Motion to appointed Michael McClanahan as acting Chair for the meeting. (Cerretani-Friedman)
Five (5) in favor, Zero (0) opposed, Zero (0) abstained PASSES
7: 02 p.m. Mr. LeCesne arrived at the meeting.
Mr. McClanahan requested a moment of silence for the passing of Mary D. Flynn who had been a
member of the Planning Board for many years.
There were no Form A plans submitted.
Arek Galle of BETA Group noted the previous April meeting with discussion of the MBTA zoning
overlay. The Town moved forward with the preliminary stages of the program for the initiative to
provide multi -family housing by right in an area around commuter rail stations and MBTA facilities.
Mr. Galle stated that this meeting will be to discuss what has been accomplished and moving forward
with MBTA multifamily zoning initiative overlay considerations. He spoke of developing a map of
the overlay district with limits of where density is best located and fits the community. The MBTA
initially depicted a half mile radius. After discussions and consideration, it was determined that a
better location would be closest to the train tracks and into downtown areas and a hybrid concept map
was then created. The hybrid map meets and exceeds size requirements and walkability requirements.
The map will be refined as discussions continue.
Mr. Galle noted that a radius map does not work due to the roadway/train right of way under and over
passes. He spoke of future development building size and scale and a potential all-weather connection
pedestrian overpass.
Planning Board Meeting Minutes 6/22/22 Page 1 of 4
Mr. LeCesne noted that an all-weather overpass was mentioned and that although it may not meet all
bicycle and ADA requirements, it should not be overlooked if a separate bicycle and ADA access is
also created elsewhere. Mr. Galle suggested a combination of solutions for connectivity.
Mr. Galle noted that in consideration to the density requirements, his team reviewed the existing 20`h
century buildings in Town for a better understanding of their features and characteristics relating to
what works well and what does not. He displayed and discussed pictures of Town buildings for a
comparison and contrast relating to scale, different types of materials, roofline, windows, doorways,
first floor activation, and street level engagement. He also displayed pictures of sidewalks and spoke
challenges with narrow widths, landscape treatments, doorways and facades. He recommended adding
three feet of sidewalk width and relaxing the foundation plantings and perhaps require street trees and
rain gardens in lieu of foundation plantings to get extra sidewalk width. Mr. Galle spoke about
existing building heights with different techniques to adjust scale and height to appear less imposing.
Mr. Galle further shared other town TOD case study buildings (Beverly, Newburyport, Newton) in
comparison to similar buildings in Mansfield and units per acre at each town building shown. Mr.
Galle expressed his observations and takeaways that larger buildings in regard to height and building
footprints are closest to the rail lines and waterways. Brick, stone, and concrete are common building
materials as well as large window and door openings. Often structures have been added onto, or
expanded, or modified over the years, creating "organic" variation in building scale, roof lines,
articulation and appearance. Urbanized public realm with wide, connected and walkable sidewalks
with investment in pocket parks/common areas is a pattern from the past that still resonates in the
design of downtown areas.
Additional observations and takeaways from the study were that older existing buildings generally
have smaller footprints in regard to fagade, proportions, windows, entrances and doorways. The
smaller building footprints often created vertical articulation. Building materials are diverse, ranging
from red brick, to tan stone, to blue shingles. Some of the Town's 18`h, 191h and 20" century building
features are reflected and interpreted in modern TOD building design.
Mr. Galle then noted that next steps and objectives for advancing the Master Plan concept and how to
apply the observations to the TOD district. Objectives would be related to connectivity internal and
external, alternate modes walk/bike, addressing parking and circulation, building position, size, height,
scale and design, streetscape treatments and greenspace/open space. He also suggested to plan to talk
about what kind of buildout could be accommodated at the train station undeveloped areas as that
would have implications to the remaining areas.
Mr. Galle then suggested future discussion topics and schedules for July, August, and September
leading into a more in-depth review of the current Bylaw to establish areas for review, clarification and
improvement to be compliant with MBTA zoning.
Mr. Burke spoke of conversations with land owners regarding what densities they need to make their
business plan function. He noted that parcel density and breakdowns have not been done yet.
Mansfield presents a unique situation where for the past number of years development has been
encouraged in train station area while some land areas are underutilized. Mr. Burke said that the focus
has been on transit -oriented development since about 2014-2015 and if it has not been taken advantage
of, then it is because the business plans do not work in the current allowed densities. There is
opportunity with the underutilized properties including 44 acres of Town owned land, open space, and
Planning Board Meeting Minutes 6/22/22 Page 2 of 4
the Rumford River areas. Mr. LeCesne noted that much of those areas are currently inaccessible. Mr.
