HomeMy WebLinkAboutSludge Compost Facility -NUTT ROMNEY
Governor
TERRY HEALEY
Lieutenant Governor
COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS
DEPARTMENT OF ENVIRONMENTAL PROTECTION
SOUTHEAST REGIONAL OFFICE
20 RIVERSIDE DRIVE, LAKEVILLE, MA 02347 508-946-2700
si
t.
Mr. Kenneth F. Hackett
Town of Mansfield
6 Park Row
Mansfield, Massachusetts 02048
Dear Mr. Hackett:
......................
i
MAY
1
April 30, 2003
ii mo
ELLEN ROY HERZFELDER
Secretary,
EDWARD P. KUNCE
Acting Commissioner
RE: MANSFIELD--Residuals Approval of
Suitability, BRPWP29, 1998, 2001, 2002
and Future Compost Production, Mansfield
Sludge Composting Facility, Off Fruit
Street,
Transmittal No. W035188
In a letter dated March 6, 2003, your consultant, Camp, Dresser & McKee, Inc., acting on
behalf of the Town of Mansfield, applied for a Type I classification for compost produced at the
Town of Mansfield Sludge Composting Facility in Mansfield, Massachusetts. This composting
facility produces compost from wastewater treatment plant sludge generated at the Town of
Mansfield Water Pollution Control Facility located in Norton, Massachusetts. An application for
an Approval of Suitability (AOS) was filed under Transmittal No. W035188.
The product subject to this application was generated in 1998, 2001 and 2002 and is
currently stockpiled on -site. In support of this request, chemical analytical results, compost
temperature, TCLP results, and organic results were submitted to the Department. The
application contained the following supporting documentation:
1. Temperature monitoring data for the active compost piles.
2. Eight sets of laboratory test data representing three years of ongoing compost
processing. This data represents the appropriate sampling frequency in accordance
with 310 CMR 32.13(6) and the approved sampling and analysis plan. This test data
includes parameters listed in 310 CMR 32.13(5)(a) as well as organic parameters and
TCLP (Toxicity Characteristic Leaching Procedure) results.
The Department has reviewed the information submitted and has concluded that
composting has been conducted in accordance with the operation plan previously approved by
the Department and that sampling, analysis and reporting has successfully been completed
pursuant to the requirements of 310 CMR 32.00. Also, as a result of its review, the Department
has made the following determinations:
This information is available in alternate format Call Aprel McCabe, ADA Coordinator at 1-617-556-1171. TDD Service- 1.800-298-2207.
DEP on the World Wide Web: hUp://v .mass.gov/dep
0 Printed on Recycled Paper
2
1. All analyses have been conducted in accordance with the sampling and analysis plan
approved by the Department on December 11, 1997.
2. Sufficient data records have been submitted to allow the Department to classify the
compost sludge.
3. TCLP test data has demonstrated that the compost is non -hazardous pursuant to 310
CMR 30.00.
Temperature data obtained from the compost piles for which the Type I approval is
being sought have demonstrated that PFRP (Processes to Further Reduce Pathogens)
requirements have been met utilizing a static aerated pile, high temperature
composting process.
5. Results of all bulk analysis of compost for the land application parameters have been
reported appropriately and the final product meets the criteria for Type I as set forth in
310 CMR 32.12.
The Department has completed its review of the application and hereby grants Type I
approval for the sludge based product produced at the Mansfield, Massachusetts Sludge
Composting Facility during 1998, 2001 and 2002 and stockpiled at this facility; and for
continuing production of sludge based product from the date of this approval for a period of not
more than two (2) years. No other materials are subject to this approval. Pursuant to 310 CMR
32.11 (4), this approval shall be valid for no more than two (2) years from the date of this letter
subject to the following terms and conditions:
In discussions with the Town relative to utilization of the classified compost, the Town
indicated that a vendor will be the primary user of the Type I compost. The Town also
indicated that there could be other potential users of the Type I compost. For all
distribution, the Town shall comply with the labeling and other requirements of 310 CMR
32.51, "Requirements for sale or distribution of Type I sludge/compost", which states:
a) No person shall sell or distribute, or offer for use, sale, or distribution any
Type I sludge/compost unless, pursuant to 310 CMR 32.00, the
Department has approved such sludge/compost as Type I sludge/compost
and that approval is valid at the time the Type I sludge/compost is sold or
distributed, or offered for use, sale, or distribution.
b) No person shall obtain Type -I sludge/compost unless such sludge/compost
has a valid approval of suitability.
c) Labeling of I-ype, 141n ge/C omnogt. Each container in which Type I
sludge/compost is sold, distributed, or transported or offered for use, sale,
or distribution shall itself prominently display or, if such display is not
practicable, shall be accompanied by a shipping paper which shall
prominently display the following:
i) identification of the material as Type I sludge (compost).
ii) the date of issuance of the Department Approval of Suitability for
the Type I sludge/compost and the expiration date thereof.
iii) instructions for land applying the material in accordance with
proper agricultural practice, including, but not limited to,
identification of proper agronomic application rates which shall not
cause exceedance of the nitrogen requirements of the crop to be
grown or intended to be grown.
iv) Type I sludge/compost containing more than 10 parts per million
of molybdenum shall be accompanied by a written warning that the
sludge should not be used on pasture lands subject to grazing or on
lands where crops are grown or intended to be grown for forage.
Use of the sludge/compost under these circumstances may result in
forage crops containing levels of molybdenum which are toxic to
ruminants.
v) all other instructions and information required by law.
2. RecodKeepin , The Town shall comply with all the record keeping requirements of 310
CMR 32.60, including the submission to the Department of an annual report pursuant to
section 32.60(2)(c) which shall be due on February 1 of the calendar year following the
date the Department issued the approval of suitability.
3. Should the consistency of, or type of, amendment used in the composting process change,
then the Department shall be notified and additional steps may be required to ensure that
the handling and distribution of the final compost product does not create a nuisance.
4. Continue to perform sampling, analysis and monitoring of the compost on an on -going
basis as required in 310 CMR 32.13(6) and in accordance with the Department approved
sampling and analysis plan. Please note, the approved sampling and analysis plan
specifies that the first sample of each production year be split in the field to provide a
duplicate sample for analysis.
5. Please be advised, your facility must perform a TCLP within the next two years, and at
intervals not to exceed two years thereafter, in order to retain compliance with the
requirement that at least one TCLP be performed for every two year AOS renewal period.
6. This approval does not include approval to blend 1998 Type I compost with previously
approved Type 3 compost, which is also stockpiled at the composting facility. As per
your request, the review and classification of existing and future compost has been
expedited as the review of the blending proposal is held pending further direction from
the Town.
The Mansfield Board of Health, in a letter dated April 4, 2003, approved of the proposal
for Type I classification of Mansfield compost. This approval fulfills the obligation of 310 CMR
32.14(2) which requires the written concurrence of the board of health prior to Type I approval
by the Department.
The Department reserves the right to rescind, suspend or modify this approval by the
imposition of additional conditions or amendments to the stated conditions based on determining
any actual or potential adverse impacts resulting from the conduct of this project.
This Permit is an action of the Department. If you are aggrieved by this action, you may
request an adjudicatory hearing. A Notice of Claim for an Adjudicatory Heating must be made
in writing and postmarked within thirty (30) days of the date this permit was issued. Pursuant tc
310 CMR 1.01(6), the Notice of Claim shall state clearly and concisely the facts which are
grounds for the proceeding and the relief sought.
The Notice of Claim, along with a valid check payable to the Commonwealth of
Massachusetts in the amount of one hundred dollars ($100.0Q), must be mailed to:
Commonwealth of Massachusetts
Department of Environmental Protection
P.O. Box 4062
Boston, MA 02211
The Notice will be dismissed if the filing fee is not paid, unless the appellant is exempt or
granted a waiver as described in 310 CMR 4.00.
If you have any questions, please contact Mr. Richard Rondeau at (508) 946-2816.
Very truly yours,
W .L'f
cc: Mr. Lee Azinheira, Town Engineer
Town of Mansfield
6 Park Row
Mansfield, MA 02048
Protection
cc: Mr. Scott Leite, Agent
Board of Health
6 Park Row
Mansfield, NIA 02048
Mr. Edward C. Sanderson
Camp Dresser & McKee, Inc.
One Cambridge Place, 50 Hampshire St.
Cambridge, MA 02139
DEP-Millbury
ATTN: Larry Polese
TOWN OF MANSFIELD, MASSACHUSETTS
Six Park Row, Mansfield, MA 02048
April 4, 2003
Mr. Richard Rondeau
Department of Environmental Protection
Southeast Regional Office
20 Riverside Drive
Lakeville, MA 02347
RE: MANSFIELD—Board of Health Concurrence, BRPWP29, Residuals
Approval of Suitability, 1998, 2001, 2002 and Future Compost Production,Sludge
Composting facility, Off Fruit Street, Transmittal No. W035188
Dear Mr. Rondeau,
The Board of Health has reviewed the proposal for sale of composted sludge and
approves of the proposed project.
If I can be of further assistance, please do not hesitate to contact me.
C: Lee Azinheira, Director of Department of Public Works
Kenneth Hackett, Wastewater Operations Manager
Tim Gould, Agresource, Inc.
CDM
One Cambridge Place, 50 Hampshire Street
Cambridge, Massachusetts 02139
tel: 617 452-6000
fax: 617 452-8000
February 27, 2003
Mr. Scott Leite, Health Agent
Board of Health
6 Park Row
Mansfield, Massachusetts 02048
Subject: Town of Mansfield, Massachusetts
BRPWP29 Approval of Suitability
Compost Production at the Wastewater Biosolids Composting Facility
Dear Mr. Leite:
In the near future, the Town of Mansfield will be applying to the Department of
Environmental Protection (DEP), Division of Water Pollution Control, for an
Approval of Suitability for Type I residual sludge compost produced at the Mansfield
Wastewater Biosolids Composting Facility located on Fruit Street in Mansfield. In
compliance with 310 CMR 32.14(1)(c), a copy of the subject application will be
forthcoming to the Board of Health.
310 CMR 32.14(2) states that the DEP shall not approve the use, sale, or distribution or
offering for use, sale, or distribution of Type I sludge without the written concurrence
of the board of health of the city or town in which the owner's or operator's facility is
located, provided that such concurrence is not unreasonably withheld. Said board of
health shall be deemed to have given such concurrence unless it gives written notice
to the contrary to the Department not later than 35 days after the date of notice given
the board of health pursuant to the first sentence of 310 CMR 32.14(2)."
The Town of Mansfield, or its consultant, Camp Dresser & McKee, will be forwarding
a copy of the application of the Approval of Suitability. If you have any questions in
the meantime, please contact me at 617-452-6664.
CASanderson\0201-34021 Mansfield\Contract 42\Approval of Suitability\ApplicatlonWH notilicationdoc
consulting • engineering - construction • operations
Mr. Scott Leite
February 27, 2003
Page 2
We look forward to working with the Board of Health and expediting the application
process.
Very truly yours,
Edward C. Sanderson
Project Engineer
Camp Dresser & McKee Inc.
cc: Rick Rondeau - DEP Lakeville
Lee Azinlieira - Town of Mansfield
Ken Hackett - Town of Mansfield
Jolu1 Donovan - CDM
CASanderson\0201-34021 Mansfield\Contract #2\Approval of Suilabllity\AppllcalioN80H-notificalion.doc
COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS
DEPARTMENT OF ENVIRONMENTAL PROTECTION
SOUTHEAST REGIONAL OFFICE
20 RIVDRSIDR DRIVE, LAI EVILLR, MA 02347
JANR SWIFT
Governor
1
Mr, Lee Azinheira, Director
Department of Public Works
Town of Mansfield
6 Park Row
Mansfield, Massachusetts 02048
Dear Mr. Azinheira:
BOB DURAND
i
Secretary
�. �• -� 7002 i LAURUN A. LISS
/! Commissioner
January 31,
RE: 1VMANSFIELD--Water Pollution
Control, Town of Mansfield
Composting Facility Operation and
Maintenance Manual
The Department is in receipt of the Composting Facility Operation and Maintenance
Manual, dated September 2001 prepared by your consultant, Camp Dresser & McKee, Inc., on
behalf of the Town of Mansfield regarding the sludge composting facility located off Fruit Street
in the Town of Mansfield. The Town of Mansfield was issued a plan and specifications approval
for the year round composting facility in a letter dated February 8, 1999, from the Department. In
submitting this Operation and Maintenance Manual, the Town is seeking to comply with
condition #2 of that approval.
The Department has completed its review of the Composting Facility Operation and
Maintenance Manual and has determined that it properly and adequately complies with the
requirements of condition 92 of the Department's composting facility approval dated February 8,
1999. The Department recommends the following additions to the Operation and Maintenance
Manual:
o The maintenance schedules reconunended by the equipment manufacturers of the
composting equipment should be included as part of this Manual.
o All routine maintenance at the composting facility should be included in the wastewater
treatment plant's preventative maintenance (PM) program.
o The Sampling and Testing section of the Operation and Maintenance Manual should
include provisions for TCLP testing as required for Approval of Suitability submittal to the
Department.
This infornmtion is available in alleinale fo rnal by calling our ADA Coordinator al (617) 574-6872,
DEP on the World Wide Web: http://w ,mass.gov/dep
10 Printed on Recycled Paper
Please be advised, the Department recognizes the Operation and Maintenance Manual as
a "living document" and thereby encourages the Town to update this document on a regular
basis, as needed, to ensure that any operational changes are reflected and documented for future
reference. The Department should be provided any such updates but inclusion in the Manual, in
and of itself, will not require submittal for approval. Please refer to the facility approval, 310
CMR 32:00 and 314 CMR 12.00 for requirements for approval by the Department for operational
changes or other facility modifications.
Please be aware, in accordance with 310 CMR 32.00, no beneficial use of this material
shall be allowed without a currently valid Approval of Suitability from the Department. The
Mansfield Board of Health shall be copied on all correspondence regarding operation of the
composting facility and must be copied on the future approval of suitability application to the
Department. The Department will be seeking their concurrence before any Type I classification
of this material is granted.
If you have any questions, please contact Mr. Richard Rondeau at (508) 946-2816.
Very truly yours,
Protection
G/RR/bh
cc: Mr. John D. Sullivan, Jr., Town Engineer
Town of Mansfield
6 Park Row
Mansfield, MA 02048
Mr. Ken Hackett, Plant Manager
Department of Public Works
6 Park Row
Mansfield, MA 02048
Mr. David F. Young
Camp Dresser & McKee Inc.
One Cambridge Place
50 Hampshire St.
Cambridge, MA 02139
Mr. Scott Leite, Agent
Board of Health
6 Park Row
Mansfield, MA 02048
DEP-SERO .
ATTN: David DeLorenzo
Joseph Shepherd
COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS
DEPARTMENT OF ENVIRONMENTAL PROTECTION
SOUTHEAST REGIONAL OFFICE
ARGEO PAUL CELLUCCI BOB DURAND
Secretary
Governor
JANE SWIFT
Lieutenant Governor
-
f /`` ,
DAVID B. STRUHS
Conunissioner
i i �
✓ tg
February
8, 1999
Mr. Lee Azinheira,
Town Engineer
RE:
MANSFIELD--Water Pollution Control,
Town of Mansfield
BRPWP45, Modifications to Residuals
6 Park Row
Management Facilities, Plans and
Mansfield, Massachusetts
02048
Specifications, Sludge Composting
Facility, Off Fruit Street,
Transmittal No. 124182
Dear Mr. Azinheira:
In a letter dated March 5, 1998, the Department of Environmental
Protection issued conditional approval ofyour request to perform year round
composting at the existing Town of Mansfield composting facility off Fruit
Street. Currently, the Town operates the composting facility on a seasonal
basis from May to October. This letter is written to address condition.l, of
that approval which required submittal of plans for all structural, equipment
and.process control changes once available.
In a meeting on November 24, 1998, your consultant, Camp Dresser and
McKee, submitted plans and specifications in order, to gain Department
approval and fulfill the above -mentioned condition. The submitted plans,
consisting of Contract No. 1, 10 sheets which encompass demolition and
structural modifications, and Contract No. 2, 4 sheets which encompass
mechanical and electrical instrumentation modifications, are titled as
follows:
TOWN OF MANSFIELD, MASSACHUSETTS
.COMPOSTING FACILITY MODIFICATIONS
CONTRACT No. 1
NOVEMBER, 1998
TOWN OF MANSFIELD, MASSACHUSETTS
COMPOSTING FACILITY MODIFICATIONS
CONTRACT No. 2
NOVEMBER, 1998
CAMP DRESSER & McKEE INC.
ENVIRONMENTAL SERVICES
CAMBRIDGE, MASSACHUSETTS
20 Riverside Drive 0 Lakeville, Massachusetts 02347 0 FAX(508) 947-6557 0 Telephone (508) 946-2700
-2-
The Town wishes to expand upon it's successful seasonal composting
operation in order to eliminate landfilling of sludge during the winter
months and produce a compost material which has a beneficial use. This would
also extend the life of their current sludge landfill while maintaining
redundancy via landfilling.
The plans include the addition of two pre-engineered structures to cover
and enclose the main active composting area and the screening area. The
active composting area enclosure is proposed as a 125 foot by 150 foot
structure which will house all active compost piles. The screening enclosure
is proposed as a 140 foot by 30 foot structure and will act as a storage area
for bulking material and will house a new trommel screen the town proposes to
purchase.
Also proposed are larger blowers and the addition of instrumentation and
electrical improvements. The ten existing one horsepower blowers are to be
replaced with five horsepower blowers which will be activated by an
instrument package that includes a temperature probe to pace the blowers
accordingly. Although not currently required, the blower exhaust _piping is
configured so as to provide for odor control measures and equipment in the
future if needed. No modifications are proposed for the final compost curing
area and/or final product storage area.
After reviewing all pertinent information, the Department .hereby
approves the physical modifications as proposed in the submitted plans for
the year round composting facility at the existing seasonal residuals
composting facility off Fruit Street in Mansfield,, Massachusetts, subject to
the following terms and conditions:
1. Only condition 1. of the March 5, 1998 Department approval has been
satisfied with the issuance of this letter. All other conditions
of the.March 5, 1998, Department approval letter remain in effect
as approval of a year round, versus seasonal, composting operation.
2. An amendment to, or a modification of the existing operations and
maintenance manual specifically addressing year round compost
operations shall be submitted to this office for review and should
include, at a minimum, the information listed below, items a.
through i., as required by 314 CMR 12.04:(1). A draft must be
submitted; for Department comments thirty (30) days prior to
modified compost facility operation. Once comments are received,
a final must be submitted to this office within ninety (90) days.
a. Introduction
b. Permits and Standards
C. Description, Operation and Control of Wastewater Treatment
Facilities
d. Sampling and Laboratory Analysis
e. Records and Reporting
-3-
f. Maintenance
g. Emergency Operating and Response Program (shall include an
Emergency Action and Contingency Plan)
h. Safety
i. Utilities
3. If compost operations create nuisance and/or odor problems/
complaints, then no new composting piles shall be constructed and
odor/nuisance sources shall be identified and mitigated. Permanent
corrective measures, as applicable, shall be submitted to the
Department for evaluation and concurrence before compost operations
can resume. Odor/nuisance mitigation measures shall be part of the
Contingency Plan which is to be addressed through item 2.g. above.
