HomeMy WebLinkAboutPlanning 02/26/2025OFFICE
7025 hiAR 21 A 9 10
rn�
� 4 x
9L f Q
p
Meeting Minutes
February 26, 0
Town of Mansfield
6 Pak Isom Alanafreld, AIA 02048
Planning Board
Meeting Held in Person in Meeting Room 3A/B and
Virtually Using Go ToWebinar Platform
Present: Michael Feck, Chair; Sharon Friedman, Clerk; Joseph Cerretani;
Michael McClanahan (remote); Mark Corsillo
Sarah Raposa, Director of Planning & Development
Priscilla McGill, Administrative Secretary
Absent: Ralph Penney; James Turnbull, and Sreelatha Allam, Associate
Mr. Feck called the meeting to order and read the introductory remarks for video recording. He
noted that Mr. McClanahan was attending remotely and that all votes would be by roll call.
Fagade for renovations to the existing free-standing restaurant (formerly TGI Fridays) for a
proposed Burton's Grill & Bar.
Bill Whitlock, Whitlock Designs, explained that they will use the existing structure, paint the
exterior, and add new signage. The proposal includes a new patio with metal roof, faux wood
ceiling, pendant lighting, and planters at the perimeter. Mr. Whitlock presented three building
renderings depicting the changes. The exterior will be an off white with black trim. They will
hire a local artist to paint murals of local birds on two facades. The restaurant is polished casual
with a scratch kitchen, meaning allergy friendly. They have nine Massachusetts locations and 23
throughout the country.
Mr. Corsillo asked what type of local bird would be depicted on the mural. He noted that
Mansfield has a history with geese. Mr. Whitlock said the mural would be determined by the
artist and the design team. Mr. Corsillo expressed that he likes the overall aesthetic and patio.
Mr. Whitlock said the patio would not receive a lot of sun and that the roof is primarily to shield
from inclement weather.
Planning Board Meeting Minutes 02-26-25 Page 1 of 8
Mr. Cerretani said that the restaurant would be a welcome addition to a building that has been
vacant.
Mr. McClanahan asked how many outdoor seats there would be. Mr. Whitlock responded that
there would be about 30 patio seats, but no outdoor bar. Overall, including the outdoor seating,
there will be approximately 20 more seats than TGI Fridays had.
Ms. Friedman asked if a study had been conducted to determine if this site would be successful.
Mr. Whitlock said they did and Burton's is very confident it will do well at this location.
Ms. Raposa noted, for the record, the Plan Review Committee issued an Administrative Site Plan
Approval for the patio and roof.
Mr. Feck agreed that this is a good reuse of a former restaurant.
There were no public questions or comments.
Mr. Whitlock said they anticipate opening in the fall of this year.
Motion by Mr. Cerretani and seconded by Mr. McClanahan to approve the proposed fagade
alteration consisting of:
• Outdoor patio area
• Roofed patio
• Door relocation
• Fagade erilrancements
Roll call vote:
Mark Corsillo
Aye
Joseph Cerretani
Aye
Sharon Friedman, Clerk
Aye
Michael McClanahan
Aye
Michael Feck, Chair Aye
Five (5) in favor, Zero (0) opposed, Zero (0) abstained PASSES
Regarding the application of Tarpon Towers III, LLC & Cellco Partnership d/b/a Verizon
Wireless as Co -Applicants for a Special Permit pursuant to Bylaw Sections 230-5.5 and 230-3.6
(G)(2) at the 499 East Street property for the installation of a wireless eon nunications facility
consisting of a 140-foot monopole to be located within a 60 foot by 60-foot leased area along
with associated equipment within said installation compound. The project site is owned by the
Town of Mansfield and is shown on Assessor's Map 033, Lot 011 within the Residential 1 (RI)
zone.