Burke said that there is TOD opportunity with the MBTA mandate and the question becomes does the
Town merge some of the MBTA density with TOD and thereby reduce the radius and potential
additional density on the North Main Street corridor. He further discussed undeveloped land and the
conceptual roadway that would go from Route 106 up to County and North Main Streets that would
provide additional vehicle, pedestrian, and bicycle access. He spoke of access up and over the tracks,
which MBTA requirements would typically have two elevators for handicap accessibility and a flight
of stairs and referenced different configuration options with shared point access and expense. He also
referenced a recent student Capstone project where it was recommended single lane pedestrian traffic
in each direction and separate bicycle lane access to navigate under the existing train tracks.
Ms. Friedman asked for calculations of current units within the half mile radius and how many units
are required to meet requirements. She also agreed with Mr. Galle's recommendations for wider
sidewalks and street landscaping and moving forward there should be consideration for real trees, open
spaces and walkability. Mr. Burke mentioned consideration to public realm and public access as Ms.
Ashman -Collins had mentioned at a previous meeting. He also noted that he would like to see wider
sidewalks and street trees, not foundation plantings. Mr. Corsillo mentioned providing ways to capture
people coming off the trains with food options to bring them into the downtown areas. Ms. Friedman
noted that it is complex to balance density with all the dynamics. Mr. Burke spoke of the opportunity
to add character to the undeveloped areas.
Mr. Roche recommended two case studies for review in Washington DC, one at the Rhode Island
Avenue station and the other at Brookland-Catholic University station which would be a similar match
to Mansfield's design.
Mr. Cerretani inquired if the recent developments could be included in the calculations or does it have
to be all new units. Mr. Burke answered that that goal is to create new units, but recently created may
be able to be included if the Town petitions to have them included. It does not need to be contiguous,
but cannot be a series of islands. The visual impact of density can be lessened through architectural
features, varying roof lines, and wider sidewalks. Mr. LeCesne noted that the density and space should
reflect the needs of the people in the space.
Mr. Galle referenced projects that incorporate water quality infiltration systems, rain gardens, within
the street corridor storm water management with tree plantings and a more integrated approach.
Further discussion ensued for creating density and access to foster development. Mr. Burke said that
the Town has to satisfy the Department of Transportation, MBTA, CSX, Amtrack and private
landowners so it will not be an easy or quick process.
Mr. Galle suggested that the next step should entail TOD Bylaw review for use components and
language. Map development would come after that. Ms. Friedman mentioned previously approved
projects that have not been built out that could potentially be included in the calculations.
Mr. Burke noted the next meeting with Mr. Galle could be mid to end July or early August. Mr. Burke
also suggested that the Board review the Bylaw for next meeting discussion.
Ms. Friedman asked about Chris McDermott, Economic Development Manager's roll with the TOD and
inquired if the Board could meet him at a future meeting. Mr. McDermott, who was attending remotely
from his office, then came into the meeting to introduce himself.
Planning Board Meeting Minutes 6/22/22 Page 3 of 4
Minutes — June 8, 2022
Motion to approve minutes as presented and amended. (Friedman-Cerretani)
Four (4) in favor, Zero (0) opposed, Two (2) abstained PASSES
Mr. Burke confirmed that the balloon simulation test is scheduled for Saturday, June 25, 2022.
The applicant's attorney submitted a request to continue the public hearing to July 27, 2022.
Motion to open the public hearing (Cerretani-Roche)
Six (6) in favor, Zero (0) opposed, Zero (0) abstained PASSES
Motion to continue the public hearing to July 27, 2022 at 7:15 p.m. (Cerretani-Roche)
Six (6) in favor, Zero (0) opposed, Zero (0) abstained PASSES
Mr. Roche said that recently on various days the signal lights at Mansfield Crossing intersection have
been blinking and asked if that could be looked into. Mr Burke said he would check with the DPW.
Ms. Friedman, as representative for the Planning Board participating in an advisory capacity for the
Open Space and Recreation Committee, apprised the Board that the committee is working on the 5-
year open space and recreation plan.
Mr. LeCesne asked about the status for the Howe Street speed bump. Mr. Burke said he will check
with Josh Reinke.
Motion: To adjourn at 9:37 p.m. (Friedman-Cerretani)
Six (6) in favor, Zero (0) opposed, Zero (0) abstained PASSES
Date of Next Planning Board Meeting: July 13, 2022 at 7:00 p.m.