4. The Department approved Sampling and Analysis Plan for ongoing
compost classification, issued December 11, 1997, shall remain in
effect and be adhered to for year round composting operations.
Please be advised, this will result in an increase in the number of
samples per year based on quarterly sampling of year round, versus
seasonal, composting.
5.. Written certification from the engineer, along with as -built plans
which are stamped and signed by a Massachusetts Registered
Professional Engineer, that all construction is in accordance with
the plans must be submitted to this office prior to operation of
the compost facility. Also, the Town shall provide notice to the
Southeast Regional Office so that a DEP representative may conduct
a site visit prior to start-up of compost operations.
6. As the instrumentation package includes only one temperature probe
per two active compost piles, it will be necessary to continue to
perform manual temperature probing at various points, at various
times daily, within each compost pile in order to demonstrate
compliance with 310 CMR 32.81, Acceptable Processes for Additional
Pathogen Reduction.
7. As final compost curing will not occur within one of the proposed
enclosures, measures shall be taken to ensure that adverse weather
conditions do not affect the quality, consistency and reduced
pathogen content of the compost prior to sale and/or distribution.
The Department reserves the right to rescind, suspend or modify this
approval by the imposition of additional conditions or amendments to the
stated conditions based on determining any actual or potential adverse
impacts resulting from the conduct of this project.
This Permit is an action of the Department. If you are aggrieved by
this action, you may request an adjudicatory hearing. A Notice of Claim for
an Adjudicatory Hearing must be made in writing and postmarked within thirty
(30) days of the date this permit was issued. Pursuant to 310 CMR 1.01(6),
the Notice of Claim shall state clearly and concisely the facts which are
grounds for the proceeding and the relief sought.
The Notice of Claim, along with a valid check payable to the
Commonwealth of Massachusetts in the amount of one hundred dollars ($100.00),
must be mailed to:
Commonwealth of Massachusetts
Department of Environmental Protection
P.O. Box 4062
Boston, MA 02211
The Notice will be dismissed if the filing fee is not paid, unless the
appellant is exempt or granted a waiver as described in 310 CMR 4.00.
If you have any questions, please contact Mr. Richard Rondeau at (508)
946-2816 or Mr. Joseph Shepherd at (508) 946-2756.
Very truly yours,
J ck Hamm, Chief
unton River Watershed
H/RR/bh
cc: Mr. Kenneth Hackett
Town of Mansfield WPCF
50 West Street
Mansfield, MA 02048
Ms. Jane E. Madden
Camp Dresser & McKee Inc.
10 Cambridge Center
Cambridge, MA 02142
Mr. Ken Bohlin
Camp Dresser & McKee Inc.
10 Cambridge Center
Cambridge, MA 02142
Mr. Scott Leite, Agent
Board of Health
50 West Street
Mansfield, MA 02048
DEP-SERO
ATTN: Jeffrey Gould
DEP-Millbury
ATTN: Larry Polese
DEP-SERO
ATTN: John Winkler
COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS
DEPARTMENT OF ENVIRONMENTAL PROTECTION
SOUTHEAST REGIONAL OFFICE
ARGEO PAUL CELLUCCI TRUDY COXE
Governor _ t Secretary
lJ tti
'1 DAVID B. STRUHS
Commissioner
March 5, 1998
Mr. Lee Azinheira, Town Engineer RE: MANSFIELD--Water Pollution Control,
Town of Mansfield BRPWP45, Modifications to Residuals
6 Park Row Management Facilities, Sludge
Mansfield, Massachusetts 02048 Composting Facility, Off Fruit
Street, Transmittal No. 124182
Dear Mr. Azinheira:
In a letter dated November 11, 1997, your consultant, Camp Dresser &
McKee Inc., acting on behalf of the Town of Mansfield, filed a request for
approval of modifications to the existing sludge composting facility
operated by the Town of Mansfield off Fruit Street under Transmittal Number
124182. In general, the Town is seeking permission to operate a year round
composting facility. To date, the Town has operated the existing
composting facility on a seasonal basis from May to October. The Town
wishes to expand upon it's successful seasonal composting operation in
order to eliminate landfilling of sludge during the winter months and
produce a compost material which has a beneficial use. This would also
extend the life of their current sludge landfill while maintaining
redundancy via landfilling.
Currently, primary and secondary sludges generated at the plant are
co -thickened, conditioned with ferric chloride and lime, and then dewatered
at the treatment plant site to a solids content of 32 to 39 percent. The
sludge is then transported to the Fruit Street composting site.
Approximately 1,370 dry tons of sludge are generated annually.
Composting at the Fruit Street site is performed utilizing the aerated
static pile method. Sludge is mixed with wood chips volumetrically on a 1
part sludge to 2 part new/recycled wood chip mix. The pile is aerated in
both the positive and negative mode to maintain an aerobic environment,
control pile temperature, to assure proper pathogen reduction, and reduce
moisture content. After approximately 30 days in the aerated pile, compost
is transported to the screen for wood chip reclamation. The compost is
then taken to the non -aerated curing area where it resides for
approximately 90 days before being moved to the finished compost area.
20 Riverside Drive • Lakeville, Massachusetts 02347 0 FAX (508) 947-6557 0 Telephone (508) 946.2700
-2-
In order to facilitate year round composting of wastewater treatment
plant residuals, select areas of the composting facility will be partially
enclosed with new structures. These structures, either wood or metal, will
cover up to 17,000 square feet and will encompass the active composting and
screening areas. Also, the existing blower system will be upgraded, along
with associated electrical improvements, and the exhaust from the blower
system will be manifolded to collect and transport condensate from the
system when operating in the negative mode.
In reviewing this proposal, the Department has also considered the
following:
1. In a letter dated December 29, 1997, the Department of
Environmental Protection, Southeast Regional Office, Division of
Air Quality determined that increased emissions from year round
composting will be relatively insignificant and therefore not
require Department approval.
2. The Town has successfully operated a seasonal composting
operation since 1987 with almost no odor complaints or reported
operational problems.
3. The Town has demonstrated that it can produce compost which meets
Department requirements for classification as Type 1 material
under 310 CMR 32.00.
After review of all pertinent information, the Department finds no
reason to prohibit year round composting at the existing Fruit Street
residuals facility at this time and hereby determines that year round
composting is permissible subject to the following terms and conditions:
1. It is the Department's understanding that year round composting
will not take place until roof structures and upgraded blower
systems are designed and in place. As such, the Town shall
submit plans to the Department, which are stamped and signed by a
Massachusetts Registered Professional Engineer, for all
structural, equipment and process control changes. The Town must
receive approval from the Department for these modifications
prior to implementation of year round composting.
2. An amendment to, or a modification of the existing operations and
maintenance manual specifically addressing year round compost
operations shall be submitted to this office for review and
should include, at a minimum, the information listed below, items
a. through i., as required by 314 CMR 12.04:(1). A draft must be
submitted for Department comments thirty (30) days prior to
modified compost facility operation. Once comments are received,
a final must be submitted to this office within ninety (90) days.
a. Introduction
b. Permits and Standards
C. Description, Operation and Control of Wastewater Treatment
Facilities
-3-
d. Sampling and Laboratory Analysis
e. Records and Reporting
f. Maintenance
g. Emergency Operating and Response Program (shall include an
Emergency Action and Contingency Plan)
h. Safety
i. Utilities
3. If composting during the winter months creates nuisance and/or
odor problems/complaints, then composting shall cease immediately
and corrective measures shall be evaluated and approved by the
Department before compost operations can resume.
4. The Department approved Sampling and Analysis Plan for ongoing
compost classification, issued December 11, 1997, shall remain in
effect and be adhered to for year round composting operations.
Please be advised, this will result in an increase in the number
of samples per year based on quarterly sampling of year round,
versus seasonal, composting.
The Department reserves the right to rescind, suspend or modify this
approval by the imposition of additional conditions or amendments to the
stated conditions based on determining any actual or potential adverse
impacts resulting from the conduct of this project.
This Permit is an action of the Department. If you are aggrieved by
this action, you may request an adjudicatory hearing. A Notice of Claim
for an Adjudicatory Hearing must be made in writing and postmarked within
thirty (30) days of the date this permit was issued. Pursuant to 310 CMR
1.01(6), the Notice of Claim shall state clearly and concisely the facts
which are grounds for the proceeding and the relief sought.
The Notice of Claim, along with a valid check payable to the
Commonwealth of Massachusetts in the amount of one hundred dollars
($100.00), must be mailed to:
Commonwealth of Massachusetts
Department of Environmental Protection
P.O. Box 4062
Boston, MA 02211
The Notice will be dismissed if the filing fee is not paid, unless the
appellant is exempt or granted a waiver as described in 310 CMR 4.00.
s�
If you have any questions, please contact Mr. Richard Rondeau at (508)
946-2816.
Very tru yours,
a k Ham , Chief
nton Watershed
H/RR/rr
CC: Mr. Kenneth Hackett
Town of Mansfield WPCF
50 West Street
Mansfield, MA 02048
Ms. Jane E. Madden
Camp Dresser & McKee Inc.
10 Cambridge Center
Cambridge, MA 02142
Mr. Scott Leite, Agent
Board of Health
50 West Street
Mansfield, MA 02048
DEP-SERO
ATTN: Jeffrey Gould
DEP-Millbury
ATTN: Larry Polese
DEP-SERO
ATTN: John Winkler
ARGEO PAUL CELLUCCI
Governor
COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS
DEPARTMENT OF ENVIRONMENTAL PROTECTION
SOUTHEAST REGIONAL OFFICE
April 6, 1998
TRUDY COXE
Secrelary
DAVID B. STRUHS
Commissioner
Mr. Scott Leite, Agent RE: MANSFIELD--Administrative Review,
Board of Health BRPWP29, Residuals Approval of
50 West St. Suitability, 1996 and 1997 Compost
Mansfield, Massachusetts 02048 Production, Sludge Composting
Facility, Off Fruit Street,
Transmittal No. 137135
Dear Mr. Leite:
The Town of Mansfield has applied to the Department of Environmental
Protection, Division of Water Pollution Control, for an Approval of
Suitability for Type 1 residual sludge compost produced in 1996 and 1997 at
the composting facility. It is the understanding of the Department that
the Mansfield Board of Health has received a copy of the subject
application, in compliance with 310 CMR 32.14(1)(e).
310 CMR 32.14(2) states that "...The Department shall not approve the
use, sale, or distribution or offering for use, sale, or distribution C)f
Type I sludge without the written concurrence of the board of health of the
city or town in which the owner's or operator's facility is located,
provided that such concurrence is not unreasonably withheld. Said board of
health shall be deemed to have given such concurrence unless it gives
written notice to the contrary to the Department not later than 35 days
after the date of notice given the board of health pursuant to the first
sentence of 310 CMR 32.14(2)."
Accordingly, the Department requests that the Board review the subject
proposal and indicate in writing its approval or disapproval of the
proposed project. Such response should be sent to Richard Rondeau of my
staff at the below address.
If you have any questions, please contact Richard Rondeau at (508)
946-2816.
H/RR/bh
Very truly yours,
J ck Ham iiefnton Wathed
20 Riverside Drive 9 Lakeville, Massachusetts 02347 • rAX(508) 947-6557 0 Telephone (508) 946-2700
-2-
cc: Mr. Lee Azinheira, Town Engineer
Town of Mansfield
6 Park Row
Mansfield, MA 02048
Mr. Kenneth Hackett
Town of Mansfield WPCF
50 West St.
Mansfield, MA 02048
Ms. Yuehlin Lee
Camp Dresser & McKee Inc.
10 Cambridge Center
Cambridge, MA 02142
DEP-MILLBURY
ATTN: Larry Polese
COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS
DEPARTMENT OF ENVIRONMENTAL PROTECTION
SOUTHEAST REGIONAL OFFICE
ARGEO PAUL CELLUCCI
Governor
TRUDY COXE
Secretary
DAVID B. STRUHS
Commissioner
6 .1T �ay 14, 1998
Mr. Kenneth F. Hackett RE: MANSFIELD--Water Pollution Control,
Town of Mansfield BRPWP29, Residuals Approval of
6 Park Row Suitability, 1996 and 1997 Compost
Mansfield, Massachusetts 02048 Production, Sludge Composting
Facility, Off Fruit Street,
Transmittal No. 137135
Dear Mr. Hackett:
In a letter dated March 11, 1998, the Town of Mansfield, filed an
application with documentation prepared by your consultant, Camp Dresser &
McKee Inc., for Type I classification of compost produced from Mansfield
Water Pollution Control Facility sludge and currently stockpiled at the
Town of Mansfield Composting Facility off Fruit Street in the Town of
Mansfield, Massachusetts. An application for an Approval of Suitability
was filed under Transmittal No. 137135 and contained the following
supplementary documentation:
Temperature monitoring data for the 1996 and 1997 compost piles.
Ten sets of laboratory test data representing compost produced in
1996 and 1997. This data includes eight samples, including three
composite and one field duplicate for each year, for parameters
listed in 310 CMR 32.13(5)(a) as well as organic parameters.
Results from two TCLP (Toxicity Characteristic Leaching
Procedure) tests, one for each production year to be classified,
were also provided.
The compost is stockpiled by year and represents compost produced
seasonally in 1996 and 1997. There is approximately 1,900 cubic yards of
sludge compost which was produced in 1996 and approximately 2,000 cubic
yards produced in 1997.
The Department has reviewed the information submitted and has
concluded that sampling, analysis and reporting has successfully been
completed pursuant to the requirements of 310 CMR 32.00. Also, as a result
of its review, the Department has made the following determinations:
All analyses have been conducted in accordance with the sampling
and analysis plan approved by the Department on December 11,
1997.
20 Riverside Drive 0 Lakeville, Massachusetts 02347 0 FAX (508) 947-6557 • Telephone (508) 946-2700
WAS
2. Sufficient data records have been submitted to allow the
Department to classify the 1996 and 1997 compost.
3. TCLP test data has demonstrated that the compost is non -hazardous
pursuant to 310 CMR 30.00.
4. Temperature data obtained from the compost piles for which the
Type I approval is being sought have demonstrated that PFRP
(Processes to Further Reduce Pathogens) requirements have been
met utilizing static aerated pile, high temperature composting,
in accordance with 310 CMR 32.81(1).
5. Results of all bulk analysis of the material for the land
application parameters have been reported appropriately. In all
samples, the final product meets the criteria for Type I as set
forth in 310 CMR 32.12.
As a result of the Department's review, the Town of Mansfield is
granted Type I approval for finished compost produced in 1996 and 1997 and
currently stockpiled at the composting facility. This approval is subject
to the following terms and conditions:
1. This is a one time approval for compost produced in 1996 and 1997
and currently stockpiled at the Town of Mansfield Compost
Facility.
2. In its application for approval of suitability, the Town
indicated a variety of potential users of the Type I compost. In
all cases, the Town shall comply with the labelling and other
requirements of 310 CMR 32.51, "Requirements for sale or
distribution of Type I sludge/compost", which states:
a) No person shall sell or distribute, or offer for use, sale,
or distribution any Type I sludge/compost unless, pursuant
to 310 CMR 32.00, the Department has approved such sludge/
compost as Type I sludge and that approval is valid at the
time the Type I sludge/compost is sold or distributed, or
offered for use, sale, or distribution.
b) No person shall obtain Type I sludge/compost unless such
sludge/compost has a valid approval of suitability.
c) Labelling of Type I Sludge/Compost. Each container in which
Type I sludge/compost is sold, distributed, or transported
or offered for use, sale, or distribution shall itself
prominently display or, if such display is not practicable,
shall be accompanied by a shipping paper which shall
prominently display the following:
i) identification of the material as Type I sludge
(compost).
ii) the date of issuance of the Department Approval of
Suitability for the Type I sludge/compost and the
expiration date thereof.
-3-
iii) instructions for land applying the material in
accordance with proper agricultural practice,
including, but not limited to, identification of proper
agronomic application rates which shall not cause
exceedence of the nitrogen requirements of the crop to
be grown or intended to be grown.
iv) Type I sludge/compost containing more than 10 parts per
million of molybdenum shall be accompanied by a written
warning that the sludge should not be used on pasture
lands subject to grazing or on lands where crops are
grown or intended to be grown for forage. Use of the
sludge/compost under these circumstances may result in
forage crops containing levels of molybdenum which are
toxic to ruminants.
v) all other instructions and information required by law
3. In accordance with the provisions of 310 CMR 32.11(6), the use,
sale and distribution or offering of use, sale and distribution
of the compost as a commercial fertilizer or as a soil
conditioner is prohibited, except in compliance with the
licensing requirements of the Massachusetts Department of Food
and Agriculture (MGL c. 128, s.64).
4. Record Keeping. The Town shall comply with all the record
keeping requirements of 310 CMR 32.60, including the submission
to the Department of an annual report pursuant to section
32.60(2)(c) which shall be due on February 1 of the calendar year
following the date the Department issued the approval of
suitability until such time as all material hereby classified is
utilized. Upon utilization of all material, the report shall be
submitted within 30 days or by February 1, whichever is sooner.
S. In seeking future approval of compost classification, perform
sampling, analysis and monitoring of the compost on an on -going
basis as required in 310 CMR 32.13(6) and in accordance with the
Department approved sampling and analysis plan dated December 11,
1997,
The Department reserves the right to rescind, suspend or modify this
approval by the imposition of additional conditions or amendments to the
stated conditions based on determining any actual or potential adverse
impacts resulting from the conduct of this project.
The Mansfield Board of Health, in a letter dated May 13, 1998,
approved of the proposal for classification of Mansfield compost as
proposed and acted upon by this approval letter. This approval fulfills
the obligation of 310 CMR 32.14(2) which requires the written concurrence
of the board of health prior to Type I approval by the Department.
This Permit is an action of the Department. If you are aggrieved by
this action, you may request an adjudicatory hearing. A Notice of Claim
for an Adjudicatory Hearing must be made in writing and postmarked within
thirty (30) days of the date this permit was issued. Pursuant to 310 CMR
1.01(6), the Notice of Claim shall state clearly and concisely the facts
which are grounds for the proceeding and the relief sought.
The Notice of Claim, along with a valid check payable to the
Commonwealth of Massachusetts in the amount of one hundred dollars
($100.00), must be mailed to:
Commonwealth of Massachusetts
Department of Environmental Protection
P.O. Box 4062
Boston, MA 02211
The Notice will be dismissed if the filing fee is not paid, unless the
appellant is exempt or granted a waiver as described in 310 CMR 4.00.
If you have any questions, please contact Mr. Richard Rondeau at (508)
946-2816.
Jaun
ryck ton Watershed
H/RR/bh
CC: Mr. Lee Azinheira, Town Engineer
Town of Mansfield
6 Park Row
Mansfield, MA 02048
Mr. Dan Clifford, Director
Department of Public Works
6 Park Row
Mansfield, MA 02048
Mr. William Williams, Town Manager
Town Hall
6 Park Row
Mansfield, MA 02048
Ms. Yuelin Lee
Camp Dresser & McKee Inc.
