HomeMy WebLinkAboutForbes110
Maura T. Healey
Governor
Kimberley Driscoll
Lieutenant Governor
Rebecca L. Tepper
Secretary
Bonnie Heiple
Commissioner
This information is available in alternate format. Please contact MassDEP at 617-292-5500.
TTY# MassRelay Service 1-800-439-2370
MassDEP Website: www.mass.gov/dep
Printed on Recycled Paper
January 3, 2025
BGO TSG 110 Forbes Owner, LLC
c/o Seyon Management
Attn: Mr. Adam Leonard
535 Boylston Street, 11th Floor
Boston, MA 02116
RE: MANSFIELD - BWSC
Release Tracking Number: 4-0051229
110 Forbes Blvd
Next Phase Medical
NOTICE OF RESPONSIBILITY
THIS IS AN IMPORTANT NOTICE.
FAILURE TO TAKE APPROPRIATE ACTION IN RESPONSE
TO THIS NOTICE COULD RESULT IN SERIOUS LEGAL CONSEQUENCES.
Dear Mr. Leonard:
The Massachusetts Department of Environmental Protection, Bureau of Waste Site Cleanup (MassDEP or
the Department) is tasked with ensuring the cleanup of oil and hazardous material (OHM) releases
pursuant to the Massachusetts Oil and Hazardous Material Release Prevention and Response Act (M.G.L.
c. 21E or Chapter 21E). The law is implemented through regulations known as the Massachusetts
Contingency Plan (310 CMR 40.0000 et seq. – the MCP). Both Chapter 21E and the MCP require the
performance of response actions to provide for the protection of harm to health, safety, public welfare
and the environment which may result from releases and/or threats of releases of OHM.
REASON FOR THIS NOTICE
On December 30, 2024 at 12:52 PM MassDEP received a notification from Brian Valentine of a release of oil
at the above referenced location. The tenant of the building identified a release of diesel fuel to the parking
lot and drainage swale. Heavy rains at the time of the notification made it difficult to identify the volume of
the release. Clean Harbors was contracted by the tenant to conduct the initial response actions. During an
inspection of the site conducted on January 3, 2025, MassDEP determined that the volume of the release is
likely greater than 10 gallons. Pursuant to 310 CMR 40.0311(3), this release requires notification to MassDEP
within two (2) hours of obtaining knowledge, and pursuant to 310 CMR 40.0412(1) this release requires that
an Immediate Response Action (IRA) be conducted.
Notice of Responsibility Page 2 of 4 Release Tracking Number 4-0051229 `
Chapter 21E and the MCP require the performance of response actions to prevent harm to health, safety,
public welfare and the environment which may result from this release and govern the conduct of such
actions. The purpose of this notice is to inform you of your legal responsibilities under State law for assessing
and/or remediating the release at this property. For purposes of this Notice of Responsibility (NOR) the terms
and phrases used herein shall have the meaning ascribed to such terms and phrases by the Chapter 21E and
the MCP unless clearly indicated otherwise.
STATUTORY LIABILITY
MassDEP has reason to believe that you (as used in this Notice, “you” and “your” refers to BGO TSG 110
Forbes Owner, LLC), as the current owner of the property where a release has occurred, are a Potentially
Responsible Party (PRP) with liability under M.G.L. c. 21E §5, for response action costs. Section 5 makes the
following parties liable to the Commonwealth of Massachusetts: current owners or operators of a site from
or at which there is or has been a release/threat of release of oil or hazardous material; any person who
owned or operated a site at the time hazardous material was stored or disposed of; any person who arranged
for the transport, disposal, storage or treatment of hazardous material to or at a site; any person who
transported hazardous material to a transport, disposal, storage or treatment site from which there is or has
been a release/threat of release of such material; and any person who otherwise caused or is legally
responsible for a release/threat of release of oil or hazardous material at a site.
This liability is "strict", meaning that it is not based on fault, but solely on your status as owner, operator,
generator, transporter, disposer or other person specified in M.G.L. c. 21E §5. This liability is also "joint and
several", meaning that you may be liable for all response action costs incurred at a disposal site regardless of
the existence of any other liable parties. Pursuant to M.G.L. c. 21E and the MCP the term disposal site means
anywhere OHM has come to be located.
MassDEP encourages parties with liability under M.G.L. c. 21E to take prompt and appropriate actions in
response to releases and threats of release of oil and/or hazardous materials. By taking prompt action, you
may significantly lower your assessment and cleanup costs and/or avoid liability for costs incurred by
MassDEP in taking such actions.
You may be liable for up to three (3) times all Response Action Costs incurred by MassDEP. Response Action
Costs include, without limitation, the cost of direct hours spent by MassDEP employees arranging for
response actions or overseeing work performed by persons other than MassDEP or its contractors, expenses
incurred by MassDEP in support of those direct hours, and payments to MassDEP's contractors. (For more
detail on cost liability, see 310 CMR 40.1200.)
MassDEP may also assess interest on costs incurred at the rate of twelve percent (12%), compounded
annually. To secure payment of this debt, the Commonwealth may place liens on your property in the
Commonwealth. To recover the debt, the Commonwealth may foreclose on these liens or the Attorney
General may bring legal action against you.