Planning Board Meeting Minutes 02-26-25 Page 2 of 8
Attorney Ellen Freyman was present on behalf of the applicants. She said that Tarpon Tower:
and Verizon were the successful bidders to the project Request for Proposal (RFP) awarded in
May of 2024. They have been working with the Town and negotiated a lease, which includes
rental income to the Town, and finalized the tower location at the site. There were constraints
with the site as it is contiguous to the landfill and recycling center. The site is very suitable to
fill the current coverage gap. Town antennas will also be added to the top of the tower, which
will help with public safety communications.
Attorney Freyman referenced that they went before the Zoning Board of Appeals for two
variances and could answer questions after the Special Permit presentation.
Greg Sykier of Chappell Engineering, working with Tarpon and Verizon, reviewed the project
site noting the tower location would be at the northeast part of the site. The existing access will
be used for the tower access. The equipment compound will be 60' x 60' with utilities sourced
from the south side of East Street. He displayed the tower elevation drawing and explained the
height maximum of 140' with the Town whip antennas on the top, which extends the height
approximately 19' and necessitated the ZBA height variance. The Town selected the site
location and Tarpon partnered with the Town for the design of the tower location.
Mr. McClanahan asked if the tower would impact the existing recycling plant. Mr. Ahern,
Mansfield Operations Manager, responded that there is no impact and the existing access will
remain gravel.
Mr. Corsillo asked if this would resolve the Verizon specific issues at the schools. Amy White
of Smartlink, the Project Manager for Verizon Wireless and Tarpon Towers, replied that the
coverage should extend to the area of East Street for the schools to have improved coverage.
Martin Lavin of C Squared Systems explained the current coverage conditions and the coverage
expectations with the proposed site tower. Ms. Friedman questioned the small area of
improvement and lack of improvement at Branch Street. Ms. White responded that the goal was
to gain more coverage along Route 106, but it would not resolve all coverage issues. The target
for this specific search that the engineers were given was to enhance coverage along Route 106
to offset existing issues at the surrounding sites and add coverage to the south. It was never
intended to be a replacement for the Branch Street site. Multiple areas in Town still need service.
Wireless coverage and capacity are rapidly growing.
Mr. Corsillo asked for an explanation of the 700 megahertz versus the 2100 megahertz coverage.
Mr. Lavin responded that the average user would not tell the difference. He explained how
coverage jumps from one to the other for better service. Current phones can use both. The new
tower would primarily use 4G coverage with some frequencies at 5G.
Mr. Ahern summarized the process fiom the requests for proposal for this site and an airport site.
The Town did not receive any responses for the airport site but had responses for this site. He
noted that both sites have poor service. Mr. Ahern said the Town is seeking to remove the public
radio repeaters from the high school and add them to the new tower. Tarpon has agreed to
Planning Board Meeting Minutes 02-26-25 Page 3 of 8
provide the labor and the Town would provide the material. At the May 22, 2024 Town
Meeting, approval was obtained for the land lease for the cell tower. In January 2024, a Master
Green Study was conducted. The study reviewed walking trails, the compost area, the shooting
range, and the training facility. This area was identified as the best area for the tower. The tower
will increase cell coverage for residents, passerby in the general area, improve public safety and
DPW communications, and allow the high school equipment to be relocated to this site. This
will also provide general yearly Town income. Mr. Ahern explained that the location on the site
was chosen to be away from the landfill and closer to the road. Ms. White also noted that there
are wetlands, walking trails and pipeline easements on the property which limited the tower
location. The search area that they were given was only about a quarter mile radius.
Ms. Friedman asked if the height of the tower could increase in the future. Mr. Ahern replied
that the zoning district allows for a maximum of 140' so it would not be likely.
Brett Buggeln, President, COO of Tarpon Towers reiterated that the Town would not be charged
rent for the antennas or other improvements at the site for public safety and communications. He
confirmed that the lease agreement will provide a revenue stream to the Town. The approval of
the tower creates added incentive for Tarpon to lease to aggregate carriers for a revenue stream
to both parties.
