyn Malkin/Associate, and
Michael Parsons/Associate
Sarah Raposa, Director of Planning & Development
Priscilla McGill, Administrative Secretary
Absent: Sharon Friedman
The meeting was called to order, and the introductory statement for audience members who wish
to record the meeting was read.
Mr. Haworth was appointed Acting Clerk with Mr. Maxwell attending remotely. It was noted
that votes would be by roll call.
Regarding the properties located at 87 Central Street and 30 Winthrop Street, to construct a
7,250 SF building to be attached to the existing Building B, to be used for the manufacturing of
building materials. The project site is owned by Freetown 3 Acquisition LLC and is shown on
Assessor's Plat/Lot 021/189, 021/389, 021/256, and 021/190, within the Industrial 3 (I3) zone.
As a direct abutter, Mr. Penney was recused.
John Erickson, General Manager, Nathan Dunbar, and Craig Cygawnoski, RIM Engineering,
were present.
Mr. Erickson provided a history of the industrial property, explaining that it has been used for
manufacturing since the 1940s, with multiple building additions over the decades and approvals
for a vehicle repair shop (1999) and a building expansion (2011). The current owners acquired
the property in 2019, which includes several parcels bordering the MBTA railroad and
residential neighborhoods with existing screening, including fencing, berms, and arborvitae,
buffering nearby homes.
Planning Board Meeting Minutes 07/22/26 Page 1 of 7
Mr. Cygawnoski explained that the proposal is to construct an addition (Building Bl) onto the
existing manufacturing building (Building B) to accommodate production of a new ultra -high-
performance window and door system for a Belgian manufacturer. The expansion is driven by a
$1 million investment in specialized equipment and is expected to create six to eight new jobs.
The addition will match the existing building in appearance and function, with all loading
occurring at grade inside the building and no loading docks.
The site is designed to separate customer and employee traffic from truck traffic. Customers and
employees will continue using the Central Street entrance, white all delivery tricks will use the
Winthrop Street entrance to minimize impacts on nearby residential streets. Additional parking,
accessible parking, lighting, drainage improvements, and a new fire hydrant are proposed. The
drainage system has been oversized at the Town Engineer's request and designed to avoid
impacts to the MBTA railroad corridor. Utility connections will tie into existing water and sewer
infrastructure, and the applicant's attorney is researching the status of the adjacent paper street
(Waverly Street) as part of the project.
The project consists primarily of constructing Building B 1, adding parking spaces, and extending
utilities within an area that is already heavily developed and largely impervious. The proposed
building area is currently gravel, compacted by decades of industrial use and truck traffic.
Approximately 29% of the site remains as open space, primarily along the residential property
boundaries where existing buffers are located. Mr. Cygawnoski noted that Town departments
have reviewed the project, and the primary outstanding comments came from the Town
Engineer, whose review prompted the submission of revised plan details.
The Town Engineer's continents were received and addressed the same day through revised
plans. The revisions corrected minor inconsistencies, clarified the required 10-foot separation
between water and sewer lines, ensured adequate cover over the force main, and addressed
excavation concerns near the MBTA railroad, where seven feet of unsuitable fill will be removed
while avoiding the railroad's protected work zone. Ms. Raposa confirmed that the applicant had
resolved outstanding comments related to landscaping, lighting, and other site plan details,
leaving only a question about whether the reduction in open space requires zoning relief or can
be addressed by the Building Commissioner during the building permit process. She concluded
that the project meets the site plan approval criteria. She also recommended granting the
applicant's request for a reduced application fee based on the 17,400-square-foot area of
disturbance rather than the full 17-acre parcel, while still requiring payment of the standard $2-
per-abutter notification fee.
Motion by Mr. Haworth, seconded by Mr. Ceretani, to grant a partial waiver from the Planning
Board filing fee requirements for the Sunrise Erectors site plan application to be an application
fee of $690 for the area of disturbance plus an abutters notification fee of $398 for 199 abutters,
totaling $1,088.
Roll Call Vote: Ryan Maxwell, Aye; Joseph Cerretani, Aye; Sreelatha Allam, Aye;
Bryan Haworth, Aye; Michael McClanahan, Aye
Vote: 5-0-0 [Aye 5, Nay 0, Abstain 0] PASSED
Mr. Erickson stated that the company employs approximately 350 people, with its main office in
Canton and about 200 field employees. The Mansfield expansion is expected to create five to six
new jobs without changing the current operating homy, which are generally 7:00 am to 4:30 pm.
Planning Board Meeting Minutes 07/22/26 Page 2 of 7
Mr. Cerretani raised questions about the number of exterior light fixtures proposed for the
addition. The applicant explained that the lighting was designed by the project architect and
supported by a photometric plan demonstrating no light spillover onto neighboring properties.
The fixtures are LED, dimmable, and can be adjusted if necessary.
