HomeMy WebLinkAboutMBC 01/23/2023Municipal Building Committee Meeting RECEIVEDg RKOr ���a C•LCF1'I�.r7 OFFICE January 23, 2023 Present: Doug Amrino, Chairman Chris Paquin, Member Bob Barry, Member Maureen Doherty, Member Also Present: Mike Ahern, OPM/Public Buildings Kevin Dumas, Town Manager Josephine Madrazo, COA Director Sherri Gurnon, Recreation Director Mitch Bregnard, Recreation Board Chairman Neal Boldrighini, COA Board Chairman Wendy Adams, Assistant COA Director Rachel Young -Project Manager BH+A Not Present: Joel Bargmamr-Principal in Charge BH+A Evan Epstein, Vice -Chairman Mr. Amrino noted a quorum present and called the meeting to order at 6:30 pm. 1. Approval of meeting minutes from December 05, 2022 1U23 JUN 21 P 4: 08 MANSFIELD MASSACHUSETTS Motion: Mrs. Doherty made a motion to approve the meeting minutes dated December 05, 2022. (Doherty/Paquin). Vote is 4-0-0 2. Invoices for Payment Motion: Mrs. Doherty made a motion to approve the invoices for BH+A in the amount of $28,750.00 (Doherty/Paquin). Vote is 4-0-0 3. Resident Questions and Comments None 4. Update from BH+A on Schematic Design Completion, Site Plan and Elevations. Mrs. Young went thru the content of the provided packet that consisted of the community survey, site plans, floor plans, interior renderings, building exterior elevations, material use examples, cost estimate surmnary, schedule and what next steps we are taking as defined. Mrs. Young started going thru an in-depth review of the site plan and Mr. Dumas stated that the existing bridge at 50 West Street is scheduled to be reconstructed and suggested that Mrs. Young get proposed plans to the DPW Director Mr. Reinke so he could have the necessary improvements incorporated into the reconstruction work that will be upcoming in the future. Mrs. Young went thru the first floor and second floor plans and spoke briefly about each space. They will be adding a dormer to the rear of the building to accept the stairs to the attic area where all the HVAC equipment is proposed to be located. Mrs. Young went tluu the interior elevations, building sections and renderings. Mr. Barry asked if the elevator is compliant with the code for a stretcher and Rachel stated it was. Mrs. Doherty asked about acoustics in the multipurpose room and was concerned based on some of her previous projects. Mrs. Young stated this would be looked at in more depth as we progress tluu design development phase. Mr. Dumas stated the room looked big to him, along with the higher ceilings, and this may have to be looked at further seeing the project has a 16m price tag as of today. Mrs. Young noted she is still looking at the clock tower and didn't remove the name from the building but will in the next rendering. 5. Update on COA survey questions Mrs. Young updated the committee and stated that they have presently received about 150 responses and that two thirds have been paper responses. Mrs. Young expects to have the survey results completed the third or fourth week of February. 6. Update on BH+A and Recreation programing session. Mr. Ahern explained that earlier before tonight's MBC meeting, the subcormnittee met with the Mrs. Gurnon -Recreation Director and the Mr. Bregnard- Recreation Commission Chairman and started the preplanning and space needs programing. 7. Update on Radio Tower Location with the Town Manager. Mr. Dumas stated he is looking at the radio tower issue and looking to see if it can be relocated or incorporated into the new building plan. Mr. Dumas is awaiting a response from Mr. Verdone, the regional connnunication coordinator, whom he notified previously about this issue. Mr. Dumas will let Mr. Ahern know when he gets the information from Mr. Verdone. 8. Discussion with the Town Manager on status of funding for the project. lvir. Dumas started by saying this is a great project and likes many of the aspects from tonight's presentation and is very important to the town. Mr. Dumas stated that presently there isn't any funding available for this project except what has been set aside for the design development phase. Mr. Dumas reiterated that this is an important project to the town and lie is researching various grant opportunities that may be available to help offset the costs. Mr. Dumas stated that he needs to get a substantial grant to be able to move this project forward and he has been speaking about it with the select board. Mi•. Dumas stated the budget years ahead will be tough so this has to be planned out well as he doesn't see a lot of support for an override with the town accepting the fall cost of the project without any help financially. Mr. Dumas stated there may be some additional opportunities available to get larger grants by incorporating additional aspects into the design which he has been researching with Fire Chief Justin Desrosiers. Presently Mr. Dumas suggested slowing down the project and getting everything in order so that when the time comes and grants are available we will be ready. Mr. Ahern stated he feels that we are in a good place after we complete the design development phase, which we are currently in, and will get us much closer to a shovel ready project if finding comes along. 9. Update on team meeting with the MEP Engineers Mr. Ahern stated that Mr. Paquin, Mr. Annino, himself, and Mrs. Young met with the MEP engineers, several weeks ago, to discuss what the needs are and what design expectations are expected based on the towns experience on multiple other projects along with Mr. Annino and Mr. Paquin's experiences. 10. Other Items for discussion Related to COA Facility None 11. Upcoming meetings for MBC The next scheduled meeting will be Monday March 20, 2023 at 6:30PM 12. Old/new business None. 13. Any items not anticipated by the chair 48 hours prior to this meeting None. 14. Adjourn Motion: Adjourn the January 23, 2023 meeting at 7:51 pm (Paquin/Doherty) Vote is 4-0. 60� 14 - 0/. 0* Signature Date