Ms. Friedman asked what color the monopole would be. Mr. Buggeln responded that it would
be galvanized flat gray, and added that paint color typically does not last and creates
maintenance issues.
Public Comment
Neil Boldrighini of 560 East Street agreed that there is a need for coverage for the Town and
especially public safety. He lives across the street and noted the improvements to the recycling
area, and he would not want to see anything contrary to those improvements. He asked that they
camouflage the lower level of the site as best as possible. Mr. Buggeln said they could entertain
painting the lower part of the tower for a better visual aspect. He distributed photos of towers
disguised as evergreen trees, but noted that it is difficult to screen it entirely. He said that bottom
landscape screening has been effective, but not fencing, which would prevent police fiom
monitoring the site. Mr. Boldgighini responded that he is not asking for the pole to become a
tree. He is looking for bottom plantings to lessen the industrial look and make it more
aesthetically pleasing. Mr. Buggeln said he would be agreeable to that option.
Ms. Raposa said that the Board would need to make a finding for the gap in coverage before they
can grant the special permit. She then read the determination to be made by the Board, which
was incorporated into the draft motion. Ms. Raposa referenced the special permit criteria, the
standard conditions, and text of the bylaw that includes annual certification and signage. The
landscape vegetation as discussed will also be added to the conditions of approval.
Planning Board Meeting Minutes 02-26-25 Page 4 of 8
Motion by Mr. Corsillo and seconded by Mr. Cerretani that the Planning Board finds that there
is a significant gap in wireless coverage AND to approve the special permit application for the
proposed Wireless Installation, consisting of erecting a one hundred forty (140) foot tall
monopole which will house nine (9) panel antennas, six (6) remote radio head (RRH) units, one
(1) fiber junction box, as well as additional hardware and cable equipment as further described in
the Plans, including a 12' x 20' concrete equipment pad to house the equipment cabinets which
will be enclosed by 8' tall chain link fencing with the conditions as discussed.
Deliberation
Mr. Corsillo stated that as far as the impact on the health, safety, convenience general welfare,
and amenities of the town, they have made a strong case that it will be a general improvement
with no notable negative impacts. In particular, it will improve general health, safety, and
welfare by providing better coverage for the Public Safety Communications infrastructure. This
also speaks to the positive impact on the adjoining premises, neighborhoods, and social structure.
The applicant has shown a willingness to work with the town and abutters on that topic. There
will be no impact on vehicular or pedestrian safety as there will be almost no traffic created by
this. The municipal facilities will be improved by this, with no additional strain. There will be a
minimal impact on the natural environment and only positive impact on the tax base and
municipal finances.
Mr. Corsillo voted in favor.
Mr. Cerretani stated that the tower would provide more amenities to the town. It will fill a
coverage gap. It will help with public safety communications. There is an effect on adjoining
premises, but he is grateful that the applicant could make adjustments. There are no traffic
concerns. It will provide conmumications to our facilities. There will be minimal impact on the
natural enviromment. The fiscal impact would be rent and taxes, which will be an upside for the
town.
Mr. Cerretani voted in favor.
Ms. Friedman stated that the benefits outweigh the detriments of this presentation. The
installation will provide needed coverage and will enhance our municipal communications.
There will be an impact on the neighborhood, but the applicant is willing to mitigate that with
fencing and trees. There is no impact on vehicular and pedestrian traffic. There is an impact on
the natural environment, but maybe birds will nest there. There are fiscal benefits that will help
the town.
Ms. Friedman voted in favor.
Mr. McClanahan stated that the benefits outweigh the detriments. It will increase the coverage
for the community and public safety. The applicant has addressed what the abutters are asking
for. The income will also be a value to the town.
Mr. McClanahan voted in favor.