10 Cambridge Center
Cambridge, MA 02142
Mr. Scott Leite, Agent
Board of Health
6 Park Row
Mansfield, MA 02048
-5-
cc: DEP-SERO
ATTN: Jeffrey Gould
DEP-MILLBURY
ATTN: Larry Polese
TOWN OF MANSFIELD, MASSACHUSETTS
50 West Street, Mansfield, MA 02048
May 13, 1998
Mr. Jack Hamm, Chief Taunton Watershed
20 Riverside Drive
Lakeville, MA 02347
RE: MANSFIELD--Administrative Review, BRPWP29, Residuals Approval of
Suitability, 1996 and 1997 Compost Production, Sludge Composting Facility, Off
Fruit Street
Dear Mr. Hamm,
The Board of Health has reviewed the above referenced proposal and approves of
the proposed project.
If I can be of assistance, please do not hesitate to contact me.
9Le
uly,
ite, Health Agent
C: Lee Azinheira, Town Engineer
ARGEO PAUL CELLUCCI
Governor
COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS
DEPARTMENT OF ENVIRONMENTAL PROTECTION
SOUTHEAST REGIONAL OFFICE
April 6, 1998
TRUDY COXE
Secretary
DAVID B. STRUHS
Commissioner
Mr. Kenneth F. Hackett RE: MANSFIELD--Administrative Review,
Town of Mansfield BRPWP29, Residuals Approval of
6 Park Row Suitability, 1996 and 1997 Compost
Mansfield, Massachusetts 02048 Production, Sludge Composting
Facility, Off Fruit Street,
Transmittal No. 137135
Dear Mr. Hackett:
The Department has completed its Administrative Review of the permit
application listed above and determined that the application is
administratively complete. Accordingly, the Department will begin its
Technical Review.
According to 310 CMR 4.04, the Department now has sixty (60) days to
complete its Technical Review and issue a final decision to grant or deny
the permit.
Provided your application is technically adequate, and none of the
contingencies outlined in 310 CMR 4.04 occur, the Department will issue a
final decision within the timeframes listed above.
If you have any questions, please contact Richard Rondeau at (508)
946-2816.
H/RR/bh
CC: Mr. Lee Azinheira,
Town of Mansfield
6 Park Row
Mansfield, MA 02048
Very trul
a k Hamm, Chief
a nton Watershed
Town Engineer
Mr. Dan Clifford, Director
Department of Public Works
6 Park Row
Mansfield, MA 02048
20 Riverside Drive • Lakeville, Massachusetts 02347 0 FAX(508) 947.6557 • Telephone (508) 946.2700
sX
CC: Mr. William Williams, Town Manager
Town Hall
6 Park Row
Mansfield, MA 02048
Ms. Yuelin Lee
Camp Dresser & McKee Inc.
10 Cambridge Center
Cambridge, MA 02142
Mr. Scott Leite, Agent
Board of Health
6 Park Row
Mansfield, MA 02048
DEP-MILLBURY
ATTN: Larry Polese
COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS
DEPARTMENT OF ENVIRONMENTAL PROTECTION
SOUTHEAST REGIONAL OFFICE
ARCED PAUL CELLUCCI TRUDY COXE
Governor ��"" �,} f Secretary
DAVID B. STRUHS
Commissioner
November 23, 1998
Mr. Lee Azinheira, Town Engineer RE: MANSFIELD--Water Pollution Control,
Town of Mansfield Compost Blending Proposal,
6 Park Row Classification and Utilization
Mansfield, Massachusetts 02048
Dear Mr. Azinheira:
In a letter dated September 22, 1998, your consultant, Camp Dresser &
McKee Inc., acting on behalf of the Town of Mansfield, submitted a proposal
to the Department to produce a manufactured topsoil using Mansfield compost
for future use on a municipal recreational site in the Town of Mansfield.
The compost was produced at the Mansfield Composting Facility in 1991 and
1992. It was classified as Type 3 by the Department in an approval letter
dated October 16, 1998 and is currently stockpiled at the composting
facility. The town is seeking to produce a Type I material by blending with
topsoil in accordance with the Department's Blending Policy, No. 87-1.
This letter is written in response to the town's request for approval to
blend Type 3 compost with topsoil on a one to one volumetric basis.
Following blending at the compost facility site, the town will sample the
material in accordance with the Department approved sampling and analysis
plan dated February 14, 1996, and submit test results to the Department for
classification. If classified as Type I by the Department, the town will
utilize the blended compost for the construction of recreational fields at
the town's Memorial Park on Chauncy Street. At the fields the compost blend
is to be incorporated in the first six inches of topsoil. An identifiable
and designated market or end use of the final blended product is a
prerequisite for approval under the Blending Policy.
Currently there is approximately 6,000 cubic yards of compost classified
as Type 3 which is stockpiled at the compost facility site off Fruit Street.
Although this represents compost produced during the years 1987 through 1992,
it is only years 1991 and 1992, a total of 1,000 cubic yards of Type 3
material, which are the subject of this proposal and result in 2,000 cubic
yards of final blended product.
The Department has reviewed the information submitted and hereby concurs
with the feasibility of this proposal subject to the following conditions:
20 Riverside Drive 0 Lakeville, Massachusetts 02347 0 rAX(508) 947-6557 • Telephone (508) 946-2700
-2-
1. In order for the town to reach its goal of achieving Type I
classification and recreational field utilization, the town must
submit to the Department for approval, an application for Approval
of Suitability (BRPWP29) for the new compost blend.
2. Blending will be performed at the compost facility site only.
3. No beneficial use of this material, as proposed, shall be allowed
until a new Approval of Suitability (Type 1) is granted by the
Department.
4. As proposed, testing of the final blended product shall be
performed in accordance with the December 11, 1997, Department
approved sampling and analysis plan and must include all
parameters, not just cadmium and copper. In accordance with this
sampling and analysis plan, three representative composite samples
will be collected. One of these composite samples will be split in
the field for quality assurance/quality control purposes thereby
producing a total of four samples. Each sample will be composited
from eight sub -samples collected from different locations in the
final blended compost at a depth of three to six feet. Parameters
to be sampled for shall include those listed in 310 CMR 32.13(5).
As it has already been determined the compost is non -hazardous in
accordance with 310 CMR 30.00, no additional TCLP need be
performed.
5. All testing must be performed by a Massachusetts certified
laboratory which is certified to perform all requisite analysis.
6. The Mansfield Board of Health shall be copied on all correspondence
and must be copied on the future approval of suitability
application to the Department. The Department will be seeking
their concurrence before any Type I classification of this
material.
7. Temperature data for all compost piles which are to be classified
must accompany the chemical quality data at the time an Application
for Approval of Suitability is submitted. This information serves
to verify the degree of stabilization provided by the active
compost process.
8. If the compost appears highly variable during blending or sampling,
the Department shall be notified and additional samples may be
required in order to determine the classification of the final
compost blend material.
9. Public access to the application site shall be restricted for a
period of one year from the time manufactured topsoil is applied to
the entire field.
Please be advised, the Department recommends that the town test any
topsoil to be used as part of the blending process in order to avoid negative
impacts to the final blended product. .
-3-
Please be aware, any future proposal to blend currently classified Type
3 material to meet Type 1 standards should not include material produced in
1987 as temperature records have not been made available for this year and,
therefore, 310 CMR 32.12(1)(b) cannot be met.
The Department reserves the right to rescind, suspend or modify these
findings by the imposition of additional conditions or amendments to the
stated conditions based on determining any actual or potential adverse
impacts resulting from the conduct of this project.
This Permit is an action of the Department. If you are aggrieved by
this action, you may request an adjudicatory hearing. A Notice of Claim for
an Adjudicatory Hearing must be made in writing and postmarked within thirty
(30) days of the date this permit was issued. Pursuant to 310 CMR 1.bl(6),
the Notice of Claim shall state clearly and concisely the facts which are
grounds for the proceeding and the relief sought.
The Notice of Claim, along with a valid check payable to the
Commonwealth of Massachusetts in the amount of one hundred dollars ($100.00),
must be mailed to:
Commonwealth of Massachusetts
Department of Environmental Protection
P.O. Box 4062 -
Boston, MA 02211
The Notice will be dismissed if the filing fee is not paid, unless the
appellant is exempt or granted a waiver as described in 310 CMR 4.00.
If you have any questions, please contact Mr. Richard Rondeau at (508)
946-2816.
Very truyours,
r';
mm, Chief
Watershed
H/RR/bh
CC: Mr. Kenneth Hackett
Town of Mansfield WPCF
50 West Street
Mansfield, MA 02048
Mr. John F. Donovan, V.P.
Camp Dresser & McKee Inc.
10 Cambridge Center
Cambridge, MA 02142
Ms. Jane Madden
Camp Dresser & McKee Inc.
10 Cambridge Center
Cambridge, MA 02142
a
CC: Mr. Scott Leite, Agent
Board of Health
50 West Street
Mansfield, MA 02048
DEP-SERO
ATTN: Jeffrey Gould
Joseph Shepherd
DEP-Millbury
ATTN: Larry Polese
consulting
engineering
constructlon
operations
Camp Dresser & McKee Inc.
fen Cambridge Center
,ambridge, Massachusetts 02142
iel:617252-8000 Fax:617621.2565
[November 20,1997
Mr. Rick Rondeau
Department of Environmental Protection
Division of Water Pollution Control
20 Riverside Drive
Lakeville, Massachusetts 02347
X
�t2)'if
Subject: Town of Mansfield, Massachusetts
Application for Approval of Sampling and Analysis Plan (BRP WP 28)
DEP Transmittal No.137134
Dear Mr. Rondeau:
On behalf of the Town of Mansfield, Camp Dresser & McKee Inc. (CDM) is writing to notify
you of an amendment to the Application for Approval of Sampling and Analysis Plan
referenced above. Due to the Town's bidding requirements, a new laboratory has been
selected to provide analytical services for the proposed sampling and analysis plan.
The proposed analytical laboratory for this compost sampling and analysis plan is:
R.I. Analytical Laboratories, Inc.
41 Illinois Avenue
Warwick, RI 02888
(401)737-8500
Certification # M-RIO15
R.I. Analytical is certified in Massachusetts for all proposed analyses listed in Exhibit B of
the sampling and analysis plan.
As you know, the Town is proceeding with preliminary design to allow for year-round
composting at the existing compost facility. The design will be presented at a Town
meeting in April 1998. In order to build support for this beneficial project, we would like to
show that composting will provide the Town a marketable product that can bring in
revenue to offset some of the operational costs. To demonstrate the latter point, we believe
it is critical to show that the compost being produced at the Mansfield facility is of the
highest quality, with a DEP Type I classification, Therefore, we would like to complete the
current compost classification process by April 1998. To meet this deadline, we would need
to sample in early December and submit the Approval of Suitability application in January
1998. We would greatly appreciate your efforts in expediting DEP's review of the sampling
and analysis plan, and the general review process for the Approval of Suitability, so that we
could meet this proposed schedule.
201-22245-RT.TSKI
CW Camp Dresser & McKee Inc.
Mr. R. Rondeau
November 20,1997
Page 2
Please call me at (617) 252-8247 if you have any questions on the above or if you need any
further information to facilitate your review of the sampling and analysis plan.
Very truly yours,
CAMP DRESSER & McKEE INC.
r
Yuehlin Lee
Project Engineer
YL/mom
cc: K. Hackett, Mansfield
L. Azinheira, Mansfield
Mansfield Board of Health
L. Hersho Moss, CDM
J. Donovan, CDM
201-22246.RT.TSK1
COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS
DEPARTMENT OF ENVIRONMENTAL PROTECTION
SOUTHEAST REGIONAL OFFICE
ARGEO PAUL CELLUCCI
Governor
Mr. Kenneth F. Hackett
Town .of Mansfield
6 Park Row
Mansfield, Massachusetts 02048
Dear Mr. Hackett:
TRUDY COXE
Secretary
DAVID B. STRUHS
Corrunissioner
December 11, 1997
RE: MANSFIELD--Water Pollution Control,
BRPWP28, Residuals Sampling and
Analysis Plan, 1996 and Future
Production, Sludge Composting
Facility, Off Fruit Street,
Permit No. 137134
The Department is in receipt of a Sampling and Analysis Plan prepared
by your consultant, Camp Dresser & McKee, Inc., on behalf of the Town of
Mansfield regarding compost produced at the Mansfield Composting Facility,
off Fruit Street, in Mansfield, Massachusetts, under Transmittal No.
137134. The Town of Mansfield is seeking a Type I Approval of Suitability
(classification) for the compost which is intended to be distributed for
beneficial use in Massachusetts. This sampling and analysis plan is
proposed to encompass both existing production year 1996 and 1997 compost
and future compost production.
The Town currently has existing compost piles onsite for compost which
was generated in 1996 and 1997. .In order to characterize the existing
compost, three representative samples will be collected from each of the
1996 and 1997 composts for analysis. The first of the three composite
samples will be split in the field to provide a duplicate sample to serve
as a quality assurance/quality control mechanism for laboratory results.
Each composite sample will be created from eight grab samples. Each grab
sample will be collected from a different location in the compost pile at a
depth between three and six feet. These eight locations shall be selected
so as to best represent the entire range of compost in each pile. Analysis
will include one TCLP sample each for 1996 compost and 1997 compost.
For future compost production, a minimum of three composite samples
from the active composting area will be collected for analysis at a minimum
interval of one sample every three months. The first sample of each
production year will be split in the field to provide a duplicate sample
for analysis. Each sample will be composited from eight grab samples from
20 Riverside Drive 0 Lakeville, Massachusetts 02347 0 TAX(508) 947-6557 • Telephone (508) 946-2700
-2-
compost that has completed the compost process by demonstrating adherence
to the requirements of 310 CMR 32.81. Each grab sample will be collected
from a different, representative location in the compost pile at a depth
between three and six feet. Analysis will include at least one TCLP to
demonstrate that the compost in non -hazardous pursuant to 310 CMR 30.00.
Analytical services for compost testing are to be provided by R.I.
Analytical Laboratories, Inc., of Warwick, Rhode Island, which is certified
by the Commonwealth of Massachusetts to perform all requisite analysis.
The Department finds that this laboratory is acceptable to perform the
analysis required under 310 CMR 32.00 and the TCLP.
Please be advised, it is the responsibility of the consultant to
ensure that adequate sample volumes are collected commensurate with
laboratory distribution and testing as outlined above. Also, in reporting
data from the proposed analysis, the Department wishes to reinforce the
selection of detection limits which are at least as low as the
classification criteria set forth in 310 CMR 32.12. Detection limits which
are too high will invalidate the associated analytical results.
The Department has completed its review of the sampling and analysis
plan and has determined that it complies with the requirements of
Massachusetts Land Application Regulations. Based on this review, the
Department hereby approves the Plan with the following conditions and
understandings of approval:
1. All sampling and analysis shall be performed in accordance with
the application submitted by the applicant. Any proposed changes
must be approved by the Department prior to implementation.
2. Temperature data for all compost piles which are to be classified
must accompany the chemical quality data at the time an
Application for Approval of Suitability is submitted. This
information serves to verify the degree of stabilization provided
by the active compost process.
3. Parameters to be sampled for shall include those listed in 310
CMR 32.13(5) and Table 1 and Table 2 in the application for
Approval of Suitability (BRPWP29).
4. All analyses shall be performed using approved test procedures in
accordance with the List of Approved Test Procedures for Sludge
Parameters contained in the Sampling and Analysis Plan Approval
application (BRPWP28). Any deviations must be explained in the
application for Approval of Suitability (BRPWP29).
5. If the compost appears highly variable during sampling,
additional samples may be required in order to determine the
classification of the final compost material.
The Department reserves the right to rescind, suspend or modify this
approval by the imposition of additional conditions or amendments to the
stated conditions based on determining any actual or potential adverse
impacts resulting from the conduct of this project.
-3-
If you have any questions, please contact Mr. Richard Rondeau at
(508) 946-2816.
Very Itruly,Y
ruly,y urs,
Ja k Hamm, Chief
T unton Watershed
H/RR/cb
CC: Mr. Dan Clifford, Director
Department of Public Works
6 Park Row
Mansfield, MA 02048
Mr. William Williams, Town Manager
Town Hall
6 Park Row
Mansfield, MA 02048
Ms. Yuelin Lee
Camp Dresser & McKee Inc.
10 Cambridge Center
Cambridge, .MA 02142
Mr. Scott Leite, Agent
Board of Health
6 Park Row
Mansfield, MA 02048
DEP-MILLBURY
ATTN: Larry Polese
ARGEO PAUL CELLUCCI
Governor
COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS
DEPARTMENT OF ENVIRONMENTAL PROTECTION
SOUTHEAST REGIONAL OFFICE
October 16, 1997
Mr. Lee Azinheira, Town Engineer RE:
Town of Mansfield
6 Park Row
Mansfield, Massachusetts 02048
Dear Mr. Azinheira:
TRUDY COXE
Secretary
DAVID B, STRUHS
Commissioner
MANSFIELD--Water Pollution Control,
BRPWP29, Residuals Approval of
Suitability, Type 3 Classification,
Sludge Composting Facility, Off
Fruit Street,
Transmittal No. 115018
In a letter dated July 1, 1997, your consultant, Camp Dresser & McKee
Inc., acting on behalf of the Town of Mansfield, filed a revised
application to allow the Department to classify the material, by stockpile
designation, by segregation into Type 1 and Type 3 approval requests based
on stabilization and testing data. On August 18, 1997, the Department
conditionally approved the classification of stockpiles 7, 8 and 9,
representing production years 1993, 1994 and 1995, as Type 1 compost.
This letter is thereby sent to address the request for Type 3
classification of compost produced from Mansfield Water Pollution Control
Facility sludge and currently stockpiled at the Town of Mansfield
Compostinq Facility off Fruit Street in the Town of Mansfield,
Massachusetts. This revision is part of an application for an Approvai oz
Suitability originally filed on February 7, 1997, under Transmittal No.
115018.
The compost is stockpiled by year and represents compost produced from
1987 through 1995. There is approximately 9,000 cubic yards of material
which have been labeled as piles 1 through 9, consecutively by year. The
July 1, 1997 letter requests a Type 3 approval for stockpiles 1 through 6
which represent production years 1987 through 1992.
The Department has reviewed the information submitted and has
concluded that sampling, analysis and reporting has successfully been
completed pursuant to the requirements of 310 CMR 32.00. Also, as a result
of its review, the Department has made the following determinations:
1. All analyses have been conducted in accordance with the sampling
and analysis plan approved by the Department on February 14,
1996.
20 Riverside Drive 0 Lakeville, Massachusetts 02347 • FAX(508) 947-6557 • Telephone (508) 946-2700
-2-
2. Sufficient data records have been submitted to allow the
Department to classify compost stockpiles 1 through 6.
3. TCLP test data has demonstrated that the compost is non -hazardous
pursuant to 310 CMR 30.00.
4. Temperature data obtained from the compost piles 2 through 6 for
which the Type 3 approval is being sought have demonstrated that
PFRP (Processes to Further Reducing Pathogens) requirements have
been met utilizing static aerated pile, high temperature
composting, in accordance with 310 CMR 32.81(1). Temperature
records for compost stockpile 1 are not available but, since the
process used to stabilize the material is acceptable and fecal
coliform data meets class B requirements under EPA 40 CFR 503
Regulations, the Department has determined that adequate
stabilization has occured in order to classify stockpile 1 as
Type 3 compost. Additionally, the Department agrees that
stabilization under 310 CMR 32.81(8) has been met for all .
stockpiles, 1 through 6, utilizing EPA 40 CFR 503.
