Loading...
HomeMy WebLinkAboutCobbler Road subdivision 1993-19955E 540 f�})I LOT 8 LOT LOT LOT LOT LOT 9 7 6 5 4 LOT LOT,` LC 10 \; COBBLER ROAD LOT II LOT 12 292.01' LOT 13 6 12 LOT 20 53,500 S, �8,0002 W 45,5 _ A ANDRF AC?TOTAL` 6.20 0 4.5 AC. WETLAND a 1.7 AC. UPLAND a d R F-0 N8588.01, W Ste_ 8.01' p ?, lsW � 4 NE W ('S �'P J ALL CVO �2 SEE NOTEI � J a U�U W ag EL W ZO y Q U 2 a w o w UZI a K� uw aQ Z ° o o ZZ a7Wa0 Fr p u Eii■! 83.32' MICHAEL J. GALANTI LORRAINE 8A. GALANTI 104. �8-38-2 /168,69, 562-18-18E --�29.35' S75-38-44 �69.39 N78-33-46E — 40.00. N74-24-28E �9 '4-14-06E .94.20' ,58-20E 83.71' NOTE: PLAN OF LAND DATED MAY 20, 1993 A SIGNED BY THE MANSFIELD PLANNING BOARD ON JUNE 2, 1993. N J> O m z (n z m c) CO U) C) O r- x D to cn — cn z n -n n O D x > K O D z O z N D 0 f, n r Cn 0 GI N F— O C) C cn I yam% MAIN ST. Y (10 m TOWN OF MANSFIELD, MASSACHUSETTS 50 West Street, Mansfield, MA 02048 March 14, 1994 Allen L. Willis P.O. Box 748 Mansfield, MA 02048 Re: Cobbler's Corner Subdivision Dear Mr. Willis, I am in receipt of the Definitive Subdivision Plan for Cobbler's Corner, naming yourself as owner and applicant. Enclosed please find the Board of Health Sewer Connection Regulation. Article 2, Proposed Development and New Construction, requires that connection to common sewer be explored prior to granting permits for the construction of septic systems. If I can be of assistance, please do not hesitate to call. Very truly yours, LD BOARD OF HEALTH Scams Leite Health Agent /dr Summary of Laws at issue concerning Cobbler's Corner Subdivision The Subdivision Control Law is the law regulating the process of land subdivision regulating the laying out and construction of ways, providing access to lots and ensuring sanitary conditions. It relates to a community's local zoning requirements to a uniform, statewide process for land division. The Board of Health's Sewer Connection Regulation is a local regulation which promotes the protection of groundwater from the biological and chemical hazards of sanitary sewage, through the use and development of a sewer collection system. The two are clear and separate regulations, not to be merged. Text of law in boldface, comments and interpretation in italics. Massachusetts General Law Chapter 41 section 81U: Subdivision Control: Approval, modification or disapproval of plan by board; prerequisites for decision When a definitive plan of a subdivision is submitted to the planning board, as provided in section 810, a copy thereof shall also be filed with the board of health or board or officer having like powers and duties. Such health board or officer shall, within forty-five days after the plan is so riled, report to the planning board in writing, approval or disapproval of said plan, and, in the event of disapproval, shall make specific findings as to which, if any, areas shown on such plan cannot be used for building sites without injury to the public health, and include such specific findings and the reasons therefor in such report, and where possible, shall make recommendations