Planning Board Meeting Minutes 02-26-25 Page 5 of 8
Mr. Feck stated that the benefits outweigh the detriments. The project will have a positive impact
on the health and wellbeing on the amenities of the town by increasing coverage. The applicant
has mitigated the effects on the adjoining premises. There will be very little vehicular traffic. It
will improve the municipal facilities by putting the antennas on top. It has a minimal effect on
the natural envirormient and the fiscal impacts will be positive to the town.
Mr. Feck voted in favor.
Roll call vote:
Mark Corsillo
Aye
Joseph Cerretani
Aye
Sharon Friedman, Clerk
Aye
Michael McClanahan
Aye
Michael Feck, Chair
Aye
Five (5) in favor, Zero (0) opposed, Zero (0) abstained PASSES
Motion by Mr. Cerretani and seconded by Mr. Corsillo to close the public hearing.
Roll call vote:
Mark Corsillo
Aye
Joseph Cerretani
Aye
Sharon Friedman, Clerk
Aye
Michael McClanahan
Aye
Michael Feck, Chair
Aye
Five (5) in favor, Zero (0) opposed, Zero (0) abstained PASSES
Parkway/Transit Oriented Develo nv tent
Mr. Feck asked that the Board members reach out to Ms. Raposa to confirm meeting time slots
for the Innes Group site walk and kickoff meetings on 3/5/25.
Ms. Raposa noted a meeting with VHB and met with the garage consultant for an introductory
conversation, which was very interesting. The team is considering September to hold the next
public forum.
Zoning Bylaw Amendments
No discussion.
v
Appoint Member to the Capital Improvement ProMrant Committee (Current Beth Ashman -
Collins; Term Expires December 31, 2025)
Mr. Cerretani volunteered.
Planning Board Meeting Minutes 02-26-25 Page 6 of 8
Motion by Mr. Corsillo and seconded by Mr. McClanahan to appoint Mr. Cerretani.
Roll call vote:
Mark Corsillo
Aye
Joseph Cerretani
Aye
Sharon Friedman, Clerk
Aye
Michael McClanahan
Aye
Michael Feck, Chair
Aye
Five (5) in favor, Zero (0) opposed, Zero (0) abstained PASSES
Meeting Minutes for February 12 2025
Motion by Mr. Cerretani and seconded by Mr. McClanahan to approve the minutes as presented.
Roll call vote:
Mark Corsillo
Aye
Joseph Cerretani
Aye
Sharon Friedman, Clerk
Aye
Michael McClanahan
Aye
Michael Feck, Chair
Aye
Five (5) in favor, Zero (0) opposed, Zero (0) abstained PASSES
250 Balcorn St. final plans for Board signatures
The applicant did not submit the plans. This item was postponed.
There were no items.
Mr. Corsillo noted that Cabot has replaced signage on West St. for the open space in the
industrial park and is an improvement to the previous signage.
Ms. Raposa referenced the addition of an I I"' item to the proposed bylaw amendment list to
correct technical errors in eCode.
Ms. Raposa said that two Gilbert Street properties are interested in discussions for starter home
developments. A brief discussion relating to options ensued.
Planning Board Meeting Minutes 02-26-25 Page 7 of 8
Motion by Mr. McClanahan and seconded by Mr. Cerretani to adjourn at 8:25 pm
Roll call vote:
Mark Corsillo
Aye
Joseph Cerretani
Aye
Sharon Friedman, Clerk
Aye
Michael McClanahan
Aye
Michael Feck, Chair
Aye
Five (5) in favor, Zero (0) opposed, Zero (0) abstained PASSES
The date of the Next Planning Board Meeting is March 12, 2025, at 7: 00 p. m.
�L �
Sharon Friedman, Clerk
Documents Presented for the Meeting
Date of Approval
1. Sarah Raposa, Director of Planning and Development meeting memo dated 2/26/25
2. Meeting Notice Agenda for 02/26/25
3. 280 School St. fagade application
4. 499 East St. application
5. Draft Meeting Minutes for February 12, 2025
Planning Board Meeting Minutes 02-26-25 Page 8 of 8