5. Results of all bulk analysis of the material for the land
application parameters have been reported appropriately. In all
relevant samples, the final product meets the criteria for Type 3
as set forth in 310 CMR 32.12 for stockpiles 1 through 6.
As a result of the Department's review, the Town of Mansfield is
granted Type 3 approval for finished compost produced in 1987, 1988, 1989,
1990, 1991 and 1992 and stored as stockpiles 1, 2, 3, 4, 5, and 6. This
approval is subject to the following terms and conditions:
1. This is a one time approval for compost currently stockpiled at
the Town of Mansfield Compost Facility storage area and
designated as stockpiles 1 through 6, produced from 1987 through
1992.
2. No beneficial use of this material shall be allowed unless it is
in accuidaii,c wiLh u valid Land F.pplication Certificate
the Department in accordance with 310 CMR 32.20
3. Record Keeping. The Town shall comply with all the record
keeping requirements of 310 CMR 32.60, as applicable.
The Department reserves the right to rescind, suspend or modify this
approval by the imposition of additional conditions or amendments to the
stated conditions based on determining any actual or potential adverse
impacts resulting from the conduct of this project.
This Permit is an action of the Department. If you are aggrieved by
this action, you may request an adjudicatory hearing. A Notice of Claim
for an Adjudicatory Hearing must be made in writing and postmarked within
thirty (30) days of the date this permit was issued. Pursuant to 310 CMR
1.01(6), the Notice of Claim shall state clearly and concisely the facts
which are grounds for the proceeding and the relief sought.
99M
The Notice
Commonwealth of
($100.00), must
of Claim, along
Massachusetts in
be mailed to:
with a valid check payable to the
the amount of one hundred dollars
Commonwealth of Massachusetts
Department of Environmental Protection
P.O. Box 4062
Boston, MA 02211
The Notice will be dismissed if the filing fee is not paid, unless the
appellant is exempt or granted a waiver as described in 310 CMR 4.00.
If you have any questions, please contact Mr. Richard Rondeau at (508)
946-2816.
Very trul ours,
4aack Hamm, Chief
unton Watershed
H/RR/cb
CC: Mr. Kenneth Hackett
Town of Mansfield WPCF
50 West Street
Mansfield, MA 02048
Mr. James Small
Camp Dresser & McKee Inc.
10 Cambridge Center
Cambridge, MA 02142
Ms. Lynne M. Mosd
Camp Dresser & McKee Inc.
10 Cambridge center
Cambridge, MA 02142
Mr. Scott Leite, Agent
Board of Health
50 West Street
Mansfield, MA 02048
DEP-SERO
ATTN: Jeffrey Gould
DEP-Millbury
ATTN: Larry Polese
COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS
DEPARTMENT OF ENVIRONMENTAL PROTECTION
SOUTHEAST REGIONAL OFFICE
ARGEO PAUL CELLUCCI fj
Governor
C J*
1B � i$
9
August 18, 1997
TRUDY COXE
Secretary
DAVID B. STRUHS
Commissioner
Mr. Lee Azinheira, Town Engineer RE: MANSFIELD--Water Pollution Control,
Town of Mansfield BRPWP29, Residuals Approval of
6 Park Row Suitability, Sludge Composting
Mansfield, Massachusetts 02048 Facility, Off Fruit Street,
Transmittal No. 115018
Dear Mr. Azinheira:
In a letter dated July 1, 1997, your consultant, Camp Dresser & McKee
Inc., acting on behalf of the Town of Mansfield, filed a revised
application for Type I classification of compost produced from Mansfield
Water Pollution Control Facility sludge and currently stockpiled at the
Town of Mansfield Composting Facility off Fruit Street in the Town of
Mansfield, Massachusetts. This revision is part of an application for an
Approval of Suitability originally filed on February 7, 1997, under
Transmittal No. 115018.
The compost is stockpiled by year and represents compost produced from
1987 through 1995. There is approximately 9,000 cubic yards of material
which have been labeled as piles 1 through 9, consecutively by year. The
July 1, 1997, letter specifically requests a Type 1 approval for
stockpiles 7, 8 and 9 which represent production years 1993, 1994 and 1995.
The town is pursuing a Type 3 classification for stockpiles 1 through 6,
production years 1987 through 1992, separately as time and space
constraints at the site dictate expedited approval and removal/distribution
of the Type 1 material as soon as possible. Therefore, this approval
letter specifically addresses the request for Type 1 approval for
stockpiles 7, 8 and 9. Classification of stockpiles 1 through 6 is
currently under review by the Department and a determination will be issued
separately.
The Department has reviewed the information submitted and has
concluded that sampling, analysis and reporting has successfully been
completed pursuant to the requirements of 310 CMR 32.00. Also, as a result
of its review, the Department has made the following determinations:
All analyses have been conducted in accordance with the sampling
and analysis plan approved by the Department on February 14,
1996.
20 Riverside Drive 0 Lakeville, Massachusetts 02347 • FAX(508) 947.6557 • Telephone (508) 946-2700
-2-
2. Sufficient data records have been submitted to allow the
Department to classify compost stockpiles 7, 8 and 9.
3. TCLP test data has demonstrated that the compost is non -hazardous
pursuant to 310 CMR 30.00.
4. Temperature data obtained from the compost piles for which the
Type I approval is being sought have demonstrated that PFRP
(Processes to Further Reducing Pathogens) requirements have been
met utilizing static aerated pile, high temperature composting,
in accordance with 310 CMR 32.81(1),
5. Results of all bulk analysis of the material for the land
application parameters have been reported appropriately. In all
relevant samples, the final product meets the criteria for Type I
as set forth in 310 CMR 32.12 for stockpiles 7, 8 and 9.
As a result of the Department's review, the Town of Mansfield is
granted Type I approval for finished compost produced in 1993, 1994 and
1995 and stored as stockpiles 7, 8 and 9. This approval is subject to the
following terms and conditions:
1. This is a one time approval for compost currently stockpiled at
the Town of Mansfield Compost Facility storage area and
designated as stockpiles 7, 8 and 9. Beneficial use of materials
at the Mansfield compost facility other than stockpiles 7, 8 and
9 or any materials not meeting the Type 1 standards is prohibited
under this approval.
2. The Town shall comply with the labelling and other requirements
of 310 CMR 32.51, "Requirements for sale or distribution of Type
I sludge/compost", which states:
a) No person shall sell or distribute, or offer for use, sale,
or distribution any Type I sludge/compost unless, pursuant
to 310 CMR 32.00, the Department has approved such sludge/
compost as Type I sludge and that approval is valid at the
time the Type I sludge/compost is sold or distributed, or
offered for use, sale, or distribution.
b) No person shall obtain Type I sludge/compost unless such
sludge/compost has a valid approval of suitability.
c) Labelling of Type I Sludge/Compost. Each container in which
Type I sludge/compost is sold, distributed, or transported
or offered for use, sale, or distribution shall itself
prominently display or, if such display is not practicable,
shall be accompanied by a shipping paper which shall
prominently display the following:
i) identification of the material as Type I sludge
(compost)•
MCC
ii) the date of issuance of the Department Approval of
Suitability for the Type I sludge/compost and the
expiration date thereof.
iii) instructions for land applying the material in
accordance with proper agricultural practice,
including, but not limited to, identification of proper
agronomic application rates which shall not cause
exceedence of the nitrogen requirements of the crop to
be grown or intended to be grown.
iv) Type I sludge/compost containing more than 10 parts per
million of molybdenum shall be accompanied by a written
warning that the sludge should not be used on pasture
lands subject to grazing or on lands where crops are
grown or intended to be grown for forage. Use of the
sludge/compost under these circumstances may result in
forage crops containing levels of molybdenum which are
toxic to ruminants.
v) all other instructions and information required by law.
3. Record Keeping. The Town shall comply with all the record
keeping requirements of 310 CMR 32.60, including the submission
to the Department of an annual report pursuant to section
32.60(2)(c) which shall be due on February 1 of the calendar year
following the date the Department issued the approval of
suitability until such time as all material hereby classified is
utilized. Upon utilization of all material, the report shall be
submitted within 30 days or by February 1, whichever is sooner.
The Department reserves the right to rescind, suspend or modify this
approval by the imposition of additional conditions or amendments to the
stated conditions based on determining any actual or potential adverse
impacts resulting from the conduct of this project.
The Mansfield Board of Health, in a letter dated July 17, 1997,
approved of the proposal for classification of Mansfield compost as
proposed and acted upon by this approval letter. This approval fulfills
the obligation of 310 CMR 32.14(2) which requires the written concurrence
of the board of health prior to Type I approval by the Department.
This Permit is an action of the Department. If you are aggrieved by
this action, you may request an adjudicatory hearing. A Notice of Claim
for an Adjudicatory Hearing must be made in writing and postmarked within
thirty (30) days of the date this permit was issued. Pursuant to 310 CMR
1.01(6), the Notice of Claim shall state clearly and concisely the facts
which are grounds for the proceeding and the relief sought.
-4-
The Notice of Claim, along with a valid check payable to the
Commonwealth of Massachusetts in the amount of one hundred dollars
($100.00), must be mailed to:
Commonwealth of Massachusetts
Department of Environmental Protection
P.O. Box 4062
Boston, MA 02211
The Notice will be dismissed if the filing fee is not paid, unless the
appellant is exempt or granted a waiver as described in 310 CMR 4.00.
If you have any questions, please contact Mr. Richard Rondeau at (508)
946-2816.
Very tru e yours,
z-�_
ck Hamm, Chief
j'aunton River Watershed
G/RR/bh
CC: Mr. Kenneth Hackett
Town of Mansfield WPCF
50 West St.
Mansfield, MA 02048
Mr. James Small
Camp Dresser & McKee Inc.
10 Cambridge Center
Cambridge, MA 02142
Ms. Lynne M. Moss
Camp Dresser & McKee Inc.
10 Cambridge Center
Cambridge, MA 02142
Mr. Scott Leite, Agent
Board of Health
50 West St.
Mansfield, MA 02048
DEP-SERO
ATTN: Jeffrey Gould
DEP-MILLBURY
ATTN: Larry Polese
TOWN OF MANSFIELD, MASSACHUSETTS
50 West Street, Mansfield, MA 02048
July 17, 1997
Mr. Richard Rondeau
Division of Water Pollution Control
Department of Environmental Protection
20 Riverside Drive
Lakeville, MA 02347
RE: MANSFIELD--Administrative Review, BRPW29,
Residuals Approval of Suitability, Water Pollution Control,
Sludge Composting Facility, Off Fruit Street
Dear Mr. Rondeau,
Please be advised that the Mansfield Board of Health concurs with the owner of the
above referenced facility in its wish to distribute and/or market compost from the above
referenced disposal.
If I can be of further assistance, please do not hesitate to contact me.
Yolottte/
y,
Sc,
Health Agent
WILLIAM F. WELD
Governor
ARGEO PAUL CELLUCCI
Lt. Governor
COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS
DEPARTMENT OF ENVIRONMENTAL PROTECTION
SOUTHEAST REGIONAL OFFICE
March 7, 1997
TRUDY COXE
Secretary
DAVID It. STRUHS
Commissioner
Mr. Scott Leite, Agent RE: MANSFIELD--Administrative Review,
Board of Health BRPWP29, Residuals Approval of
50 West St. Suitability, Water Pollution
Mansfield, Massachusetts 02048 Control, Sludge Composting
Facility, Off Fruit Street,
Transmittal No. 115018
Dear Mr. Leite:
The Town of Mansfield has applied to the Department of Environmental
Protection, Division of Water Pollution Control, for an Approval of
Suitability for Type 1 and Type 3 residual sludge compost currently
stockpiled at the composting facility. It is the understanding of the
Department that the Mansfield Board of Health has received a copy of the
subject application, in compliance with 310 CMR 32.14(1)(c).
310 CMR 32.14(2) states that "...The Department shall not approve the
use, sale, or distribution or offering for use, sale, or distribution of
Type I sludge without the written concurrence of the board of health of the
city or town in which the owner's or operator's facility is located,
provided that such concurrence is not unreasonably withheld. Said board of
health shall be deemed to have given such concurrence unless it gives
written notice to the contrary to the Department not later than 35 days
after the date of notice given the board of health pursuant to the first
sentence of 310 CMR 32.14(2).n
Accordingly, the Department requests that the Board review the subject
proposal and indicate in writing its approval or disapproval of the
proposed project. Such response should be sent to Richard Rondeau of my
staff at the below address.
20 Riverside Drive • Lakeville, Massachusetts 02347 9 FAX(508) 947-6557 • Telephone (508) 946-2700
-2-
If you have any questions, please contact Richard Rondeau
at (508) 946-2816.
Very truly you
Jef;rb%E ld, Chief
Wat ��\\ ti n Control Section
G/RR/cb
CC: Mr. Lee Azinheira, Town Engineer
Town of Mansfield
6 Park Row
Mansfield, MA 02048
Mr. Kenneth Hackett
Town of Mansfield WPCF
50 West St.
Mansfield, MA 02048
Mr. James Small
Camp Dresser & McKee Inc.
10 Cambridge Center
Cambridge, MA 02142
Ms. Lynne M. Moss
Camp Dresser & McKee Inc.
10 Cambridge Center
Cambridge, MA 02142
DEP-MILLBURY
ATTN: Larry Polese
TOWN OF MANSFIELD, MASSACHUSETTS
Six Park Row, Mansfield, MA 02048
January 20,1997
Mr. Rick Rondeau
Department of Environmental Protection
Southeast Region Office
20 Riverside Drive
Lakeville, MA 02347
Subject: Town of Mansfield, Massachusetts
Application for Approval of Suitability (AOS)
Transmittal No.115018
Dear Mr. Rondeau:
Enclosed you will find an AOS application for stockpiled compost at the Mansfield
Composting Facility, The application was prepared on behalf of the Town by Camp Dresser
& McKee Inc. (CDM). The town of Mansfield has successfully composted biosolids since
1987 using the static pile method. Approximately 50 percent of the annual quantity of sludge
is composted during the warm -weather months with the remainder landfill in an on -site
sludge -only landfill. Since that time the town has stockpiled approximately 9,000 cubic yards
of finished biosolids compost product. Marketing or other utilization of the compost has not
been a priority of the town because the composting site had sufficient storage area and
during the first few years of operation some metals concentration were high (due in part to
lack of corrosion control in the town's water system).
The compost product stockpile area is nearing capacity and the town has recently decided to
initiate design for facility improvements that will allow year-round composting.
Simultaneously, sludge metal concentrations have decreased due to establishment and
enforcement of an industrial pretreatment program and the initiation of corrosion control for
some of the town's drinking water supply wells. Also the town has received proposals to
distribute and/or market the compost product.
Therefore, this AOS is intended to result in a sludge "typing" that will allow the town to
distribute the compost product, Based on analytical data presented in the AOS, the Town
requests that a portion of the compost be classified as Type I material (specifically, stockpiles
generated from 1992 through 1995), with the remainder (generated from 1987 to 1991)
classified as Type III material. The basis for this request is detailed below. Deviations from
analytical protocols are also noted.
Basis for Classification Request
It is our understanding that composts must meet 310 CMR 32 requirements for stabilization,
metals content, and PCB content. Compliance with each of these requirements is
highlighted below.
■ Stabilization (time and temperature). Time and temperature records for 1988 through
1995 are attached for your reference in Attachment B.
Mr. Rick Rondeau
January 20,1997
Page 2
Proposed Type I compost: Stockpiles 6, 7, 8, and 9 meet the requirements of 310
CMR 81 (1), compliance with which is mandatory for Type I materials. Records for
stockpiles 7, 8, and 9 (generated in 1993,1994, and 1995, respectively) demonstrate
that each individual pile contributing to the stockpiles achieved 55°C for three
consecutive days. For stockpile 6 (1992), 32 out of 35 individual piles also met the
criteria. In the remaining three individual piles (#12,14, and 17), the average
temperature of three measurements exceeded the 55°C criterion. (Operators typically
take three measurement per day in a cross-section of the pile.)
To assure that stockpiles 6, 7, 8, and 9 all achieved adequate pathogen reduction each
stockpile was checked based on the EPA Part 503 limit of less than 1000 fecal
coliforms per gram of dry solids. All four stockpiles has less than 10 fecal coliforms
per gram and thus meet Type I requirements.
Proposed Type III materials: Composts generated in 1988, 1989, 1990, and 1991
generally met time and temperature requirements for Type I materials. Several
individual piles constructed in those years did not hit 55°C in all sections of the pile;
for these piles, however, the average of cross -sectional temperatures exceeded 55°C.
In some other cases, temperature measurements were not taken on consecutive
calender days because the facility is operated 5 days per week. Consecutive readings
indicate compliance with the high temperature composting criteria though the
readings were not necessarily performed on consecutive calender days. The
following chart shows which individual piles are impacted by either of these two
issues are listed below:
Production
Year
Compost
Stockpile
Number
Cross-section
Temperatures
Averaged -
Pile Numbers
Measurements on
Non-consecutive
Calender Days -
Pile Numbers
1988
2
33,43
33, 34, 50
1989
3
18, 19,23
21,24
1990
4
35, 36
29, 30, 34
1991
5
9
8, 14, 15, 17, 20, 21
We assert that the these compost in stockpiles 2, 3, 4, and 5 meets the intent of the
stabilization requirements - namely the reduction of pathogens. This assertion is
supported by fecal coliform testing performed on each stockpile. The testing
revealed concentrations ranging from <10 to 150 fecal coliforms/g for these
stockpiles. The fecal coliform concentrations in the stockpiles are well within the
EPA Class A criteria of 1,000 fecal coliforms/g.
For stockpile 1, generated in the first year of the plant's operation, no time and
temperature data was collected but is not available. Pathogen testing shows a fecal
Mr. Rick Rondeau
January 20,1997
Page 3
coliform concentration of 30/g, and we believe this well -aged material to be
stabilized. Also note that the plant adds roughly 0.27 lb lime/lb dry sludge for
dewatering purposes - a dosage that is also capable of substantial pathogen
reduction.
Although the compost in stockpiles 1,2,3,4 and 5 is well stabilized, we propose
that this material be classified as Type III material based on metal concentrations
as discussed below.
Metal and PCBs. Table 1 summarizes the metal and PCB data contained in the AOS
application. Each sample collected represents a discrete pile generated in a single
compost production year. (Sample C-2, for example, was collected from stockpile 2,
which was generated in 1988). As shown in the Table, compost in stockpiles 1
through 7 each exceed Type I cadmium and/or copper concentrations. All other
metals (and PCBs) meet Type I criteria.
The remaining piles (1, 2, 3, 4, and 5) each exceed Type II criteria for cadmium and/or
copper and must be classified as Type III materials.
Deviations from Approved Protocol
Analytical methods used varied from the protocol for mercury, nitrate and pH.
For mercury, the protocol specified EPA 200.7/6010. Method 7471, which the CDM
laboratory indicates is the preferred test for this constituent, was used instead.
EPA Method 353.1 was used to measure nitrate concentrations. Lab staff indicate that the
method specified in the protocol (Method 352.1) was at one time the preferred method for
nitrate analysis, but that it has now been superseded by Method 353.1. Finally, pH was
measured using methods specififed in Methods of Soil Analysis, Part 2: Chemical &
Biological Properties. This is standard procedure for soil (and soil -like) samples.
Please contact Lynne Hersho Moss of CDM at (617) 252-8379 if you have any questions
regarding this transmittal.
