HomeMy WebLinkAboutLead & Copper - 2016® Commonwealth of Massachusetts
Executive Office of Energy & Environmental Affairs
Department of Environmental Protection
Southeast Regional Office • 20 Riverside Drive, Lakeville MA 02347.508-946-2700
Charles D. Baker;" Matthew A. Beaton
Governor t W _�,;" Secretary
Karyn E. Polito NOV/r Martin Suuberg
Lieutenant Governor ` 3�'r 97&9 v 2it? 1 Commissioner
LEAD AND COPPER (LCR) REVIEW SUMMARY SHEET
Requirements for Svstems that meet the Action Levels
(90 percentile result was equal to or less than the Action Level)
The following is a review summary sheet for the results you submitted to the Department of Environmental Protection
(MassDEP) for the compliance and monitoring period specified. This sheet is intended to help you remain in compliance with
the LCR. To maintain compliance with the LCR you must take the specific action(s) checked (®) below with their respective
compliance dates. Please refer to the Drinking Water Regulations (310 CIVIR 22.00) for specific requirements relative to Lead
and Copper and Consumer Confidence Report Rules.
PWS Name: I MANSFIELD WATER DIVISION I PWS ID#: 14167000 1 TOWN: I MANSFIELD
Sampling Date(s): 9/13-15/2016 Round #: 4 ® Revised Form
Compliance Period: 1/1/2014 to 12/31/2016 Frequency:❑ Semiannual ❑ Annual ® Every 3 Years
Monitoring Period: 6/l/2016 to 9/30/2016 Number of Samples Required? 30
School/Childcare samples required per 310 CMR 22.06B(7)(a)9? Yes ®, No ❑
Is PWS Currently providing treatment? Yes ®, No ❑
SAMPLING RESULTS FOR LCR COMPLIANCE for the period specified above:
Parameter
Action Level (AL)
(mg/1)
90` %
(mg/1)
90` %>AL?
#
samples
# samples
above AL
Lead
0.015
0.004
no
31
1
Copper
1.3
0.590
no
31
0
® SCHOOL/CHILDCARE RESULTS for the period specified above:
School/ Sampling Results required by 310 CAM 22,06B(7)(a)9: This is an additional requirement for community water
supplies with every sampling round unless the school/childcare facility has its own well. These four diagnostic samples are in
addition to the minimum number required and the results are not used in determining the 906 percentiles for lead and copper.
These samples are used to educate the school/school district or facility on the importance of lead and copper sampling and the
MassDEP Lead Contamination Control Program (LCCA) for schools and facilities. The results for two (2) sampling sites
(kitchen and drinking water source, such as a water fountain) for each of hvo schools/ facilities are summarized in the table
below:
School/Childcare Sampling Location
Lead (mg/1)
> AL?
Copper (m /I)
> AL?
170 SCHOOL ST- KITCHEN
0.001
no
0.21
no
170 SCHOOL ST - BATHROOM
0.002
no
0.24
no
17 WEST ST- BATHROOM
0.001
no
1.09
no
17 WEST ST - KITCHEN
0.001
no
0.06
no
This Information is available In alternate format. Call the MassDEP Diversity Office at 617-556-.1139. TTY# Mass Relay Service 1-800.439.2370
MassDEP Website: w .massoov/dep
Printed on Recycled Paper
PWS REQUIREMENTS WHEN THE LEAD & COPPER ACTION LEVELS ARE MET:
To maintain compliance with the LCR you must take the specific action(s) checked (ED below ivith their respective compliance
dates.
® Notification to sampling program participants (Consumer Notice) required by 310 CMR 22.06B (6)(c): All water
systems must deliver a consumer notice of lead and copper tap water monitoring results to persons served by the water
system at sites that are tested as soon as practical, but no later than 30 days after the system leams of the tap monitoring
results.
