Loading...
HomeMy WebLinkAboutBranch St. #271- 2010July 2�10 Mr. William R. Ross Mansfield Town Manager Town Manager's Office 6 Park Row Mansfield, MA 02048 AECOM 2 Technology Park Drive Westford, MA 01886-3140 1- I 978.589.3000 978.589.3100 let fax Subject: Notice of Availability, Phase IV Remedy Implementation Plan (RIP) Modification (July 2010 Modification) Former Compo Chemical Landfill, Branch Street, Mansfield MA, MassDEP RTN 4-0104 Dear Mr. Ross: Per the public notification requirements of the Massachusetts Contingency Plan (MCP), 310 CMR 4b.1403(3)(e), this letter is to inform you that AECOM, on behalf of IRG Mansfield, LLC of Littleton. Colorado, has completed and will be submitting to the Massachusetts Department of Environmental Protection (MassDEP) a Second Phase IV Remedy Implementation Plan (RIP) Modification (July 2010 Modification) for the former Compo Chemical Landfill located at 271 Branch Street in Mansfield. You may obtain a copy of the aforementioned document at the MassDEP Southeast Regional Office (SRO), 20 Riverside Drive, Lakeville, MA 02347. Or, you can use the Site File Viewer on the web. Go to: http://Public.dep.state,ma.uslwsc viewer/main.aspx and enter the Transaction IDs for this submittal (322563) in the box and click search. You can then download the transmittal forms and report in PDF. No other actions beyond the receipt of this letter are required by you. On October 1, 2008. AECOM (former ENSR) notified you about the planned remediation at the former Compo Chemical site, including a summary of the proposed remedial activities and the availability for review of a Phase III Amendment/Phase IV -Remedy Implementation Plan (dated October 2008) for the site. The remedial activities as outlined in the October 2008 Phase IV RIP report have been completed as proposed between 2008 and 2009, included backfilling and capping the soil in the area of the former landfill. As part of the completed remedial activities, impacted soil was backfilled at the site in accordance with the above mentioned Phase IV RIP and site closure objectives (applying an Activity and Use limitation fAULj to Landfill at the time of site closure). The objective of this July 2010 Modification is to remove all the backfilled impacted material (that requires an ALL if left in -place) for off -site transport and disposal, and thereby removing the requirements for an AUL. The excavation and backfilling activities are expected to be completed within two or three weeks; and sampling and profiling, and load -out of soil temporarily stockpiled onsite is expected to take three to five weeks. This project is expected to be completed during July and August 2010, with field work beginning next week. To enhance and sustain the word's built, natural and social environments AECOM If you have any questions, please contact either of the undersigned at (978) 589-3000. Sincerely, David G. Austin, LSP, LEP, PG Senior Project Manager d avi d. au sti no aecom . com Raimundo J. Matos, PG CHMM Project Manager Raimundo.matos(aa)aecom.com cc: Mr. Scott Late, Hearth Agent, Mansfield Board of Health, 6 Park Row, Mansfield, MA 02048. To enhance and sustain the world's built, natural and social environments