Very truly yours,
r
Lee Azinheira, .E
Town Engineer
att.
cc: K. Hackett, Mansfield
Mansfield Board of Health
J. Small, CDM
L. Moss, CDM
no
rJ
c
0
U
0
a
0
0
U
Y
O
U
0
•a
U
2f
Y
O
V
0
.a
a
g
O
O
V
^
0
p
N
O
O
ti
ti
V
^
u
V
U�
0
erf
O
a
O
V
Ot
�
V
N�
Oe
P
O
Ot
Q
Y
b
C
N
0
a
_p
U
P
U
V
V
N^
O
b
O
b
M
V
Y
Q
C
Q
�
U�
O
_
V
b
Md'
VP
V
v
vjr�j
^
N
y
vNi
e
Q
V
0
.ap
e
J
P
3
v
�
e
o
U
o �-1
rt
$3
E
E
U
}
'a
'�
a
a
u
o
u
co
u
C
0
4
cv"60J
D E. P
Commonwealth of Massachusetts
Executive Office of Environmental Affairs
Department of
Environmental Protection
Southeast Regional Office
Wllllam F. Weld
Gowma
Argeo Paul cel cl
U.`"���
. Gowmot /�^% ..
February 14, 1996
F E B 1 6 1996
Trudy Coxe
Be retnry
David B. SUuhs
Commleeloner
Mr. Kenneth F. Hackett RE: MANSFIELD--Residuals Sampling and
Town of Mansfield Analysis Plan, BRPWP28, Water
50 West Street Pollution Control, Sludge
Mansfield, Massachusetts 02048 Composting Facility, Off Fruit
Street, Permit No. 111986
Dear Mr. Hackett:
The Department is in receipt of a Sampling and Analysis Plan prepared
by your consultant, Camp Dresser & McKee, Inc. on behalf of the Town of
Mansfield regarding compost product stored at the Mansfield Composting
Facility, off Fruit Street, in Mansfield, Massachusetts under Transmittal
No. 111986. The Town of Mansfield is seeking a Type I Approval of
Suitability (classification) for the compost which is intended to be
distributed for beneficial use in Massachusetts. Please note, the Town
understands that, based on anticipated sampling results, a Type 2 Approval
of Suitability may ultimately be granted by the Department.
The Town currently has nine existing individual compost piles onsite
which consist of compost which was generated between 1987 and 1995 with
each pile representing one years worth of production. In order to
characterize the compost, representative sampling will be performed on each
pile of compost. Nine composite samples, one from each pile, will be
collected for analyses. Each composite sample will be created from eight
grab samples. Each grab sample will be collected from a different location
in the compost pile at a depth of approximately four feet. These eight
locations shall be selected so as to best represent the entire range of
compost in each pile. A duplicate sample will be created from one of the
nine compost piles to serve as a quality assurance/quality control
mechanism for laboratory results. Analysis will include one TCLP sample
which will include a portion of each of the nine pile composite samples.
Analytical services for compost testing are to be provided by four
separate laboratories, only three of which will be performing the required
testing under 310 CMR 32.00. These three labs are Camp Dresser & McKee
Laboratory of Cambridge, Massachusetts, Lapuk Laboratories of Watertown,
Massachusetts and A&L Eastern Agricultural Laboratories of Richmond,
Virginia. The Camp Dresser & McKee Laboratory will be performing PCB,
metals and TCLP analyses and A&L Eastern Agricultural Laboratories will be
performing the other required chemical analyses. Lapuk Laboratories will
20 Riverside Drive a Lakeville, Massachusetts 02347 a FAX (508) 947.6557 • Telephone (508) 946.27DO
w
gy Primed on Recycled Paper
-2-
be performing stabilization testing in accordance with EPA part 503
regulations. The Department finds that these laboratories are acceptable
to perform the requisite analysis required under 310 CMR 32.00. A fourth
lab, Woods End Research Laboratory, Inc., will be used to assess other
marketability criteria not required under 310 CMR 32.00.
Please be advised, it is the responsibility of the consultant to
ensure that adequate sample volumes are collected commensurate with
laboratory distribution and testing as outlined above. Also, in reporting
data from the proposed analysis, the Department wishes to reinforce the
selection of detection limits which are at least as low as the
classification criteria set forth in 310 CMR 32.12. Detection limits which
are too high will invalidate the associated analytical results.
The Department has completed its review of the sampling and analysis
plan and has determined that it complies with the requirements of
Massachusetts Land Application Regulations. Based on this review, the
Department hereby approves the Plan with the following conditions and
understandings of approval:
1. All sampling and analysis shall be performed in accordance with
the application submitted by the applicant. Any proposed changes
must be approved by the Department.
2. If available, temperature data for all existing compost piles
which are to be classified should accompany the chemical quality
and stabilization data at the time the Application for Approval
of Suitability (BRPWP29) is submitted.
3. Parameters to be sampled for shall include those listed in 310
CMR 32.13(5) and Table 1 and Table 2 in the application for
Approval of Suitability (BRPWP29).
4. All analyses shall be performed using approved test procedures in
accordance with the List of Approved Test Procedures for Sludge
Parameter contained in the Sampling and Analysis Plan Approval
application (BRPWP28) Any deviations must be explained in the
application for Approval of Suitability (BRPWP29).
5. If the compost appears highly variable during sampling,
additional samples may be required in order to determine the
classification of the final compost material.
The Department reserves the right to rescind, suspend or modify this
approval by the imposition of additional conditions or amendments to the
stated conditions based on determining any actual or potential adverse
impacts resulting from the conduct of this project.
-3-
If-you have any questions, please contact Mr
(508) 94672816.
Very
Jef
Wat
G/RR/ir
cc: Mr. Dan Clifford, Director
Department of Public Works
50 West Street
Mansfield, MA 02048
Mr. William Williams, Town Manager
Town Hall
50 West Street
Mansfield, MA 02048
Mr. James Small
Camp Dresser & McKee Inc.
10 Cambridge Center
Cambridge, MA 02142
Ms. Lynne M. Hersho
Camp Dresser & McKee Inc.
10 Cambridge Center
Cambridge, MA 02142
DEP - MILLBURY
ATTN: Larry Polese
Richard Rondeau at
Section
TOWN OF MANSFIELD, MASSACHUSETTS
50 West Street, Mansfield, MA 02048
November 29, 1984
Mr. Joseph Zeneski
DPW Director
Town Hall
Mansfield, MA 02048
Dear Mr. Zeneski:
The Board of Health would like to invite you to
our meeting on Wednesday, December 5, 1984, at
8:00 P.M. At such time we would like to discuss
the Board's approval of the sludge landfill pro-
ject off Fruit Street as required in the MGLA,
Chapter 111, Section 150A.
If there are any questions, please call the
health office.
Sincerely,
Edward. J. Tartufo
Chairman
sc
TOWN OF MANSFIELD, MASSACHUSETTS
DPW
January 31, 1984
D.E.Q.E.
Lakeville Hospital
Lakeville, MA 02346
Attention: Mr. Phil Ripa
Reference: Telephone Conversation 1-11-84
Septage Handling
Mansfield W.W.T.P.
Gentlemen:
50 West Street, Mansfield, MA 02048
FF6 1 1984
The Town of Mansfield has taken steps to handle septage generated within
the town at the treatment facility on Fruit Street. The action is being
taken on an experimental basis with strict conformance with effluent dis-
charge limitations.
The existing sewage treatment plant on Fruit Street is a secondary treat-
ment system utilizing extended aeration with settling and chlorination
for most of the flow and trickling filters preceded and followed by sett-
ling with final chlorination. The entire flow enters lagoons for addi-
tional settling. The sludges (primary, secondary, and trickling filter)
are treated in aerobic digestors, chemically conditioned, and dewatered.
The aerobic digestion system has been modified to allow the introduction
of septage into one of the two 100,000 gallon tanks. The tank can be
operated to mechanically mix and aerate the septage, then shut off to
allow settling (thickening). The settled septage sludge can then be fil-
tered in the same manner as other sludges and the clear supernatant can
be bled back to either the extended aeration stream or to the trickling
filter stream.
The system has the
lize the usually
handling and in
addition of any
ment, handling,
adding chlorine
odorants.
flexibility to allow the addition of lime to neutra-
very acidic septage. This will help in septage sludge
odor control. The system also allows for the controlled
or all of the other sludges to enhance septage treat -
or dewatering. Odor control will be achieved by either
by way of a portable chlorination unit or by use of de-
To: Mr. Phil Ripa
Page 2
January 31, 1984
We have established a separate account to keep track of the cost of oper-
ating the septage treatment stream. We are presently charging pumpers
$10.00/thousand gallons and expect that this will cover all costs at our
estimated safe operating rate of 11,000 gpd. We are only receiving sep-
tage from haulers who can document that the load was from systems loca-
ted in Mansfield.
If you have any questions or comments regarding our system, please call
me.
Very truly yours,
OF PUBLIC WORKS
..
M.\Zeneski „P.E.
cc: Board of Health
Town Manager
JMZ/eac
1'0NVJ'N OF N,1.AN'SF[F,I,1), N4X;SACHUSETTS
MEMORANDUM
To: Town ManagevN
From: DPW Directo
Subject: Septage Han in
SUMMARY
50 West Street, Mansfield, MA 02048
January 18, 1984
JAN 2 6 1984
On Tuesday, January 10, 1984, I was informed by you, from Boston, that you
had met with the MDC and learned that septage haulers serving Mansfield
would no longer be allowed to dump in the receiving station in Walpole.
By Friday, January 13, 1984, we were receiving septage on an experimental
basis from haulers working in Mansfield.
We have responded to a problem in a most efficient and technically correct
manner. The speed of our response is due to the cooperation and dedication
of our wastewater treatment plant personnel, our office staff, Town Accoun-
tant Barbara Hagg and Health Agent Karl Drown. The following is a documen-
tation of the sequence of events and the technical problems that were
encountered and solved.
CHRONOLOGY
Tuesday, January 10, 1984 The Town was officially informed;;that
haulers working in Mansfield will no'longer-be allowed to dump at
the MDC station in Walpole. The Town Manager immediately'informed
the DPW Director and Health Agent that actions would have to be
taken to find an alternative. The Health,Agent immediately began.
calling other communities and sewer system operators to explore use
of those systems. Simultaneously, the DPW Director began exploring
the possibility of accepting septage on a limited basis at the
Fruit Street treatment plant.
During meetings with C.D.M. representatives previously scheduled for
inspection of the new treatment plant in Norton, the Director and
Sewer Division Supervisor reviewed possible septage treatment actions
to be taken at the Fruit Street plant. It was decided to accept a
limited amount of septage in one of the sludge digestion tanks whereby
the septage could be isolated from the main treatment stream.
To: Town Manager
Page 4
January 18, 1984
ADMINISTRATION
There is a real need to maintain proper records on septage receipts for
billing and control purposes. We, therefore, are using a three-part work
order form to document from whom the septage was received and the total
quantity. This is signed by the driver to acknowledge his obligation to
pay for the service and endorse his statement of septage source. The
driver receives a copy for his records; the office receives a copy for
billing and Bill Handy keeps a copy to spot check on septage pumping.
Pumpers understand that if they are caught cheating or do not pay prompt-
ly, they will be denied use of the facility.
COST RECOVERY
Based on fixed costs of about $350. per week for electricity, $85, per week
for labor and $2.00 per thousand gallons for chemicals, the charge of $10.00
per thousand gallons will result in "break-even" at about 55,000 gallons per
week or 11,000 gpd during working hours. If actual costs vary, however, we
will adjust the rate to properly recover the costs of septage treatment.
The actural mechanism for cost recover will be through weekly bills sent out
from the DPW office.
SIDE BENEFI
There are a couple of extra benefits in the operation we're undertaking:
1. The Board of Health will have a record of septage pumping
in town.
2. We will acquire experience in septage treatment that will
be useful at the new facility.
3. We are maximizing the use of the existing faciltiy.
JMZ/cb
To: Town Manager
Page 3
January 18, 1984
Friday, January 13, 1984 - Three (3) days after formal notifi-
cation from the MDC, the Mansfield treatment plant on Fruit
Street was ready to accept and treat septage from non-sewered
buildings in Mansfield.
The modifications included structural changes, paper work for
recording/verification and a billing system for proper cost
recovery.
TREATMENT SYSTEM
The existing sewage treatment plant on Fruit Street is a secondary treatment
system utilizing extended aeration with settling and chlorination for most
of the flow and trickling filters preceded and followed by settling with
chlorination. The entire flow enters lagoons for additional settling during
the summer months. The sludges (primary, secondary and the trickling filter)
are separately treated in aerobic digestors chemically conditioned and
filtered. The filtered sludge is mixed with sand/gravel and used as cover
material at the landfill.
The aerobic digestion system has been modified to allow the introduction of
septage into one of the two 100,000 gallon tanks. The tank can be operated
to mix and add air to the septage, then shut off to allow settling (thick-
ening). The settled septage sludge can then be filtered in the same manner
as other sludges and the clear supernatant can be bled back either to the
extended aeration stream or to the trickling filter stream (followed by
chlorination and disposal).
The system has the flexibility to allow the addition of lime to neutralize
the usually very acidic septage. This will help in septage sludge handling
and in odor control. The system also allows for the controlled addition of
any or all of the other sludges to enhance septage treatment, handling or
dewatering. Odor control can be achieved by either adding chlorine by use
of a portable chlorination unit or by the purchase of deoderants (purchanse
is expensive and will obly be considered if warranted).
COSTS
The Town.Accountant has established jobbing account numbers for labor and
material costs associated with the septage handling. Thus far, we spent
about $750.00 in overtime wages in cleaning out the existing aerobic
digestor. We've presently accrued no costs for materials. We expect,
hbwever, to be spending for lime (2 to 5 pounds per thousand gallons) and
electricity (we'll be running a 40hp motor to aerate the septage). In
order to keep the cost of septage handling separate, we will be charging
the septage jobbing account when labor is involved in receiving, proces-
sing or dewatering sludge.
To: Town Manager
Page 2
January 18, 1984
On Tuesday evening, DPW Wastewater Treatment Section personnel
worked overtime to dewater and process the sludge that was being
stored in one of the aerobic digestors. This was necessary to
make room for the septage that we expected to receive.
'Wednesday, January 11, 1984 - Steps were taken to refine the
envisioned septage treatment process by locating a suitable re-
ceiving point and making structural modifications to control the
inflow and "bleed off" to the main treatment stream.
A meeting with septage haulers was scheduled for Thursday morning.
This meeting was desired to determine how much septage would
have to be handled and whether it could be accomodated at the
Fruit Street plant:
Mr. Phil Ripa of Massachusetts D.E.Q.E. Southeast Region was
contacted regarding the situation. He informed us that the State
would have no problem with the proposal as long as it did not adversely
affect the quality of effluent. He agreed that the concept of a
separate treatment stream with control of "bleed off" to the main
stream was a reasonable approach.
The Town Accountant and DPW Director discussed the matter of bil-
ling for septage handling/treatment. It was agreed that in order
to retain flexibility and to be consistent with the concept of
the enterprise account for wastewater treatment, a jobbing account
would be established to separate the actual cost of septage hand-
ling/treatment and allow recovery of those costs from the haulers
(and ultimately from the homeowner) and not from the regular sewer
customer.
'Thursday, January 12, 1984 - A meeting was held with five (5)'of
the 20 septage pumpers holding permits from the Board of Health.
It was determined that they would produce about 10,000 to 15,000
gpd. It was further established that some changes in our orig-
inal concept for management and charging should be made to better
control and recover the costs of handling septage. Each of the
haulers was invited to visit the site and offer comments on
receiving facilities.
An administration and cost recovery plan was developed and pre-
sented to the Town Manager.
WILLIAM F. WELD
Governor
ARGEO PAUL CELLUCCI
Lt. Governor
COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS
DEPARTMENT OF ENVIRONMENTAL PROTECTION
SOUTHEAST REGIONAL OFFICE
March 7, 1997
TRUDY COXE
Secretary
DAVID B. STRUHS
Commissioner
Mr. Scott Leite, Agent RE: MANSFIELD--Administrative Review,
Board of Health BRPWP29, Residuals Approval of
50 West St. Suitability, Water Pollution
Mansfield, Massachusetts 02048 Control, Sludge Composting
Facility, Off Fruit Street,
Transmittal No. 115018
Dear Mr. Leite:
The Town of Mansfield has applied to the Department of Environmental
Protection, Division of Water Pollution Control, for an Approval of
Suitability for Type 1 and Type 3 residual sludge compost currently
stockpiled at the composting facility. It is the understanding of the
Department that the Mansfield Board of Health has received a copy of the
subject application, in compliance with 310 CMR 32.14(1)(c).
310 CMR 32.14(2) states that "...The Department shall not approve the
use, sale, or distribution or offering for use, sale, or distribution of
Type I sludge without the written concurrence of the board of health of the
city or town in which the owner's or operator's facility is located,
provided that such concurrence is not unreasonably withheld. Said board of
health shall be deemed to have given such c.oncurren.cc unless it gives
written notice to the contrary to the Department not later than 35 days
after the date of notice given the board of health pursuant to the first
sentence of 310 CMR 32.14(2)."
Accordingly, the Department requests that the Board review the subject
proposal and indicate in writing its approval or disapproval of the
proposed project. Such response should be sent to Richard Rondeau of my
staff at thebelow address.
20 Riverside Drive 0 Lakeville, Massachusetts 02347 0 FAX(508) 947-6557 0 Telephone (508) 946-2700
-2-
If you have any questions, please contact Richard Rondeau
at (508) 946-2816.
action
G/RR/cb
CC: Mr. Lee Azinheira, Town Engineer
Town of Mansfield
6 Park Row
Mansfield, MA 02048
Mr. Kenneth Hackett
Town of Mansfield WPCF
50 West St.
Mansfield, MA 02048
Mr. James Small
Camp Dresser & McKee Inc.
10 Cambridge Center
Cambridge, MA 02142
Ms. Lynne M. Moss
Camp Dresser & McKee Inc.
10 Cambridge Center
Cambridge, MA 02142
DEP-MILLBURY
ATTN: Larry Polese
COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS
DEPARTMENT OF ENVIRONMENTAL PROTECTION
SOUTHEAST REGIONAL OFFICE
WILLIAM F. WELD
Govemor
ARGEO PAUL,CELLUCCI
Lt. Govemor
Mr. Lee Azinheira, Town Engineer
Town of Mansfield
6 Park Row
Mansfield, Massachusetts 02048
Dear Mr. Azinheira:
TRUDY COXE
Secretary
DAVID B. STRUHS
Commissioner
March 6, 1997
RE: MANSFIELD--Administrative Review,
BRPWP29, Residuals Approval of
Suitability, Water Pollution
Control, Sludge Composting
Facility, Off Fruit Street,
Transmittal No. 115018
The Department has completed its Administrative Review of the permit
application listed above and determined that the application is
administratively complete. Accordingly, the Department will begin its
Technical Review.
According to 310 CMR 4.04, the Department now has sixty (60) days to
complete its Technical Review and issue a final decision to grant or deny
the permit.
Provided your application is technically adequate, and none of the
contingencies outlined in 310 CMR 4.04 occur, the Department will issue a
final decision within the timeframes listed above.
If you have any questions, please contact Richard Rondeau at (508)
946-2816.