A notification template for participating homeowners/individuals is available at:
http://www.mass.eov/eea/docs/dephvater/approvals/year-thru-atpha/e-thru-Nerhn doc
A notification template for participating schools or childcare facilities is available at:
http://www.mass.eov/eea/docs/dep/water/approvals/year-thru-all2ha/e-thru-IAcrsn doc
The Consumer Notice shall also include an explanation of the health effects of lead, steps consumers can take to reduce exposure
to lead in drinking water, contact information for the public water system, the MCLG and action level for lead. MassDEP
recommends that you also include a copy of the Massachusetts Department of Public Health's (MDPH) fact sheet on lead with
your consumer notice. MDPH factsheets are available at mvw.mass.gov/dph/lead-sources
® Certification of notice to sampling program participants (Consumer Notice) required by 310 CMR 22.06B(6)(c): As
soon as practical, but no later than within 90 days of the end of the monitoring period noted above, submit to MassDEP
certification that persons served by the taps tested have been notified of the results. For a copy of the Certification form see
http://www.mass.izov/eea/docs/dephvater/approvals/vear-thru-alpha/e-thru-Mcrceit doc
® Consumer Confidence Reporting (CCR) required by 310 CMR 22.16A: Community systems are required to include lead
and copper results as provided above in your Consumer Confidence Report (CCR) except lead must be reported in parts per
billion (ppb). For example, 0.015 mg/1 is 15 ppb. Please note that every CCR must include a short informational statement
about lead in drinking water and its effects on children. Please refer to the CCR requirements of 3lb CMR 22.16A(12). For a
copy of the CCR Certification form see http:/hnvNv.mass.gov/eea/docs/dephvater/approvals/year-thru-alpha/06-thru-
d/ccrcert.doc
❑ Schools/Childcare Facilities that are a PWS or were sampled by a community system: Please remove from service any
sites where the sample result was elevated for lead and/or copper until corrective action(s) have been taken. Within 60 days of the
end of the Monitoring Period, please investigate & notify MassDEP of corrective actions taken to address the elevated lead and/or
copper result(s) for samples collected from this school/childcare. Follow the MassDEP LCCA Follow-up Steps for Schools or
Childcare Facilities listed at http://wavw.mass.gov/eea/docs/dephvater/drinking/alpha/i-thrtrzJpbfacts2 doc .
® School/Childcare Sampling required by 310 CMR 22.06B(7)(a)9: Sampling requrements
Community systems that serve any schools/childcare facilities must rotate through their list of schools/childcare facilities and
collect at least two samples (kitchen and bubbler/fountain) from two schools/childcare facilities during the next sampling round.
Samples are to be 250 ml wide -mouthed bottles and follow, the same first draw sampling protocol as residential sampling.
Samples are to be collected when the school is in regular use. For schools sampling procedures see
® Systems on reduced monitoring in accordance with 310CMR 22.06B: Your system is on a reduced sampling frequency.
Your next round of 30 must be collected during the monitoring period of June 1— September 30, 2019. Please follow your
Water Quality Sampling Schedule and your approved Lead and Copper Sampling Plan.
❑ After approval of the overall sampling plan (LCR-A) by MassDEP, alternative LCR sites may be used without additional
prior approval if: (1) the primary site was not above the LCR action level during the previous sampling round (if previously
sampled) and (2) the alternate site is at the same or higher tier than the primary site. Alternately, if these two criteria cannot
be met then prior written approval from MassDEP is required prior to using the alternate site. The use of alternate sites
requires completion of the "Lead and Copper Sampling Plan Change in Sampling Site" form for each alternate site used and
submittal of the form(s) to MassDEP with the lead and copper results for the round. A copy of the Lead and Copper
Sampling Plan Change in Sampling Site Form is located at http://Nvww.mass.gov/eea/docs/dephvater/approvals/year-thru-
alpha/m-thru-s/pbcuchn g. doc
❑ Eligibility for Sampling Reduction in accordance with 310 CMR 22.0613:
A reduction in the frequency of lead/copper sampling is approved: ❑ Annual ❑ Every 3 years. Your next round of [insert
# of sites] must be collected during the monitoring period of June 1— September 30, [insert year]. Please see the attached
revised sampling schedule for your water system.