In response to Ms. Allam's questions, Mr. Erickson confirmed that the new addition (Building
BI) will be physically connected to the existing Building B by removing the separating wall
once the new building has been constructed. Building code and emergency egress requirements
will be addressed during the building permit review. Existing parking is not fully utilized, with
an estimated 10 to 1,5 spaces typically remaining available each day, and additional parking is
being added to support the expansion, including one new handicap space. Ms. Allam
recommended that the applicant proactively notify the MBTA of the project and obtain a letter of
no objection before construction begins to avoid potential issues related to work near the railroad
right-of-way.
The Board discussed that the application is a modification to an existing site plan approval for a
long-established industrial property that has existed since tine 1940s, predating the existing
zoning. Because the property has expanded incrementally over time, each new construction
project has gone through review, but a comprehensive baseline for the entire site's lot coverage,
impervious area, or open space has never been established. The 2011 approval only identified
that impervious area removed was offset by impervious area added, resulting in a net "wash,"
without documenting total site calculations.
Discussion continued on whether the current proposal would similarly result in a net change for
lot coverage and open space and whether the reduction in open space or increase in a pre-existing
nonconformity would require additional zoning relief Ms. Raposa indicated this issue was not a
barrier to site plan approval but would need to be resolved during the building permit review,
potentially involving a determination by the Building Commissioner or, if required, a finding by
the Zoning Board of Appeals that the change is substantially consistent with the neighborhood
character. She farther noted that recent changes to Massachusetts General Law Chapter 40A,
Section 6, regarding nonconforming structures and uses, may provide additional flexibility.
The proposed open space and lot coverage changes were disuussed, noting that while
improvements to open space are typically preferred, the industrial nature of the property makes
additional impervious surface reasonable. Mr. Erickson explained that paved areas help contain
potential spills and reduce the risk of contamination entering groundwater. He also described
prior enviromnental cleanup efforts, including the removal of approximately 4,400 tons of
contaminated soil, discovery and removal of previously unknown underground storage tanks,
and an overall investment of approximately $650,000 to remediate the property.
Mr. Haworth referenced a parcel boundary issue raised by the Assessors' Office. Because the
proposed building addition crosses multiple contiguous parcels (87 Central Street and 30
Winthrop Street), including two registered land parcels, there may be challenges assigning the
new building footprint for assessment and taxation purposes. Mr. Erickson indicated that their
attorney had said that there is no need to merge the parcels.
Planning Board Meeting Minutes 07/22/26 Page 3 of 7
Ms. Raposa suggested that the Board may want to include a condition requiring the applicant to
work with the appropriate Town departments to resolve the issue. Mr. Maxwell expressed
support for the project, noting that converting existing paved/underutilized industrial space into a
productive manufacturing use that creates jobs outweighs concerns about a minor reduction in
open space.
There were no public conunents.
Ms. Raposa reviewed the potential conditions of approval for parcel/registered land issue, open
space/zoning table, landscaping and screening, lighting (reduced at 9:00 pin), refuse and waste,
traffic/site circulation, no expansion beyond approval, and notice fee. These conditions are in
addition to the standard conditions per the rules and regulations.
There were no further Board comments.
Motion by Mr. Cerretani, seconded by Mr. Haworth, that the Planning Board approve the Site
Plan Approval Modification for Sunrise Erectors at 87 Central Street / 30 Winthrop Street,
pursuant to Mansfield Zoning Bylaw §230-5.3, for construction of the proposed Building B 1
manufacturing addition and associated site improvements, as shown on the plans prepared by
RIM Engineering Co., Inc., as revised through July 21, 2026, subject to the findings and
conditions discussed this evening and as set forth in the staff report.
Roll Call Vote: Ryan Maxwell, Aye; Joseph Cerretani, Aye; Sreelatlra Allam, Aye;
Bryan Haworth, Aye; Michael McClanahan, Aye
Vote: 5-0-0 [Aye 5, Nay 0, Abstain 0] PASSED
Before the Zoning Act review, the Board had a brief discussion regarding the assessment of land
disturbance fees, whether it should be a waiver request or if the Rules and Regulations should be
changed.
Ms. Raposa reviewed recent changes to the Massachusetts Zoning Act that took effect July 1,
focusing on how they will affect local zoning administration and future bylaw amendments. The
most significant change is the revision to the variance standard, which replaces the traditional
hardship test with a more flexible balancing test based on "practical difficulty," giving ZBAs
greater discretion in evaluating variance requests. Members discussed how this approach more
closely resembles the balancing analysis already used for special permits and may make variance
decisions easier to defend.
Ms. Raposa also reviewed several procedural changes to Chapter 40A, including allowing
electronic notification for certain zoning amendment requests, clarifying when zoning
protections begin for pending applications, extending building permit protection from 12 months
to 24 months, creating a three-year zoning protection period for special permits and site plan
approvals, and extending the abandonment period for non-use from two years to four years.
Planning Board Meeting Minutes 07/22/26 Page 4 of 7
Some of the statutory changes will require updates to Mansfield's zoning bylaws, likely to be
proposed at Spring Town Meeting. She also referenced a notable new provision allowing
applicants to seek a residential use variance on non-residential properties, potentially enabling
vacant office, retail, or commercial sites to be redeveloped for housing if the ZBA finds the
practical difficulty standard has been met.