Very tryily
Je
G/RR/.cb
CC: Mr. Kenneth Hackett
Town of Mansfield WPCF
50 West St.
Mansfield, MA 02048
Control Section
20 Riverside Drive 0 Lakeville, Massachusetts 02347 0 FAX(508) 947-6557 0 Telephone (508) 946-2700
-2-
cc: Mr. James Small
Camp Dresser & McKee Inc.
10 Cambridge Center
Cambridge, MA 02142
Ms. Lynne M. Moss
Camp Dresser & McKee Inc.
10 Cambridge Center
Cambridge, MA 02142
Mr. Scott Leite, Agent
Board of Health
50 West St.
Mansfield, MA 02048
DEP-MILLBURY
ATTN: Larry Polese
a
0
Town of Mansfield,
Massachusetts
Sludge Management Study
August 1996
0
e
V
Contents
List of Figures
List of Tables
Section 1 Background and Approach .........................................
1-1
1.1 Background .................................................
1.2 Approach ..................................................
1-1
1-1
Section 2 Existing Sludge Management Practices ...............................
2-1
2.1 Description .................................................
2-1
Section 3 Evaluation of Sludge Management Alternatives .........................
3-1
3.1 Alternatives Evaluated
3-1
........................................
3.2 Evaluation Considerations .....................................
3-1
3.2.1 Sludge Production ......................................
3-1
3.2.2 Sludge Quality ..........................
3-2
3.2.3 Landfill Reclamation Potential .............................
3-2
4
w
L
Section 4
3.2.4 Equipment Replacement Needs ........................... 3-4
3.3 Evaluation Criteria ................ 3-4
3.3.1 Life -cycle Costs ....................................... 3.4
3.3.2 Non -cost Factors ....................................... 3-6
3.4 Alternative Descriptions and Evaluations .......................... 3-6
3.4.1
Scenario 1: Continuation of Existing Practice ................. 3-8
3.4.2
Scenario 2: Full -year Composting with Woodchips ...........
3-11
3.4.3
Scenario 3: Full -year Composting with Sawdust .............
3-15
3.4.4
Scenario 4: Full -year Landfilling ..........................
3-18
3.4.5
Scenario 5: Hauling Liquid Sludge ........................
3-18
3.4.6
Scenario 6: Hauling Dewatered Sludge ....................
3-24
3.5 Evaluation Summary ........................................ 3-27
Recommendation................................................ 4-1
CDM Camp Dresser & McKee
2DI-IG AT-4TSK t
Contents
(continued)
0
Appendices
A
8
C
Stockpiled Compost Quality Assessment
Stockpiled Compost Procurement Package
Request for Modification to the Landfill Operating Permit
CDM Camp Dresser 6t McKee
201-160-RT-4TSK
ii
List of Figures
Figure
3-1 Proposed Compost Roof Structure ................................ 3-12
3-2 Non -Cost Evaluation Summary .................................. 3-29
CDM Camp Dresser & McKee
201-160-RTATSK 111
List of Tables
Table
3-1 Current Sludge Production ........................................ 3-3
3-2 WPC Design Criteria ............................................ 3-3
3-3 Equipment Replacement Schedule ................................. 3-5
3-4 Cost Estimate Assumptions ...................................... 3-7
3-5 Estimated Costs: Scenario - Continuation of Existing Operations
Current Sludge Production ........................................ 3-9
3-6 Estimated Costs: Scenario - Continuation of Existing Operations
Design Sludge Production ....................................... 3-10
3-7 Estimated Costs: Scenario 2 - Year Round Composting with Woodchips
Current Sludge Production ....................................... 3-13
3-8 Estimated Costs: Scenario 2 - Year Round Composting with Woodchips
Design Sludge Production ........................................ 3-14
3-9 Estimated Costs: Scenario 3 - Year Round Composting with Sawdust
Current Sludge Production ....................................... 3-16
3-10 Estimated Costs: Scenario 3 - Year Round Composting with Sawdust
Design Sludge Production ....................................... 3-17
3-11 Estimated Costs: Scenario 4 - Year Round Landfilling
Current Sludge Production ....................................... 3-19
3-12 Estimated Costs: Scenario 4 - Year Round Landfilling
Design Sludge Production ............. I......................... 3-20
3-13 Estimated Costs: Scenario 5 - Liquid Haul and Disposal
Current Sludge Production ....................................... 3-22
3-14 Estimated Costs: Scenario 5 - Liquid Haul and Disposal
Design Sludge Production ....................................... 3-23
3-15 Estimated Costs: Scenario 6 - Cake Haul and Disposal
Current Sludge Production ....................................... 3-25
3-16 Estimated Costs: Scenario 6 - Cake Haul and Disposal
Design Sludge Production ....................................... 3-26
3-17 Cost Summary for Sludge Management Study ...................... 3-28
CDM Camp Dresser & McKee
201460flT-0TSK iv
One
Section 1
Background and Approach
1.1 Background
Since the Town of Mansfield constructed its sludge composting and landfill facilities in 1985,
the number and nature of sludge management options available to municipalities has in-
creased dramatically, especially in the area of commercial enterprises. Looking to the future,
the Town wishes to ensure that their current operation remains cost-effective. This study has
been commissioned to assess the cost-effectiveness of current operations as compared to a
variety of sludge management alternatives.
The study is actually one of four studies that Camp Dresser & McKee Inc. (CDM) is currently
performing for the Town with regard to sludge management issues.
Concurrent studies and their corresponding status are as follows:
■ Assessment of stockpiled compost quality. This study has been completed and is included
in this report as Appendix A.
■ Assistance to the Town in their efforts to market existing compost. To meet this objective
CDM prepared a preocurement package for the Town. The package is included here as
Appendix B.
■ Assessment of the feasibility of landfill reclamation. DEP staff have indicated that onsite
reclamation may be a viable alternative for the Town. A letter to the DEP requesting a
permit modification to allow reclamation activities is presented in Appendix C.
1.2 Approach
To meet the objectives of this study, six sludge management alternatives were evaluated,
including a continuation of existing practices. Alternatives were compared on both a cost and a
non -cost basis. Cost comparisons considered life -cycle costs, developed for a 20-year planning
period. Non -cost evaluations considered the relative merits of the alternatives with respect to
factors such as implementability, reliability, environmental impacts, beneficial use potential,
and revenue potential. Based on these assessments, preferred alternatives were identified.
El
14
CDM Camp Dresser & McKee
201A TATS
1.1
0
i
!I
D
4
I
I,
I
U
n
tion
Two
Section 2
Existing Sludge Management Practices
2.1 Description
The Town of Mansfield Water Pollution Control Facility (WPCF), located in Norton, Massa-
chusetts, provides secondary treatment for wastewaters generated in both Mansfield and
Norton. The WPCF was constructed in 1985 (replacing an older facility in Mansfield) and has a
design capacity of 3.14 million gallons per day (MGD). The plant currently treats about 2.0
MGD.
Sludge produced at the plant is a mixture of primary and secondary solids. Mixed primary and
secondary solids are co -thickened in clariflocculators and then transferred to a sludge holding
tank at a solids concentration ranging from 3.5 to 5.5 percent. Thickened sludge is conditioned
using ferric chloride and lime and -then dewatered onsite using plate and frame presses. The
solids content of the dewatered sludge ranges from 32 percent to 39 percent,
Dewatered sludge is transported by dump truck to the old wastewater treatment site in
Mansfield (the "Fruit Street" site) for composting in the warmest six months (generally May to
October) and landfilling in the coldest six months (November to April). A total of about 1,372
dry tons of sludge per year are composted or landfilled at the site.
The Town is currently operating the second of three landfill cells at the site. One of the three
cells is full, and the active cell will soon reach capacity, leaving one cell remaining for future
use. The Town currently spreads the sludge in the active cell, and covers the newly deposited
material with gravel on a daily basis. A crawler loader is used for the spreading and covering
operations. Approximately three cubic yards of gravel are used to cover each cubic yard of
landfilled sludge.
Composting at the site is performed using the aerated static pile method. Sludge is mixed with
wood chips at a volumetric ratio of 1 part sludge to 1.5 to 2 parts woodchips (as determined by
the operator). Both new and recycled chips are used in the mix. The mixed sludge and
woodchips are transported by a front end loader to the active composting area to be placed in a
composting pile. Before pile construction, a four to six inch bed of woodchips is placed on the
ground. Perforated piping is placed in the woodchip bed to convey air from a blower through
the bed and constructed pile.
Composting material remains in the pile for 30 days, after which the pile is broken down, the
woodchips are screened from the material and the screened compost is taken to the curing area.
After 90 days of curing, the finished material is moved to the finished compost storage area.
14 CDM Camp Dresser & McKee
201.1GO-RT-4TSK
2-t
I
on
Three
Section 3
Evaluation of Sludge Management Alternatives
3.1 Alternatives Evaluated
A total of six sludge management scenarios were evaluated. They are described in Section 3.4
and highlighted below.
■ Scenario 1: Continuation of Existing Practice. This alternative assumes that sludge
management practices at Mansfield will remain essentially unchanged. Sludge will be
dewatered, then composted in the warmer months and landfilled in the winter months.
■ Scenario 2: Full -year Composting with Woodchips. Under this alternative, landfilling of
sludge would be eliminated and replaced with composting as currently practiced only in
summer. A roof over the fictive composting pad and material storage areas would be
required to implement this scenario. Blower improvements are recommended as well.
■ Scenario 3: Full -year Composting with Sawdust. This scenario differs from Scenario 2
only in that sawdust is used in place of woodchips as a composting amendment.
■ Scenario 4: Full -year Landitlling. This alternative assumes that all composting activity in
Mansfield will cease and be replaced with onsite landfilling of dewatered sludge.
■ Scenario 5: Hauling Liquid Sludge for Offsite Processing/disposal. Under this scenario,
dewatering operations at the WPCF would be eliminated, as would landfilling and
composting operations. Liquid sludge would be hauled to privately -operated incinerator
operations for subsequent processing.
■ Scenario 6: Hauling Dewatered Sludge for Offsite Processing/disposal. This alternative is
similar to Scenario 5 in that sludge would be hauled to a commercial facility for process-
ing or disposal. Unlike Scenario 5, however, the sludge would be dewatered (as currently
practiced) at the WPCF prior to hauling.
3.2 Evaluation Considerations
To develop sludge management alternatives and corresponding costs, a variety of factors must
be considered and assumptions made. This section presents the considerations and assump-
tions that provide the framework for alternative development.
3.2.1 Sludge Production
To size sludge management facilities and estimate operating costs, it is important to know how
much sludge must be handled both now and in the future.
CDM Camp Dresser & McKee 3 1
201-i6o-aT4Tsx
Section 3
Evaluation of Sludge Management Alternatives
To estimate current production, CDM reviewed the WPCF sludge generation rates for 1993,
1994, and 1995 (see Table 3-1). As shown in the table, no growth trend in sludge production was
observed during that period and so an average of 1,372 dry tons per year (dtpy) was used to
estimate current sludge management costs.
Estimating future sludge generation rates for the Town is more problematic. Factors that could
affect future sludge generation at the plant include population growth in Mansfield, removal
of infiltration and inflow from the system, and an increase in wastewater flow from other
towns contributing to the WPCF. The Town is planning (but has not yet started) a facility plan
to estimate future wastewater flows.
In the absence of specific projections, we have assumed for this study a maximum future
sludge generation rate equal to the design capacity of the WPCF. Design criteria from the plant,
established in 1985 (see Table 3-2), indicates that "design year" sludge production is expected to
be 3,161 dtpy.
Because there is such a significant difference between current and design sludge production,
compounded by uncertainty regarding future flows to the plant, costs for each sludge manage-
ment alternative have been developed for two approaches. The first assumes that sludge
generation will not increase over the next twenty years, while the second assumes that sludge
generation will increase to the design capacity of the plant. These approaches dramatically
affect operating costs for each alternative. Capital cost estimates are not affected, however, as all
facilities and equipment required have been generally sized to accommodate design year sludge
quantities.
3.2.2 Sludge Quality
Sludge quality primarily impacts the viability of beneficial use options, such as composting, and
is usually defined in terms of compliance with state and federal regulations. On the state level,
the 310 CMR 32 regulations govern beneficial use; the 40 CFR 503 regulations fulfill this role on
a federal level. Recent analyses of compost from Mansfield indicates that composts generated
in the last three years are in compliance with the most stringent Massachusetts and federal
regulations for inorganic constituents (see Appendix A). Further, all existing compost materi-
als meet federal criteria for pathogen reduction (the Commonwealth does not have numeric
criteria for pathogens).
Sludge quality issues will be explored in greater depth in an upcoming CDM report. For this
study, it is sufficient to know that the quality of compost generated at Mansfield will not limit
its potential for beneficial use.
3.2.3 Landfill Reclamation Potential
As noted previously, the Town has essentially filled two of the three available landfill cells on
site. At current sludge production rates and cover material usage, the remaining cell capacity
will be exhausted in about 5 years.
dn CDM Camp Dresser & McKee 3-2
In I 201.160AT-4TSK
TOWN OF MANSFIELD, MASSACHUSE77S
SLUDGE MANAGEMENT STUDY
TABLE 3-1
Current Sludge Production
Year
Sludge
Quantities (Dry Tons per year)
Lime Ferric Chloride
Total
1993
1,030
279 74
1,383
1994
1,033
285 76
1,393
1995
m
279 ZQ
1.338
Average
1,017
281 73
1,372
TABLE 3-2
WPCF Design Criteria"
Annual Sludge Production
Dry Tons CY
Initial Year (1985) 1,820 4,784
Design year' (2005) 3,161 8,372
`For original facility design
Section 3
Evaluation of Sludge Management Alternatives
To extend landfill capacity, the Town may wish to consider "reclaiming"existing landfill
capacity. This process would involve excavating landfilled materials (initially from the oldest
cell) and using the excavate as cover material for new sludge. The excavate is about 75% (or
more) gravel, and its use could both reduce gravel costs and add landfill capacity without
constructing new facilities.
Excavated cells could potentially be refilled with gravel and sludge at a ratio of 2:1 (compared to
the current 3:1 ratio), further extending landfill capacity. The validity of this assumption is
contingent upon the purchase of new grading equipment for the landfill operation and a
favorable outcome of slope stability studies. For this study, we have assumed that the assump-
tion is valid.
We also assumed that the landfill cells would be reclaimed only once as perpetual reclamation
may have adverse effects on slope stability and cell integrity. The goals of the reclamation
effort are: 1) to reduce the cover to sludge ratio in each cell to 2:1, thereby effectively adding
landfill capacity.
In order to begin reclaiming landfill capacity, the Town will need to obtain a modification to
the existing operating permit for the landfill. Toward this end, CDM has prepared a letter to
the DEP requesting a permit modification for the landfill (see Appendix C).
The implementation issues outlined above must be resolved before the Town pursues landfill
reclamation. As will be shown in Section 3.4, the economic benefits of this approach are
significant, however, warranting further exploration of this procedure.
3.2.4 Equipment Replacement Needs
Now eleven years old, some of the sludge management equipment at the WPCF, composting
facility, and landfill will need to be replaced now or in the near future. Based upon discussions
with WPCF staff, CDM developed an equipment replacement schedule, which is presented in
Table 3-3.
Table 3-3 also reflects the current cost of this equipment and the expected cost at time of replace-
ment. Future replacement costs are based on an assumed inflation rate of 3%.
3.3 Evaluation Criteria
3.3.1 Life -cycle Costs
An Equivalent Uniform Annualized Cost (EUAC) was developed for each sludge management
alternative based upon estimated capital and operating costs. Essentially, the EUAC represents
the annual cost outlay required if present and future operating costs and capital costs were to be
evenly spread across the "life-cycle"(planning period) of 20 years used for this study.
E
CDM Camp Dresser & McKee 3.4
IN201.160AT,4TSK
TOWN OF MANSFIELD, MASSACHUSETTS
SLUDGE MANAGEMENT
TABLE 3-3
Equipment Replacement Schedule
Current Cost
Year Replaced'
Cost at Replacement'
D wat ring
Lime System',' $407,000
10
$547,000
L�doeg Bullzz$1001000
0
$100,000
Front End Loaders $195,000
5
$214,000
Trucks $110,000
5
$128,000
Composting
Screen $150,000
0
$150,000
Mixer $105,000
5
$122,000
Front End Loaders $185,000
5
$214,000
Trucks' $110,000
5
$128,000
Blowers' $35,000
10
$47,000
Blower Electrical/Control System'' $75,000
10
$101,000
Botts:
' Denotes year replaced in 20-year planning period. Year 0 is assumed to be 1996.
'Inflated from current cost at a rate of 3%.
'Assumes replacement of mixers, slakers/feeders, and pumps.
'Includes engineering and contingency allowance of 35%.
'Maybe used for landfilling or composting operations.
' Reflects upgrade in site from 1hp to Shp.
Section 3
Evaluation of Sludge Management Alternatives
Capital costs developed for the study are generally based on design sludge quantities. Landfill
construction costs were handled differently, however, since this approach was felt to be overly
conservative for this application. For landfill sizing at currently sludge production, an average
of current and design sludge quantities was used to size new facilities. For design production
estimates, facilities were sized to accommodate 75% of the design production (as production
will not reach design values 'overnight").
Assumptions used in the EUAC analyses are summarized in Table 3-4.
3.3.2 Non -cost Factors
Although cost is of paramount concern in the selection of a sludge management strategy, other
critical factors must be considered as well. For this study, each alternative was qualitatively
evaluated with respect to the following factors:
■ implementability - this factor, considers regulatory acceptability of the alternative and
public acceptance issues.
■ reliability - the selected alternative must provide a reliable outlet for sludge generated at
the WPCF; this factor considers the accessibility of back-up measures should the primary
outlet temporarily unavailable.
■ environmental impact - this factor considers the air quality, noise, aesthetic, and other
environmental impacts of each sludge management alternative.
■ beneficial use potential - in this evaluation, alternatives that take advantage of the
nutrients and organics in sludge through "recycling" methods such as composting are
viewed more favorably than those that use sludge as a waste product.
■ revenue potential - although revenue from sludge product sales is not guaranteed, the
potential for revenue generation must be considered in alternative evaluations.
For this study, each alternative was given a favorable, neutral, or unfavorable rating for each of
the above criteria. The non -cost evaluations were based be upon CDM experience with similar
facilities and specific knowledge of Mansfield's operations.
3.4 Alternative Descriptions and Evaluations
This section presents detailed descriptions of each alternative considered, costs associated with
the alternatives and the non -cost evaluations. Equipment replacement needs, new facility
needs, and alternative costs are presented in tabular form for each option. Non -cost evalua-
tions are described in the text.
All cost and non -cost evaluations are summarized in tabular form at the conclusion of the
section.
CDM Camp Dresser & McKee 3-6
2DI-160-aTdrs
TOWN OF MANSFIELD, MASSACHUSETTS
SLUDGE MANAGEMENT STUDY
TABLE 3-4
Cost Estimate Assumptions
Item
Planning Period
Discount Rate
Inflation Rate
Power Costs
abor Costs'
Supervising Operator
Operator
Skilled Laborer
2aterial Costs
Fuel
Sawdust
Woodchips
Disposable Piping
Gravel
Transportation Costs
Engineering News Record Construction Cost Index
& Contingency Allowance
1- includes salary cost plus 40% allowance for fringe benefits
20 Years
6.50%
3.00%
$0.10/kw-hr
$20.70/hr
$20.60/hr
$18.20/hr
$0.64/gal
$8.50/cubic yard
$6.00/cubic yard
$26.32/100 ft.