for the adjustments thereof. (Example of this is the Elms Subdivision and the resulting effects on water quality. Another example would be the use of a landfill for a subdivision.) Failure of such Board or officer to report shall be deemed approval by such board or officer. (An approval through silence, referred to as a constructive grant.) Such health board or officer shall send a copy of such report, if any, to the person who submitted said plan. When the definitive plan shows that no public or community sewer is to be installed to serve any lot thereon, approval by a board of health or officer shall not be treated as, nor deemed to be approval of a permit for the construction and use on any lot of an individual sewage system; and approval of a definitive plan for a subdivision by a board of health or officer shall not be treated as, nor deemed to be, an application for a permit to construct or sue an individual sewage system on any lot contained therein. (Supports the Board in that an approval of the subdivision through silence is not an implicit approval of individual septic systems) Statute moves on to other matters, not relevant to Board of Health regulations. Sewer Connection Regulation attached, Article 2 and 3 relevant. September 15, 1995 Drainage Studies • Percolation Tests • Sewage Disposal Plans • Topographical Surveys AmWetlandFilings • Land Court Surveys • SitePlans • Residential and Industrial Subdivisions 11 April 1994 Mansfield Board of Health c,✓ �� Town Hall - 50 West Street c� { Mansfield, MA 02048 RE: "Cobbler's Corner" Subdivision Board of Health Members: r— Enclosed is a Preliminary Sewer Cost Estimate for the cost of installing sewer for "Cobbler's Corner" Subdivision. The closest existing sewer from the site is the sewer main on Spring Street, about 2270 feet from the site entrance. The second closest sewer is the sewer manhole at Leonard and Willow Streets, about 2500 feet from the site entrance. Both routes would require a force main and since the second route (Leonard St.) would require installing pipe under the 4 culverts for the Rumford River at Willow Street, it is apparent that the route to Spring Street would be the less expensive. The costs are calculated using prices from "Means Building Construction Cost Data" which is the method used by the Mansfield Planning Board for setting bonds. In this case since there is no design approved by the Town and the State , I am using the minimum necessary to sewer the site; a gravity sewer on -site, a pumping station on Lot 2, and a force main in Willow Street. The trench paving on willow Street is assumed as 3-foot wide base coat pavement over the trench and 18-foot wide top coat pavement over the street. The street is presently such a mess of depressions and cracks that it would be impossible to do a reasonable job over the trench area only. The actual cost could escalate due to requirements added during the approval process. /Siincerelly, y �% Ra ph I. Maloon RIM/pp Enclosure 150 North Main Street • Mansfield, Massachusetts 02048 • (508) 339-3731 