Please be aware that if you have been approved for a reduction in the frequency of lead and copper sampling and you
routinely collected more than 5 samples per Monitoring Period, you qualify for a one time reduction in the minimum number
of samples required to be collected. In order to be approved for a reduction in the minimum number of samples required,
you must submit a revised sampling plan to MassDEP for review and approval. In developing your revised sampling plan
please use the latest sampling round, order the results starting with the lowest lead level and then select every odd numbered
site for inclusion in the reduced monitoring plan. However, all Tier 1 sites must be included before a Tier 2 site can be
included. Your revised sampling plan must be submitted to MassDEP for review by
® Corrosion Control Treatment as required by 310 CMR 22.06B(3)(c)3: For water systems that utilize corrosion control
treatment, it is required that they periodically monitor water quality parameters (e.g., pH, alkalinity, inhibitor residual) to
ensure that the treatment system is operating optimally and in accordance with target level(s) identified in your desktop study
or permit. These parameters can be easily measured in the field by the certified operator at the same time samples for
bacteriological analysis are collected from the finished water entry point (plant tap) and at routine distribution sampling
locations.
® EPA and MassDEP recommend that systems with corrosion control treatment follow the New EPA "Optimal Corrosion Control
Treatment Evaluation Technical Recommendations", when evaluating corrosion control treatment issues. These recommendations
provide the most appropriate treatment for controlling lead and copper and complying with the corrosion control treatment (CCT)
requirements of the LCR. It is particularly useful for those systems that repeatedly fail to meet the Lead Action Level or are in
close proximity to the Action Level. It is an opportunity for PW Ss to re-evaluate treatment techniques in the context of possible
changing water quality or the need of a more effective method of treatment. The document is available at:
https //www.epa gov/dNvregido/optimal-corrosion-control-treatment-evaluation-technical-recommendations
® Other: Please investigate the high lead level at 23 Plantingfield Drive.
Failure to take any required corrective actions within the deadlines identified above may subject you to enforcement.
Violations of M.G.L. c 111, § 160 and 310 CAM 22.00 may result in fines up to $25,000 per day and/or imprisonment up to one
year for each day the violation continues.
REMINDERS
Please see MassDEP recommendations on sharing information with consumers on lead and copper results, lead service line locations,
having your certified laboratories use eDEP for reporting drinking water analysis, and other EPA and MassDEP LCR
recommendations. These recommendations are located at http/hvww mass gov/eea/agencies/niassdep/water/drinking/lead-in-
drinkina-water.htnil
AVAILABLE RESOURCES
Reporting forms are available on the MassDEP website at: hu:/hvww.mass.gov/eea/aFencies/massdep/water/approvals/drinking-
water-forms.html#9
For more information on the Lead and Copper Rule, see
httr)•/hvww mass.gov/eea/agencies/massdep/water/approvals/drinking-water-forms.html#10 or contact the Drinking Water Program at
program.director-dwp@state.ma.us or 617-292-5770.
For additional health information to share with you consumers see Massachusetts Department of Public Health's fact sheet on lead
located at http•//vww mass gov/eohhs/docs/dph/environmentaUtead/lead-drinking-water-faq-2016.pdf.
For EPA Lead and Copper Rule Monitoring and Reporting Guidance see
https://nepis.epa.gov/Exe/ZYPUR-L.egi?Dockey--P I OODP2Ptxt
FOR QUESTIONS AND MORE INFORMATION
Please contact:
Name:
Phone #:
Email:
Giliane Tardieu
(508) 9d6-2789
Giliane.tardieu@state.ma.us
/L
Drinking Water Program
Attachment(s): ❑ Revised Sampling Plan Form WQA-A
cc:
With attachments: Certified Operator:
W/o attachments:
Mansfield Board of Health ®ecc
MDPH ❑ecc
DEP Use Only: ® Data Entry-WQTS
File Copy
Y/SERONANSFIELD/4167000-LCR4 11-15-2016
Final 10-19-16
Date
■No
❑ecc
EI
L