$5.50/cubic yard
$70/hr + $2.50/mile
Travel Speed = 40 mi/hr
5,532
35%
Jc.,
Evaluation of Sludge Management Alternatives
N
I
J
I
I
U
11
4
3.4.1 Scenario 1: Continuation of Existing Practice
This alternative assumes that sludge management practices at Mansfield will remain essential-
ly unchanged. Sludge will be dewatered at the WPCF, hauled to the Fruit Street site and
composted in the warmer months and landfilled in the winter months. Proposed improve-
ments are listed in Table 3-5 and 3-6 and are discussed below.
D vr�terine. Only lime system equipment replacement is proposed.
Lan fillingAssuming that filled landfill cells can be reclaimed as described in Section 3.2.3,
and that the cover: sludge ratio is reduced to 2:1, CDM estimates that existing onsite landfill
facilities can meet sludge disposal needs for about 10 years (about the same under current and
design sizing assumptions), at which time new facilities would have to be constructed.
The utilization of 2:1 covensludge ratios is contingent upon the purchase of a new low track
pressure grader, which should facilitate improved landfiliing operations.
com ostinn With the exception of a blower system upgrade, no major improvements other
than equipment replacement are planned. The blower system upgrade includes replacement of
the existing 1 horsepower (hp) blowers with 5 hp blowers and electrical system modifications
required to support the larger blowers. The upgrade is timed to coincide with the expected need
to replace the existing blowers (in 10 years).
CDM recommends the upgrade to increase temperature control in the composting process.
Since the Mansfield facility was constructed eleven years ago, practitioners have discovered
that temperature control is critical to the generation of a stable compost product and, more
importantly, that the air requirements for temperature control vastly exceed simple aeration
needs (upon which the Mansfield blowers were sized). The upgrade is intended to bring the
facility up-to-date with current compost science and minimize the curing time necessary to
ensure product stability.
The estimated costs for this alternative, assuming sludge production rates remain stable, are
presented in Table 3-5. Corresponding costs assuming design sludge production values are
presented in Table 3-6 and reflect the need to construct additional landfill capacity.
From the perspective of reliability and environmental impact, this scenario is given a favorable
rating. The flexibility of two onsite management methods (composting and landfilling) was
the deciding factor with respect to reliability. Consistency with current practice, with a corre-
sponding minimization of new facilities, additional traffic, odor emissions, etc, contributed to
the favorable ranking with respect to environmental impact.
With respect to all other criteria, the alternative has been assigned a neutral ranking - unce-
rtainty regarding regulatory approval of landfill reclamation, and only partial beneficial use
and revenue potential (as compared to full -year composting options) were deciding factors.
lei
CDM Camp Dresser & McKee
20W6Of)T-4TSK
TUt',., Ui� tii�,i��ir'16ir.,,u,:��.-��n..a�:.•,
SLUDGE MANAGEMENT STUDY
TABLE 3-5
Estimated Costs: Scenario 1 - Continuation of Existing Operations
Current Sludge Production
Item
Dewatering Composting
Land611ing
Total Costs
pital Costs
Year nReplacement
----- $150,000
-----
$150,000
Bulldozer Replacement -
•-•-
$100,000
Subtotal
$
$250.000
250,000
Year
Replace Trucks
----- $128,000
-----
$128,000
Replace Front End Loader
----- $214,000
----
$214,000
Replace Mixer
----- $122,000
•----
Subtotal
$122.005!
$464,000
Year 14
Replace Blowers
---- $63,000
$136,
-----
$63,000
Blower Electrical/ControlSystem
-----
...
,$136,000
$1,965000
$1,965,000 965000
Landfill Construction
Replace Lime System
$602,000 -----
•----
Subtotal
$602 000
$2,766,000
Operation and Maintenance Costs
Chemicals/Materials
Labor
Power
Fuel
Equipment Maintenance
Miscellaneous
Total Capital Expenditure (rounded):
Equivalent Uniform Annualized Capital Costs (rounded):
$46,700
$3,500
$32,100
$39,300
$14,800
$2,300
$0
$1,200
$5,000
$5,000
.0
$1.000
Subtotal $98,600
$52,300
Annual O & M Costs (rounded):
$19,200
$23,200
$8,900
$1,000
$3,500
$56,800
Total Equivalent Uniform Annualized Costs (rounded):
$3,480,000
$190,000
$69,400
$94,600
$26,000
$2,200
$13,500
$207,700
$210,000
$400,000
TOWN OF MANSFIELD, MASSACHUSETTS
SLUDGE MANAGEMENT STUDY
TABLE 3-6
Estimated Costs: Scenario I - Continuation of Existing Operations
Design Sludge Production
Item
Dewatering
Composting
Landfilling
Total Costs
Capital Costs
Year 0:
Screen Replacement
-----
$150,000
-----
$150,000
Bulldozer Replacement
-•-••
-••-•
$100,000
$100,000
Subtotal
$250,000
Year is
Replace Trucks
-----
$128,000
-----
$128,000
Replace Front End Loader
'-----
$214,000
-----
$214,000
Replace Mixer
-----
$122,000
-----
$122,000
Subtotal
$464,000
Year10
Replace Blowers
$63,000
-----
$63,000
Construct Landfill
-•-•-
-----
$1,965,000
$1,965,000
Blower Electrical/ContiolSystem
$136,000
-----
$136,000
Replace Lime System
$602,000
--• -
$602.000
Subtotal
$2,766,000
Total Capital Expenditure
(rounded):
$3,480,000
Equivalent Uniform Annualized Capital Costs (rounded):
$190,000
Operation and Maintenance Costs
Chemicals/Materials
$107,300
$7,900
$44,200
$159,400
Labor
$73,800
$90,400
$53,300
$217,500
Power
$34,000
$5,200
$20,400
$59,600
Fuel
$0
$2,700
$2,300
$5,000
Equipment Maintenance
$11,500
$11,500
$8,100
$31,100
Miscellaneous
$0
$2,300
$2,300
$4.600
Subtotal $226,600
$120,000
$130,600
$477,200
Annual O & M Costs (rounded):
$480,000
Total Equivalent Uniform Annualized Costs (rounded):
$670,000
Section 3
Evaluation of Sludge Management Alternatives
3.4.2 Scenario 2. Full -year Composting with Woodchips
Under this alternative, landfilling of sludge would be eliminated and replaced with year-round
composting. New and recycled woodchips would be used as amendments, as currently prac-
ticed. A new roof structure over the active composting pad and material storage areas would be
required to implement this scenario. Requirements for this alternative are detailed below.
Dewatering No improvements other than lime system replacement are proposed.
Land�filling Landfilling of sludge would be eliminated as the primary means of disposal in the
winter months. Remaining landfill capacity could provide back-up capacity for the landfill
operation and/or could be used to dispose of grit and screenings from the plant.
Composting In addition to equipment replacements, two key improvements are recommend-
ed to implement this option. First, the blower upgrade described for Scenario 1 should be
implemented immediately. Secondly, a roof structure should be constructed over the
composting pad and material storage areas to facilitate cold weather operations. Figure 3-1
illustrates the proposed to be covered by the roof structure. The structure, constructed of wood,
would have open sides and would cover about 24,300 square feet.
Costs associated with implementation of this option for current and design sludge production
quantities are presented in Tables 3-7 and 3-8, respectively.
A non -cost evaluation of this alternative provides a favorable rating with respect to
reliability, beneficial use potential and revenue potential. A neutral rating was assigned for
implementability and environmental impact.
With respect to reliability, this scenario was favorably rated as it provides an onsite back-up
should the composting facility be closed for a short -period.
Beneficial use and revenue potential were both rated favorably, as this option maximizes the
opportunity to "recycle' sludge and generate a small revenue stream. Potential revenues,
which could be estimated at $3 to $5 per cubic yard, will not offset operating costs but could
reduce net operating costs for this scenario.
With respect to implementability, the major regulatory issue to be addressed is air quality
permitting. The WPCF will have to demonstrate that the modified operation does not exceed
emission rates established by the Department of Environmental Protection (DEP); if these rates
are exceeded, then an air pollution control system will have to be installed.
Given the size and nature of the Mansfield operation, we believe that the composting opera-
tion will not trigger any DEP thresholds for air pollution control. This assumption must be
verified if this scenario is to be pursued.
CDM Camp Dresser & McKee 3-11
201-M-HTdTSK
�O ® O
on o -E
t
�> r
I �YIDN. Y
C Y N>
�,y N
xta ft�'re✓v_�
o q'vxh`x V C Y�°bzY
<r
p 5ti.� S
CL co
U
O
O
O
O
d
of
m
� O
/
A
E
a�
C
N
N
O
IL
0
U
T011 N OF ,VANSFIELD, MASSACHUSETTS
SLUDGE MANAGEMENT STUDY
TABLE 3.7
Estimated Costs: Scenario 2 - Year Round Composting with Wood Chips
Current Sludge Production
Item
Dewatering Composting Landfilling Total Costs
pital Costs
Year 0%•
Compost Cover
----- $1,237,500
----- $150,000
----- $1,237,500
$150,000
Screen Replacement
--•-- $,300
..... $47,300
Replace Blowers
Blower Electrical/ControlSystem
$]01,300
total �
$1,5300
536,100
Subtotal
Year 5'
Replace Trucks
... $128,000 $128,000
$214,000
----- $128,000
----- $214,000
Replace Front End Loader
--._.
$122,000
•••• $
Replace Mixer
464
Subtotal $464,000000
Year 10
Replace Lime System
and Maintenance Costs
Chemicals/Materials
Labor
Power
Fuel
Equipment Maintenance
Miscellaneous
$602,000 •••-• -----
Subtotal
Total Capital Expenditure (rounded):
Equivalent Uniform Annualized Capital Costs (rounded):
W.1 111
O 111
$2,600,000
$200,000
$46,700
$6,900
$0
$53,600
$32,100
$78,600
$0
$110,700
$14,800
$4,600
$0
$19,400
$0
$2,300
$0
$2,300
$5,000
$10,000
$0
$15,000
N
1=
N
1=
Subtotal $98,600
$104,400
$0
$203,000
Annual O & M Costs (rounded): $200,000
Total Equivalent Uniform Annualized Costs (rounded): $400,000
TOWN OF MANSFIELD, MASSACHUSETTS
SLUDGE MANAGEMENT STUDY
TABLE 3.8
Estimated Costs., Scenario 2 • Year Round Composting with Wood Chips
Design Sludge Production
Item Dewatedng Composting Landfiiling Total Costs
pital Costs
Compost Cover
- $1,237,500
- $1,237,500
Screen Replacement
- $150,000
- $150,000
Replace Blowers
- $47,300
- $47,300
Blower Electrical/Control System
- $101,300
- $101,300
Subtotal $1,536,100
YeR p50
lace Trucks
- $128,000
--- $128,000
Replace Front End Loader
- $214,000
- $214,000
Replace Mixer
- $122,000
- $121,000
Subtotal $464,000
Year 10
Replace Lime System
ition and Maintenance Costs
Chemicals/Materials
Labor
Power
Fuel
Equipment Maintenance
Miscellaneous
$602,000
Subtotal
Total Capital Expenditure (rounded):
Equivalent Uniform Annualized Capital Costs (rounded):
$107,300
$15,900
$0
$73,800
$180,800
$0
$34,000
$10,500
$0
$0
$5,400
$0
$11,500
$23,000
$0
$0
$4,600
$4
subtotal $226,600
$240,200
$0
Annual O & M Costs (rounded):
Ff-rowl1t
$2,600,000
$200,000
$123,200
$254,600
$44,500
$5,400
$34,500
$466,800
$470,000
Total Equivalent Uniform Annualized Costs (rounded): $670,000
Section 3
Evaluation of Sludge Management Alternatives
The option has been given a neutral rating with respect to environmental impacts because
full -year composting will increase emissions from the site on an annual basis. We expect,
however, that odor will not be an issue as the facility has successfully composted sludge during
"peak odor season" (summer) for many years with few complaints; composting during the
colder months, when odor complaints from most facilities abate, should not cause odor
problems offsite.
3.4.3 Scenario 3: Full -year Composting with Sawdust
This scenario differs from Scenario 2 only in that sawdust is used in place of woodchips as a
composting amendment. This option was considered to potentially improve compost quality
and streamline compost operations. Costs to implement the option at current and design
sludge production are presented in Tables 3-9 and 3-10, respectively. Implementation require-
ments for this alternative are described below.
Dewaterine No improvements other than lime system replacement are proposed.
Landfilline Landfilling of sludge would be eliminated as the primary means of disposal in the
winter months. Remaining landfill capacity could provide back-up capacity for the landfill
operation and/or could be used to dispose of grit and screenings from the plant.
comma_ oostiTie As noted above, this scenario differs from Scenario 2 only in the amendment
used - sawdust, rather than new and recycled woodchips. The use of sawdust would result in a
more uniform compost product, potentially increasing marketability. Screening requirements
would likely be less than those required to recover woodchips under Scenario 2. We recom-
mend that screening not be eliminated, however, as it can eliminate oversized sludge particles
that might diminish compost quality from an aesthetic perspective.
WPCP staff conducted a demonstration project using sawdust to determine the viability of
sawdust composting in the fall of 1995. The experiment was successful, but staff noted that if
sawdust composting was implemented, they would prefer to use a sawdust that had fewer fines
than the sawdust used in the demonstration. A discussion with the sawdust supplier indicted
that a coarser blend could be supplied, albeit at a higher cost ($8.50/cubic yard versus $6/cubic
yard). As noted on Tables 3-9 and 3-10, amendment costs are a significant portion of overall
compost operating costs, and so the impact of the higher amendment cost is correspondingly
large..
Aside from the amendment used, this scenario is essentially the same as Scenario 2, and it has
been ranked accordingly from a non -cost perspective. It received a favorable rating from the
reliability, beneficial use and revenue potential perspectives and a neutral rating with respect to
implementability and environmental impact.
CDM Camp Dresser & McKee 3-15
2o1.160AT4TSK
TOWN OF MANSFIELD, MASSACHUSETTS
SLUDGE MANAGEMENT STUDY
TABLE 3-9
Estimated Costs: Scenario 3 - Year Round Contposting with Sawdust
Current Sludge Production
Item Dewatering Composting Landfilling Total Costs
Capital Costs
Compost Cover
$1,237,500
•---- $1,237,500
Screen Replacement
---- $150,000
----- $150,000
Replace Blowers
$47,300
-•--- $47,300
Blower Electdcal/ControlSystem
-•--- $101,300
•---- $191,300
Subtotal $1,536,100
Years'
Replace Trucks
$128,000
$128,000
Replace Front End Loader
----- $214,000
----- $214,000
Replace Mixer
----- $122,000
----- $122,000
Subtotal $464,000
Year 10
Replace Lime System
ition and Maintenance Costs
Chemicals/Materials
Labor
Power
Fuel
Equipment Maintenance
Miscellaneous
$602,000 -----
Subtotal
Total Capital Expenditure (rounded):
Equivalent Uniform Annualized Capital Costs (rounded):
$46,700
$30,400
$0
$32,100
$78,600
$0
$14,800
$4,600
$0
$0
$2,300
$0
$5,000
$10,000
$0
$Q
$2,000
$4
Subrotal $98,600
$127,900
$0
Annual O & M Costs (rounded):
Total Equivalent Uniform Annualized Costs (rounded):
B�i131101#11
.I off
$2,600,000
$200,000
$77,100
$110,700
$19,400
$2,300
$15,000
$226,500
$230,000
$430,000
TOWN OF MANSFIELD, AIASSACHUSETTS
SLUDGE MANAGEMENT STUDY
TABLE 3.10
Estimated Costs: Scenario 3 - Year Round Composting with Sawdust
Design Sludge Production
tem
Dewatering Composting Landfilling
Total Costs
Year
Compost stCover
- $1,237,500 _
- $150,000
237,500
$1$150,000
rCompos
Replacement
- $47,300 -
$47,300
Blowers
-
- $101,300
$101.30subtotal
Electrical/Control System
$1,536,100
Trucks
$128,000 -
$128,000
$214,000
Front End Loader
$214,000 -
- -
- $122,000
$122000
Replace Mixer
Subtotal
$464,000
Year ace Lime System
$602,000 - -
Subtotal
$602,000
Total Capital Expenditure (rounded):
$2,600,000
Equivalent Uniform Annualized Capital Costs (rounded):
$200,000
Operation and Maintenance Costs
Chemicals/Materials
$107,300 $70,000 $0
$0
$177,300
$254,600
Labor
$73,800 $180,800
$34,000 $10,500 $0
$44,500
Power
$0 $5,400 $0
$5,400
Fuel
Equipment Maintenance
$11,500 $23,000 $0
io-00
$34�,550000
Miscellaneous
Subtotal
$0 $4,600
$226,600 $294,300 $0
$520,900
Annual O & M Costs (rounded):
$520,000
Total Equivalent Uniform Annualized Costs (rounded): $720,000
Section 3
Evaluation of Sludge Management Alternatives
3.4.4 Scenario 4: Full -year Landfilfing
This alternative assumes that all composting activity in Mansfield will cease and be replaced
with onsite landfilling of dewatered sludge. Implementation requirements are discussed
below.
Dpwatering No improvements other than lime system replacement are proposed.
Landfilling Under this scenario, new landfill cells will need to be constructed in year 5.
At this time, it appears that adequate areas may be available to develop new landfill capacity. A
more detailed assessment will be required to confirm this assumption, however. If sufficient
area is not available, the landfill expansion could be sited in the area now used for composting.
Equipment replacement and capital requirements for this option under current sludge and
design production scenarios are presented on Tables 3-11 and 3-12, respectively, along with
alternative costs.
From a non -cost perspective, this option was given a favorable rating with respect to environ-
mental impacts, a neutral rating for implementability and reliability, and an unfavorable
rating with respect to beneficial use and revenue potential.
The favorable rating for environmental impacts was assigned because overall (annual) facility
emissions are likely to be reduced from current levels. The implementability rating was
governed by the uncertainty regarding reclamation.
With respect to reliability, this option has been given a neutral rating based upon a presumed
lack of back-up capacity late in the planning period (which is not likely to be an issue in the
near future).
The unfavorable ratings for beneficial use and revenue potential are self-explanatory, as no
products are generated.
3.4.5 Scenario 5. Hauling Liquid Sludge
Under this scenario, dewatering operations at the WPCF would be eliminated, as would
landfilling and composting operations. Liquid sludge would be hauled to proximate incinera-
tor or drying operations for subsequent processing. For this option, we have assumed that the
WPCF can produce a liquid sludge with a 4% solids content.
Because chemicals to aid dewatering are not required under this option, the dry tonnage
requiring disposal is about 25 percent less than the corresponding tonnage for alternatives that
manage dewatered sludge. Current and design productions used to assess liquid hauling
options are therefore 1,017 dtpy and 2,340 dtpy, respectively.