The Board acknowledged this could have significant implications for future redevelopment and
housing production while noting that each application will continue to be evaluated on its
individual merits. The Board discussed new provisions permitting electronic hearing notices to
interested property owners and explored ways the Town could better collect email addresses and
use existing communication channels, such as utility bills and the Town newsletter, to improve
public outreach on zoning matters.
• Parkway/Transit Oriented Development
• Zoning Bylaw Amendments
o Accessory Dwelling Units setbacks - Mr. Penney asked whether the density
table could be revised for setbacks. Ms. Raposa said that a general statement
for 15-foot setbacks was proposed and reviewed by Town Counsel, who
agreed that it was a good approach.
• Planning Board Policies & Procedures of the Planning Board with Site Plan Approval
and Special Permit Rules and Regulations, and Planning Board Fees
• Mark Corsillo
o (initiated 1128126) - Scenic Road Bylaw (nnore teeth)
o (initiated 2125126) —Bill HD.5686, An Act Establishing the !Missing-A1lliddle
Starter Home Development and Home Ownership Program
• Bryan Haworth (initiated 1128126) - Inclusionary Zoning Bylaw Incentives for developers
to inclydelconstruct new units
• Ralph Penney (initiated 12110125)
o Loss of Commercial /Business Space in BI, B2, and Downtown Areas
o Adequacy and Intent of First -Floor Commercial Requirements
o Parking as the Primary Driver of Downtown Redevelopment Outcomes
o Employee Parking Expectations and Clarity in the Bylaw
o Use and Interpretation of Density Bonuses and Structured Parking
o Cumulative Impact ofbncremental Decisions
o Re-evaluation of Planning Board Policies and Site Plan Review Standards
No discussion of these items.
Bylaw Amendments for STM
The Planning Board reviewed upcoming zoning articles for Fall Town Meeting, including
Accessory Dwelling Units (ADUs), floodplain zoning amendments, and a minor change
regarding primary dwellings. The public hearing will be on August 26`h with a secondary hearing
on September 91".
Planning Board Meeting Minutes 07/22/26 Page 5 of 7
The Board discussed proposed ADU setback requirements by zoning district with updated
language to establish the setbacks.
Ms. Raposa also clarified that existing nonconforming accessory structures may be converted to
habitable ADUs where protected under Chapter 40A, Section 3, subject to applicable
requirements.
8:30 pm Ms. Allcnn departed the meeting.
Ms. Raposa noted that future zoning discussions will include 55+ housing districts, business
districts, and the proposed North Main Street Overlay District, with additional public outreach
planned during the fall and winter before potential Spring Town Meeting action.
8: 32 pm Mr. Maxwell departed the meeting.
A discussion ensued of pending state legislation that could allow duplexes by right in single-
family zoning districts, as well as a proposed ballot question permitting single-family homes on
5,000-square-foot lots by right. Members observed that these state initiatives, if adopted, could
significantly affect local zoning.
The Board discussed the Commonwealth's growing emphasis on housing production, noting that
legislators are responding to both the state's housing shortage and broader economic concerns.
Members observed that many lawmakers are personally experiencing housing affordability
challenges and that Massachusetts is seeking to retain residents and strengthen its economy
though housing initiatives. They noted that these goals have driven recent state policies,
including housing provisions within the economic development bill and the adoption of MBTA
Communities requirements.
Following the departure of the Town's former Economic Development Director, Ms. Raposa has
increased involvement in economic development efforts for the Town. She explained that, over
the past year, she has developed a greater interest and understanding of economic development
through professional training and expanded responsibilities.
Meeting Minutes — Aly 8, 2026
Moved to August 26, 2026
No items
Mr. Penney inquired about the status of the previously approved Pratt Street four -unit condo
project. There was some uncertainty about the project's current status. One member believed
construction had begun after seeing equipment on the site, while another reported that the
property had been listed for sale and, according to the Building Inspector, no work had started.
Planning Board Meeting Minutes 07/22/26 Page 6 of 7
Mr. Pemmey also inquired about the proposed small cottage -style housing development across
from the Chocolate Factory. Ms. Raposa responded that the owner has been addressing
geotechnical issues, additional ledge discovered on the site, and conflicts between Board of
Health regulations and building code requirements, including concerns related to minimum
bedroom or kitchen sizes. The project is on hold and is expected to come back before the Board
in the future.
Motion by Mr. Penney, seconded by Mr. Cerretani, to adjourn at 8:45 pm
Vote: 4-0-0 [Aye 4, Nay 0, Abstain 0] PASSED
The date of the Next Planning Board Meeting is August 26, 2026, at 7: 00 p.m.
1'W�
Clerk Kra na e//
Documents Presented for the Mectin
Date of Approval
1. Meeting Notice Agenda for July 22, 2026
2. 37 Central Street and 30 Winthrop Street application and supporting documents
3. Meeting Minutes draft for July 8, 2026
4. Zoning Bylaw Articles for discussion
Planning Board Meeting Minutes 07/22/26 Page 7 of 7