In addition to your liability for up to three (3) times all Response Action Costs incurred by MassDEP, you may
also be liable to the Commonwealth for damages to natural resources caused by the release. Civil and
criminal liability may also be imposed under M.G.L. c. 21E, § 11, and civil administrative penalties may be
imposed under M.G.L. c. 21A, § 16 for each violation of M.G.L. c. 21E, the MCP, or any order, permit or
approval issued thereunder.
Notice of Responsibility Page 3 of 4 Release Tracking Number 4-0051229 `
By taking prompt actions you may also avoid the imposition of, the amount of or reduce certain annual
compliance assurance fees payable under 310 CMR 4.00.
You should be aware that you may have claims against third parties for damages, including claims for
contribution or reimbursement for the costs of cleanup. Such claims do not exist indefinitely but are governed
by laws which establish the time allowed for bringing litigation. MassDEP encourages you to take any action
necessary to protect any such claims you may have against third parties.
If you are a responsible party and you have reason to believe that your performance of the necessary
response actions is beyond your technical, financial or legal ability, you should promptly notify the
Department in writing of your inability in accordance with MGL c. 21E, subsection 5(e), and 310 CMR 40.0172.
If you assert or demonstrate in compliance therewith that performing or paying for such response action is
beyond your ability, subsection 5(e) provides you with a limited defense to an action by the Commonwealth
for recovery of two to three times the Department’s response action costs and 310 CMR 40.0172 provides
you with a limited defense to the Department’s assessment of civil administrative penalties.
Please refer to M.G.L. c. 21E for a complete description of potential liability.
ORALLY APPROVED IMMEDIATE RESPONSE ACTION
As outlined above, and pursuant to 310 CMR 40.0412(1), this release requires that an IRA be conducted. At
the time of oral notification to MassDEP, the following response actions were approved as an IRA:
• Continued assessment.
• Deployment of absorbent/containment materials.
• Removal of oil contaminated water.
All Remediation Waste generated must be properly stored/handled and disposed as soon as possible and,
in all cases, within 120 days from the date of generation per 310 CMR 40.0030.
ADDITIONAL ACTIONS REQUIRED
Additional submittals are necessary relative to this notification including, but not limited to, a written IRA
Plan, IRA Completion Statement and/or a Permanent or Temporary Solution Statement. The MCP requires
that a fee of $1,470.00 be submitted to MassDEP when a Permanent Solution Statement is filed greater
than 120 days from the date of initial notification.
Specific approval is required from MassDEP for the implementation of most IRAs pursuant to 310 CMR
40.0420. Release Abatement Measures (RAMs) may not be conducted until a RAM Plan is submitted pursuant
to 310 CMR 40.0443. Assessment activities, the construction of a fence and/or the posting of signs are actions
that are exempt from this approval requirement.
In addition to oral notification, 310 CMR 40.0333 requires that a completed Release Notification Form (BWSC-
103) be submitted to MassDEP within sixty (60) calendar days of December 30, 2024.
Notice of Responsibility Page 4 of 4 Release Tracking Number 4-0051229 `
You must employ or engage a Licensed Site Professional (LSP) to manage, supervise or perform the necessary
response actions to address this release/threat of release. You may obtain a list of the names and addresses
of these licensed professionals from the Board of Registration of Hazardous Waste Site Cleanup Professionals
by calling (617) 556-1091 or visiting http://www.state.ma.us/lsp. MassDEP records indicate that Mr. Tim Snay
of Sanborn, Head, & Associates is the LSP of Record.
Unless otherwise provided by MassDEP, potentially responsible parties (PRPs) have one year from the initial
date of notification to MassDEP of a release, pursuant to 310 CMR 40.0300, or from the date MassDEP issues
a Notice of Responsibility, whichever occurs earlier, to file with MassDEP one of the following submittals: (1)
a completed Tier Classification Submittal; (2) a Permanent or Temporary Solution Statement or, if applicable,
(3) a Downgradient Property Status. The deadline for either of the first two submittals for this release is
December 30, 2025.
This release shall not be deemed to have had all the necessary and required response actions taken unless
and until all substantial hazards presented by the release have been eliminated and a level of No Significant
Risk exists or has been achieved in compliance with Chapter 21E and the MCP. The MCP requires persons
undertaking response actions to address a release to submit to MassDEP a Permanent Solution Statement
prepared by an LSP in accordance with 310 CMR 40.1000 upon determining that a level of No Significant Risk
already exists or has been achieved relative to the release.
If you have any questions relative to this Notice, please contact Mr. Jaime Goncalves at the letterhead
address, at Jaime.Goncalves@mass.gov or at 617-418-9627. All future communications regarding this release
must reference the following Release Tracking Number: 4-0051229.
Sincerely,
Andrew L. Jones, Acting Chief
Emergency Response Section
Bureau of Waste Site Cleanup
J/JG
ec: Board of Health
Board of Selectmen
Fire Department
DEP-SERO - Data Entry