HomeMy WebLinkAboutMBC 01/23/2023Municipal Building Committee Meeting RECEIVEDg RKOr
���a C•LCF1'I�.r7 OFFICE
January 23, 2023
Present:
Doug Amrino, Chairman
Chris Paquin, Member
Bob Barry, Member
Maureen Doherty, Member
Also Present:
Mike Ahern, OPM/Public Buildings
Kevin Dumas, Town Manager
Josephine Madrazo, COA Director
Sherri Gurnon, Recreation Director
Mitch Bregnard, Recreation Board Chairman
Neal Boldrighini, COA Board Chairman
Wendy Adams, Assistant COA Director
Rachel Young -Project Manager BH+A
Not Present:
Joel Bargmamr-Principal in Charge BH+A
Evan Epstein, Vice -Chairman
Mr. Amrino noted a quorum present and called the meeting to order at 6:30 pm.
1. Approval of meeting minutes from December 05, 2022
1U23 JUN 21 P 4: 08
MANSFIELD
MASSACHUSETTS
Motion: Mrs. Doherty made a motion to approve the meeting minutes dated December 05, 2022.
(Doherty/Paquin). Vote is 4-0-0
2. Invoices for Payment
Motion: Mrs. Doherty made a motion to approve the invoices for BH+A in the amount of
$28,750.00 (Doherty/Paquin). Vote is 4-0-0
3. Resident Questions and Comments
None
4. Update from BH+A on Schematic Design Completion, Site Plan and Elevations.
Mrs. Young went thru the content of the provided packet that consisted of the community
survey, site plans, floor plans, interior renderings, building exterior elevations, material use
examples, cost estimate surmnary, schedule and what next steps we are taking as defined. Mrs.
Young started going thru an in-depth review of the site plan and Mr. Dumas stated that the
existing bridge at 50 West Street is scheduled to be reconstructed and suggested that Mrs. Young
get proposed plans to the DPW Director Mr. Reinke so he could have the necessary
improvements incorporated into the reconstruction work that will be upcoming in the future.
Mrs. Young went thru the first floor and second floor plans and spoke briefly about each space.
They will be adding a dormer to the rear of the building to accept the stairs to the attic area
where all the HVAC equipment is proposed to be located. Mrs. Young went tluu the interior
elevations, building sections and renderings. Mr. Barry asked if the elevator is compliant with
the code for a stretcher and Rachel stated it was. Mrs. Doherty asked about acoustics in the
multipurpose room and was concerned based on some of her previous projects. Mrs. Young
stated this would be looked at in more depth as we progress tluu design development phase. Mr.
Dumas stated the room looked big to him, along with the higher ceilings, and this may have to be
looked at further seeing the project has a 16m price tag as of today. Mrs. Young noted she is still
looking at the clock tower and didn't remove the name from the building but will in the next
rendering.
5. Update on COA survey questions
Mrs. Young updated the committee and stated that they have presently received about 150
responses and that two thirds have been paper responses. Mrs. Young expects to have the survey
results completed the third or fourth week of February.
6. Update on BH+A and Recreation programing session.
Mr. Ahern explained that earlier before tonight's MBC meeting, the subcormnittee met with the
Mrs. Gurnon -Recreation Director and the Mr. Bregnard- Recreation Commission Chairman and
started the preplanning and space needs programing.
7. Update on Radio Tower Location with the Town Manager.
Mr. Dumas stated he is looking at the radio tower issue and looking to see if it can be relocated
or incorporated into the new building plan. Mr. Dumas is awaiting a response from Mr. Verdone,
the regional connnunication coordinator, whom he notified previously about this issue. Mr.
Dumas will let Mr. Ahern know when he gets the information from Mr. Verdone.
8. Discussion with the Town Manager on status of funding for the project.
lvir. Dumas started by saying this is a great project and likes many of the aspects from tonight's
presentation and is very important to the town. Mr. Dumas stated that presently there isn't any
funding available for this project except what has been set aside for the design development
phase. Mr. Dumas reiterated that this is an important project to the town and lie is researching
various grant opportunities that may be available to help offset the costs. Mr. Dumas stated that
he needs to get a substantial grant to be able to move this project forward and he has been
speaking about it with the select board. Mi•. Dumas stated the budget years ahead will be tough
so this has to be planned out well as he doesn't see a lot of support for an override with the town
accepting the fall cost of the project without any help financially. Mr. Dumas stated there may be
some additional opportunities available to get larger grants by incorporating additional aspects
into the design which he has been researching with Fire Chief Justin Desrosiers. Presently Mr.
Dumas suggested slowing down the project and getting everything in order so that when the time
comes and grants are available we will be ready. Mr. Ahern stated he feels that we are in a good
place after we complete the design development phase, which we are currently in, and will get us
much closer to a shovel ready project if finding comes along.
9. Update on team meeting with the MEP Engineers
Mr. Ahern stated that Mr. Paquin, Mr. Annino, himself, and Mrs. Young met with the MEP
engineers, several weeks ago, to discuss what the needs are and what design expectations are
expected based on the towns experience on multiple other projects along with Mr. Annino and
Mr. Paquin's experiences.
10. Other Items for discussion Related to COA Facility
None
11. Upcoming meetings for MBC
The next scheduled meeting will be Monday March 20, 2023 at 6:30PM
12. Old/new business
None.
13. Any items not anticipated by the chair 48 hours prior to this meeting
None.
14. Adjourn
Motion: Adjourn the January 23, 2023 meeting at 7:51 pm (Paquin/Doherty) Vote is 4-0.
60� 14 - 0/. 0*