CDM Camp Dresser & McKee 3-18
20W6ORT-4TSK
TOWN OF MANSFIELD, ,11ASSACHUSETTS
SLUDGE MANAGEMENT STUDY
TABLE 3-11
Estiulated Costs: Scenario 4. Year Round Landfiiling
Current Sludge Production
Item Dewatering Composting Landfilling Total Costs
pital Costs
Year
----- $100,000
$19i69.OSc
Bulldozer Replacement
._...
subtotal
$100,000
Year 5.
___ ----- $128,000
$128,00
Replace Trucks
..... $214,000
$214,000
Replace Front End Loader
____
-__-- $5,124,000
$.411A.00
Landfill Construction
----- subtotal
$5,466,000
Year 10
Replace Lime System
$602,000 -----
subtotal
• 6 02.00
$602,000
Total Capital Expenditure (rounded): $ ,170,000
0,000
Equivalent Uniform Annualized Capital Costs (rounded):
ttion and Maintenance Costs
$46,700
$0 $80,950
$127,700
Chemicals/Materials
$32,100
$0 $23,200
$55,300
Labor
$14,8
$0 $8,900
$23,700
Power
$0
$0
$0 $1,000
$1,000
Fuel
$5,000
$0 $3,500
$8,500
Equipment Maintenance
K
$4 $1,000
Lm
Miscellaneous
subtotal $98,600
$0 $118,600
$217,200
Annual O & M Costs (rounded):
$220,000
Total Equivalent Uniform Annualized Costs (rounded):
$ 620,000
TOWN OF MANSFIELD, MASSACHUSETTS
SLUDGE MANAGEMENT STUDY
TABLE 3.12
Estimated Costs. Scenario 4 • Year Round Landfilling
Design Sludge Production
Item
Dewateting Composting Landfilling
Total Costs
pital Costs
Year0;
— $100,000
1000 5� 0.0
erReplacement
—
Subtotal
$100,000
Year 5:
_ $128,000
$128,000
Replace Trucks
— $214,000
$214,000
Replace Front End Loader
—_ — $5,124,000
0
Landfill Construction
Subtotal
$5,466,000
Year 10
Replace Lime System
and Maintenance Costs
Chemicals/Materials
Labor
Power
Fuel
Equipment Maintenance
Miscellaneous
$602,000
Subtotal
Total Capital Expenditure (rounded):
Equivalent Uniform Annualized Capital Costs(rounded):
$107,300
$0
$186,200
$73,800
$0
$53,300
$34,000
$0
$20,400
$0
$0
$2,300
$11,500
$0
$8,100
S4
a4
$2,300
Subtotal $226,600
$0
$272,600
Annual O & M Costs
(rounded):
$6,170,000
$400,000
$293,500
$127,100
$54,400
$2,300
$19,600
$1,300
$499,200
$500,000
Total Equivalent Uniform Annualized Costs (rounded): $900,000
Je,:Ilon 5
Evaluation of Sludge Management Alternatives
Capital expenditures required to implement this option are minimal, including only modifica-
tions to ensure that sludge can be pumped into transport vehicles in a reasonable amount of
time. Labor requirements are not expected to differ significantly from dewatering require-
ments, as plant staff will be required to oversee pumping operations to haulers and, when time
permits, can be assigned to other WWTF tasks,
CDM contacted the following three sludge incinerators to assess potential costs for this option:
■ New England Treatment Company (NETCO), Woonsocket, RI. Discussions with NETCO
indicate that they would be willing to accept liquid sludge from Mansfield at this incinera-
tion facility. NETCO estimates a disposal cost of $260/dry ton (dt) and transportation costs
of $175/9,000 gallon load. They note that a surcharge of $75/ half hour will be charged for
sludge loading times that exceed 45 minutes. Long-term and short-term contracts are
available.
■ Upper Blackstone Water Pollutibn Abatement District (UBWPAD), Worcester, MA. The
District operates an incinerator and accepts liquid sludge with solids contents of 4.3% or
more. They are willing to accept sludges with a lower solids content (such as Mansfield),
but these sludges are considered to be septages under their fee schedule and a tip fee of
$47/1,000 gallons is charged for their incineration. The tip fee for higher solids sludges is
$260/dt, not including transportation. Long-term and short-term contracts are available.
The District.does not provide transportation services.
■ City of Fitchburg, MA. Fitchburg's incinerator will be expanding at the end of this year
from a capacity of 1.2 dt/hour to 2.25 dt/hour. In the meantime, they are not accepting
new contracts. Current tip fees at the facility are $225/dt, excluding transportation; tip fees
at the expanded facility will not be determined until March 1997. Fitchburg staff report
that sludges incinerated at the facility must meet minimum criteria of 4% solids content
and 70% volatile solids content.
Since neither UBWPAD or Fitchburg provide transportation services, estimates for the use of
commercial hauling services were generated based on the cost assumptions presented in Table
3-4. EUAC costs for this scenario, based on current sludge production, are presented in Table 3-
13. Table 3-14 presents corresponding costs based upon design sludge production.
A non -cost evaluation of this scenario resulted in a favorable rating with respect to
implementability and reliability, a neutral rating for environmental impact, and unfavorable
ratings with respect to beneficial use and revenue potential.
The scenario was rated favorably with respect to impiementability and reliability because
regulatory constraints to implement this scenario are expected to be minimal and the existing
landfill can be used to provide back-up capacity, providing reliability.
3.21
CDM Camp Dresser & McKee
20060-RT-4TSK
TOR'A' OF MANSFIELD, MASSACHUSETTS
SLUDGE MANAGEMENT STUDY
TABLE 3.13
Estimated Costs: Scenario 5 - Liquid Haul and Disposal
Current Sludge Production
Item
Dewatering Transportation Disposal
Total Costs
Capital Costs
Year 0*
Pumping Modifications
— $200,000
subtotal
$200,000
$200,000
Total Capital Expenditure (rounded):
$200,000
Equivalent Unifom: Annualized Capital Costs (rounded):
$20,000
Operation and Maintenance Costs
NETCO (Woonsocke4RI)
$32,100 $118,500 $264,400
$415,000
Fitchburg (Fitchburg, MA)
$32,100 $264,000 $228,800
$524,900
UBWPAD (Worcester, MA)
$32,100 $170,000 $286,000
$498,100
Annual O & M Costs (NETCO):
$420,000
Annual O &M Costs (Fitchburg):
$520,000
Annual O & M Costs (UBW PAD):
$490,000
Total Equivalent Uniform Annualized Costs (NETCO):
$440,000
Cost per Dry Ton:
$433 /dt
Total Equivalent Uniform Annualized Costs (Fitchburg):
$540,000
Cost per Dry Ton:
$531 /dt
Total Equivalent Uniform Annualized Costs (UBWPAD):
$510,000
Cost per Dry Ton:
$501 /dt
TO R'N OF MANSFIELD, MASSACHUSETTS
SLUDGE MANAGEMENT STUDY
TABLE 3-14
Estimated Costs: Scenario 5 • Liquid Haul and Disposal
Design Sludge Production
Item
Capital Costs
Year 0:
Pumping Modifications
ttion and Maintenance Costs
NETCO (Woonsocket, RI)
Fitchburg (Fitchburg, MA)
UBWPAD (Worcester, MA)
Dewatering Transportation
Disposal
Subiorat
Total Capital Expenditure (rounded):
Equivalent Uniform Annualized Capital Costs (rounded):
Total Costs
11 11I1
11 111
$200,000
$20,000
$32,100 $272,600 $608,100 $912,800
$32,100 $607,200 $526,200 $1,165,500
$32,100 $391,000 $657,800 $1,080,900
Annual O & M Costs (NETCO):
Annual O & M Costs (Fitchburg):
Annual O & M Costs (UBWPAD):
Total Equivalent Uniform Annualized Costs (NETCO):
Cost per Dry Ton:
Total Equivalent Uniform Annualized Costs (Fitchburg):
Cost per Dry Ton:
Total Equivalent Uniform Annualized Costs (UBWPAD):
Cost per Dry Ton:
I
$910,000
$1,170,000
$1,080,000
$930,000
$397 /dt
$1,190,000
$508 /dt
$1,100,000
$469 /dt
Evaluation of sludge Management Alternatives
Environmental impacts were judged to be neutral, in that truck traffic would likely increase but
overall impacts might be offset by reductions in emissions from composting operations.
The unfavorable rating for beneficial use and revenue potential is self-explanatory, as no
product would be generated.
3.4.6 Scenario 6: Hauling Dewatered Sludge
This alternative is similar to Scenario 5 in that sludge would be hauled to a commercial facility
for processing or disposal. Unlike Scenario 5, however, the sludge would be dewatered (as
currently practiced) at the WPCF.
Capital expenditures required to implement this option are limited to the replacement of the
lime system in Year 10 of the planning period.
The following commercial establishments were contacted to develop costs for this scenario.
■ New England Treatment Company (NETCO), Woonsocket, RI. This incinerator, described
under Scenario 5, is also capable of accepting dewatered sludges with solids contents
ranging from 25% to 35%. A surcharge is applied to sludges that do not fall into this
range. Quoted disposal and transportation costs for this facility are about $260/dt and
$175/load.
■ Wheelabrator, Rochester, NH. Wheelabrator will accept sludges for its operations in
Rochester at the Turnkey landfill or the International Process Systems composting facility.
Sludges accepted at the landfill must be stabilized (the lime used to dewater sludge at
Mansfield should meet this requirement) and have a minimum solids content of 20%.
Sludges destined for composting do not need to meet stabilization requirements. Tip fees
(exclusive of transportation) at the landfill are $55 to $95 per wet ton, while composting
tip fees are $50 to $75 per wet ton, depending on product quality. For this analysis, we
have assumed a tip fee of $70/wet ton, equivalent to $200/dt for Mansfield's 35% solids
sludge. Transportation services are provided by Wheelabrator, but detailed costs were not
provided.
■ Partyka Resource Management, Chicopee, MA. Because Partyka has expressed an interest
in taking sludge at its Chicopee landfill in the past, CDM attempted to contact the compa-
ny to obtain current tip fee information. Partyka staff did not respond to CDM requests,
however, and quotes solicited in 1994 (for another project) have been used to estimate
disposal costs at this facility. At that time, Partyka quoted tip fees of $75/wet ton ($214/dt
for a 35% solids sludge). Transportation services are not provided.
Estimates for the use of commercial hauling services (for facilities other than NETCO, where
transportation costs were provided) were generated based on the cost assumptions presented in
Table 3-4.
3-24
CDM Camp Dresser & McKee
2oJ.J6ORT-4T$K
TOIIW OF n9ANSP/ELD, n1ASSACHUSETTS
SLUDGE MANAGEMENT STUDY
TABLE 3.15
Estimated Costs: Scenario 6. Cake Haul and Disposal
Current Sludge Production
Item
Capital Costs
Year 10
Replace Lime System
atlon and Maintenance Costs
NETCO(Woonsocket, RI)
Partyka (Chicopee, MA)
Wheelabrator (Rochester, NH)
Dewatering Transportation
$602,000
Disposal Total Costs
$602.000
Subtotal $602,000
Total Capital Expenditure (rounded):
Equivalent Uniform Annualized Capital Costs (rounded):
$89,400 S45,500 $356,000
$89,400 $106,100 $294,000
$89,400 $181,000 $274,400
Annual O & M Costs NETCO (Woonsocket, RI):
Annual O & M Costs Partyka (Chicopee, MA):
Annual O & M Costs Wheelabrator (Rochester, NM:
Total Equivalent Uniform Annualized Costs NETCO(Woonsocket, RI):
Cost per Dry Ton:
Total Equivalent Uniform Annualized Costs Partyka (Chicopee, MA):
Cost per Dry Ton:
Total Equivalent Uniform Annualized Costs Wheelabrator (Rochester, NH):
Cost per Dry Ton:
$600,000
$30,000
$490,900
$489,500
$544,800
$490,000
$490,000
$540,000
$520,000
$379 /dt
$520,000
$379 /dt
$570,000
$415 /dt
TOWN OF MANSFIELD, MASSACHUSETTS
SLUDGE MANAGEMENT STUDY
TABLE 3.16
Estimated Costs: Scenario 6 • Cake Haul and Disposal
Design Sludge Production
Item Dewatering Transportation Disposal
Total Costs
Capital Costs
10:
Year
Replace Lime System $602,000
$602,000
subtotal
$602,000
Total Capital Expenditure:
$600,000
Equivalent Uniform Annualized Capital Costs:
$30,000
Operation and Maintenance Costs
NETCO(Woonsocket,RI) $205,600 $104,700 $818,800
$1,129,100
Partyka (Chicopee, MA) $205,600 $244,000 $676.200
$1,125,800
Wheelabrator (Rochester, NH) $205,600 $416,300 $631,100
$1,253,000
Annual O &M Costs NETCO (Woonsocket, RI):
$1,130,006
Annual O & M Costs Partyka (Chicopee, MA):
$1,130,000
Annual O & M Costs Wheelabrator (Rochester, NH):
$1,250,000
Total Equivalent Uniform Annualized Costs NETCO(Woonsocket, RI):
$1,160,000
Cost per Dry Ton:
$367 /dt
Total Equivalent Uniform Annualized Costs Partyka (Chicopee, MA):
$1,160,000
Cost per Dry Ton:
$367 /dt
Total Equivalent Uniform Annualized Costs Wheelabrator (Rochester, NH):
$1,280,000
Cost per Dry Ton:
$405 /dt
Section 3
Evaluation of Sludge Management Alternatives
t'.
EUAC costs for this scenario, based on current sludge production, are presented in Table 3-15.
Table 3-16 presents corresponding costs based upon design sludge production.
This scenario is essentially the same as Scenario 5, and it has been ranked accordingly from a
non -cost perspective with one exception. It received a favorable rating from implementability
and reliability perspectives, a neutral rating with respect to environmental impacts, and
unfavorable rating with respect to revenue potential. Unlike Scenario 5, however, it received a
neutral ranking for beneficial use potential as the possibility of beneficial use exists through at
least one of the commercial facilities contacted.
3.5 Evaluation Summary
The results of cost analyses are summarized on Table 3-17. Figure 3-2 presents a matrix sum-
marizing the results of non -cost analyses.
As shown on Table 3-17, the costs for Scenarios 1, 2 and 5 (NETCO only) are essentially equal
and represent the most cost-effective options for the Town at current sludge production
quantities. As sludge production increases, Scenarios 1 and 2 remain the lowest cost options
(and, in fact, are equal in cost at design sludge quantities), but all other scenarios become far less
cost-effective. This phenomenon indicates that sludge production is a driving factor in cost-
effectiveness.
It should be noted that the costs presented for Scenario 2 have not accounted for potential
revenues from product sale. Inclusion of these revenues could potentially result in this option
being the most cost-effective sludge management option for the Town
Composting with sawdust does not appear to be cost-effective at this time. Sawdust costs, and
the loss of the cost benefit of woodchip recycling, are the likely causes of the relatively high cost
of this option.
Non -cost evaluations indicate that full -year composting with woodchips or sawdust ranks
slightly higher than Scenario 1 (continuation of existing practice). All other alternatives were
far less favorable from a non -cost perspective.
Though not directly considered in the non -cost evaluations, the potential of each scenario for
continued operation beyond the planning period cannot be ignored. From this perspective, the
full -year composting options offer the greatest benefit to the Town, as only equipment replace-
ment will be required to extend the facilities useful life beyond the planning period. Year-
round landfilling, however, will completely eliminate the sludge management capacity of the
Fruit Street site by the end of the planning period, such that the Town will be forced to "start
from scratch" with respect to long-term sludge management.
CDM Camp Dresser & McKee 3-27
201•16"T-4TSK
T01VA' OF MANSFIELD, MASSACHUSETTS
SLUDGE MANAGEMENT STUDY
TABLE 3.17
Cost Summary for Sludge Management Study
Scenario
Estimated
Capital Cost
Equivalent
Uniform
Annualized
Capital Cost
Annual
Operations and
Maintenance
Costs
Total Equivalent
Uniform
Annualized Cost
Cost per Dry
Ton
Scenario 1: Continuation of Existing Operations
Current Sludge Production
$3,480,000
$190,000
$210,000
$400,000
$292
Design Sludge Production
S3,480,000
$190,000
$480,000
$670,000
$212
Scenario 2: Year Round Composting
with Wood Chips
Current Sludge, Production
$2,600,000
$200,000
$200,000
$400,000
$292
Design Sludge Production
$2,600,000
$200,000
$470,000
$670,000
$212
Scenario 3: Year Round Composting with Saw Dust
Current Sludge Production $2,600,000 $200,000 $230,000 $430,000 $313
Design Sludge Production S2,600,000 $200,000 $520,000 $720,000 $228
Scenario 4: Year Round Landfrlling
Current Sludge Production
$6,170,000
$400,000
$220,000
$620,000
$452
Design Sludge Production
$6,170,000
$400,000
$500,000
$900,000
$285
Scenario 5: Liquid Haul and Disposal
Current Sludge Production
NETCO
$200,000
$20,000
$420,000
$440,000
$433
Fitchburg
$200,000
$20,000
$524,900
$540,000
$531
UBWPAD
$200,000
$20,000
$488,100
$510,000
$501
Design Sludge Production
NETCO
$200,000
$20,000
$910,000
$930,000
$397
Fitchburg
$200,000
$20,000
$1,170,000
$1,190,000
$508
UBWPAD
$200,000
$20,000
$1,080,000
$1,100,000
$469
Scenario 6: Cake Haul and Disposal
Current Sludge Production
NETCO (Rl)
$600,000
$30,000
-
$490,000
$520,000
$379
Partyka(MA)
$600,000
$30,000
$490,000
$520,000
$379
Wheelabrator (NH)
$600,000
$30,000
$540,000
$570,000
$415
Design Sludge Production
NETCO(RI)
$600,000
$30,000
$1,130,000
$1,160,000
$367
Partyka(MA)
$600,000
$30,000
$1,130,000
$1,160,000
$367
Wheelabrator (NH)
$600,000
$30,000
$1,250,000
$1,280,000
$405
Scenario
1. Continuation of Existing
Practice
CI
O
O
2. Full -year Composting with
Woodchips
(3
O
�
O
O
O
3. Full -year Composting with Sawdust
Sawdust
�
O
O
O
O
4. Full -year Landfilling
O
•
•
(01
5. Hauling Liquid Sludge
O
O
(3
•
6. Hauling Dewatered
Sludge
O
O
•
Rating:
O= Favorable
® = Neutral
= Unfavorable
Town of Mansfield, MA
Sludge Management Study
Figure 3-2
CDM Camp Dresser & McKee Non -Cost Evaluation Summary
ff
ection
Four
Section 4
Recommendation
Based on cost and non -cost evaluations, two management options - Scenarios 1 and 2 - appear
to offer the greatest benefit to the Town. Scenario 1 (continuation of existing practice) and
Scenario 2 (full -year composting with woodchips) ranked equally in cost evaluations. Scenario
2 ranked slightly higher than Scenario 1 in the non -cost evaluations. Considering both cost
and non -cost factors, the two scenarios must be ranked as equals.
Based upon the relative equality of the two options, the Town may wish to consider continued
implementation of Scenario 1 in the near term. Efforts to secure compost markets (currently
being investigated by CDM) should then be completed to allow Scenario 2 to be implemented as
a long-term solution without concerns regarding compost distribution. Scenario 2 offers the
long-term, benefits of higher potential revenues from compost sales and a maximum conserva-
tion of existing landfill capacity.
CDM Camp Dresser & McKee 4-1