AntDrainage Studies • Percolation Tests • Sewage Disposal Plans • Topographical Surveys Wetland Filings • Land Court Surveys • Site Plans • Residential and Industrial Subdivisions Cobbler's Corner Subdivision Preliminary Sewer Cost Estimate On -site: Means Unit Item Catalog # Amt. Cost Total Cost 8" PVC Pipe 027-168-2080 630 ft 4.95/L.F. $ 4,108.50 Precast + SMH 027-152-1120 S 720/each 3.600.00 Frames & 027-152-2300 S 3SO/each 1,750.00 Covers 6" PVC - 027-168-2040 S00 ft 4.09/L.F. 2,045.00 Services Trench 022-254-0090 886 c.y. 4.18/c.y. 3,703.48 Excavation Trench Backfill 022-254-3040 886 c.y. 3.34/c.y. 2,959.24 Total On -site..... $18,166.22* Pumping Station & Off -site: Pumping 027-174-0010 1 511500 S 511500.00 Station 6" D.I. 026-686-1420 2.270 ft 15.SO/L.F. 35.185.00 Force Main Trench 022-254-0090 1,SlOc.y. 4.18/c.y. 6,311.80 Excavation Trench 022-254-3040 1,510c.y. 3.34/c.y. 5,043.40 Backfill Base 025-104-0020 760s.y. 3.65/s.y. 2,774.00 Pavement Top 025-104-0340 4.S40s.y. 3.07/s.y. 13,937.80 Pavement Traffic Officer ................................ 5.000.00 Total Offsite ... $119,752.00* Design and Layout .............................. S 10.000.00* *Total ........... $147,918.22 Cob.doc 150 North Main Street • Mansfield, Massachusetts 02048 • (508) 339-3731 022 200 1 Excav, Backfill, Compact CREW OUTPUT DAILY HOURS MAN UNIT 1993 BARE COSTS TOTAL INCL OLP MAT, LABOR EQUIP. TOTAL 54 90 4' to 6' deep,1/2 C.Y. tractor loaderlbackhoe B-IIM 1 200 .080 C.Y. 1.71 1.41 3.12 4.18 0100 5/8 C.Y. hydraulic backhoe B-120 250 .064 1.45 1.49 2.94 3.85 0110 314 C.Y. hydraulic backhoe B-12F 300 .053 1.21 1.51 2,12 3,50 0300 1/2 C.Y. hydraulic excavator, truck mounted B-12J 200 .080 1.81 2.94 4.75 6 0500 6' to 10' deep, 3/4 C.Y. hydraulic backhoe B-12F 225 .071 1.61 2.02 3.63 4.67 0510 1 C.Y. hydraulic backhoe B-12A 400 .040 .90 1.44 2.34 2.96 0600 1 C.Y. hydraulic excavator, truck mounted &l2K 400 .040 .90 2.03 2.93 161 1610 1-1/2 C.Y. hydraulic backhoe B-12B 600 .027 .60 1.21 1.81 2.25 0900 10' to 14' deep, 314 C.Y. hydraulic backhoe &12F 200 .080 1.81 227 4.08 5.25 0910 1 C.Y. hydraulic backhoe B-12A 360 .044 1 1.60 2.60 3.29 1 000 1.1/2 C.Y. hydraulic backhoe B-12B 540 .030 .67 1.34 2.01 2.50 1300 14' to 20' deep, 1 C.Y. hydraulic backhoe B-12A 320 .050 1.13 1.80 2.93 3,70 1310 1.1/2 C.Y. hydraulic backhoe B-128 480 .033 .75 1.51 2.26 2.81 1320 2-1/2 C.Y. hydraulic backhoe B-12S 850 .019 .43 2.04 2,47 2,89 1400 By hand with pick and shovel to 6' deep, light soil I Clab 8 1 18.55 18.55 29 1500 1100 Heavy soil For tamping back611ed trenches, air tamp, add A-1 4 ]00 2 .080 37 1.48 .59 37 2.07 58 2.97 1900 Vibrating plate, add 90 .089 1.65 .65 2.30 3.31 2100 Trim sides and bottom for concrete pours, common earth 600 .013 S.F. .25 .10 .35 .50 2300 - Hardpan 180 .044 .82 .33 1.15 1.65 24DO Pier and spread fooling excavation, add to above C.Y. 30% 30% 3000 Back011 trench, F.E. loader, wheel mtd„ 1 C.Y. bucket 126 1.68 3020 Minimal haul B-IOR 4(q .030 C.Y. .67 .59 3040 100' haul 200 .160 1.18 2.52 3.34 3080 2-1/4 C.Y. bucket, minimum haul &IOT 600 .020 If-7tt44 84 1.28 1.60 3090 100' haul 300 .040 1.61 2.56 3.21 2k 25B 0010 EXCAVATING, UTILITY TRENCH Common earth 0050 Trenching with chain trencher, 12 H.P., operator walking 0100 4' wide trench ,12' deep &53 g00 .010 LF. 23 .10 .33 .46 0150 18' deep 750 .Olt .25 .It .36 .50 0200 24'deep 700 650 .Olt .26 .28 .11 .12 .37 .40 .52 .56 0300 6' wide trench, 12' deep .012 .61 0350 - 18' deep 600 .013 .31 .13 .44 0400 24' deep 550 450 .015 .34 .41 .14 .18 .48 .59 .67 .82 0450 36' deep 475 .018 .39 .17 .56 .77 0600 8' wide trench, deep .017 .93 0650 18' deep 400 ,020 ,46 .20 .66 1.06 0700 24' deep 350 .023 .53 .23 .76 1.23 0750 36' deep 300 2727ff .26 .88 , 1000 Backfill by hand including compaction, add 26 1050 4' wide lrench,l2' deep Ad 8W AIO LT. .07 .31 1100 18' deep 530 „015 .11 .39 .56 1150 24' deep 400 .020 .15 .52 .74 1300 6' wide trench, 12' deep 540 .015 .lt .38 .55 .73 1350 18' deep 405 270 .020 .14 .22 .51 .71 1.10 1400 24' deep 180 .030 .33 1.15 1.65 1450 36' deep 400 .044 .15 .52 .74 1600 W wide trench, 12' deep .020 1.12 1650 18' deep 265 200 A30 .22 .29 .78 1.03 1.48 1700 24' deep 135 .040 .43 1.53 2.20 1750 36' deep ,059 2000 Chain trencher, 40 H.P. operator riding 2050 6' wide trench and backfll, 12' deep Mil 1,200 .001 LF. .l5 .15 .30 .41 2100 18' deep 1'000 .008 .18 .18 .36 .48 2150 24' deep t 975 900 .W8 .19 211.20 .19 .38 .41 .50 .53 2200 36' deep .009 TOTAL INaa4P ?a 100 1 WalkM"ad tilg Paving 2,150 u 3,300 !0 ASPHALTIC CONCRETE PAVEMENT for highways 695 and large payed areas LL 1,075 ` Binder MISS, l-1I2'thkk 8A5 2' thick 1215 3'thick 4'thick Weed ngcourse, l'thk 1701 1-112' thick -2' thick 2'thick 3'thick =is 4'thick eas, add h small areas membrane ,. bags, : truck d 6T 6'thick DAILY MAN. 1993MEODSTS OUTPUT HOURS UNIT MAL L4BOR EQUIP. TOTAL TOTAL INCL OSP 104 7,725 .Olt S.Y. p 23 .21 2.44 6,345 6,345 .014 1.67 28 2.79 ,014 3.67 36 .25 320 3.65 4,140 .021 530 33 4.64 5.25 1111 10,575 .009 1.44 .43 .39 6.12 6.90 y 7.725 .012 2.t9 .19 26 .17 1.80 2.06 a 6,345 ,015 p 95 .24 2.69 3.0731 ` 5,480 .018 3.63 36 .33 4.04 3 4,900 .020 433 . 32 4 32 4.93 .40 .37 5.10 5.80 IW„ 630 .140 Ton 25 2.83 1 31.31 H 690 .128 800 26 2.58 Z32 30.90 36 35.50 .110 900 .098 26 26 223 2 3023 34.50 575 .167 26.50 1.98 3.43 1.78 3.11 29.76 34 630 .152 26.50 3.13 2.90 32.53 32.53 37..50 690 .139 26.50 2.86 Z64 32 31.50 745 .129 B00 26.50 Z65 2.45 3t.6 37 36.50 .120 26.50 2.47 22 58 312 36. Tan 25.50 25.50 28.50 108 27 c50 27. 0 30.50 B•26 3,ODO .029 S.Y. 13,50 61 2,700 o33 18 .6 t4J1 16.45 2,900 ,030 28.50 .68 66 19.34 21.50 2,100 .o42 22.50 .6 21. 24 1,800 .049 27 .87 85 2422 27.50 1,500 .059 34 1.02 1 29.02 32 1.22 120 36.42 40 ce8 135 .119 S.Y. IW% 271 100% q'"'°° �gral coloring, see div. 033.126 2Dab 1,5W .fill .15 2.73 4.08 •20 .35 .48 DE Area to be pared with grader, small area rge area ode la slab on grade, confined B 111 800 2,ODO .020 S.Y. .008 .43 17 •70 1.13 1.43 area, machine M in &32C 1,500 .032 28 .45 .57.69 S, DRIVEWAYS, & PATIOS No base B-18 700 .034 1.08 1.77 2.25 ,hal8c concrete, 2- thick Fb25 aao •66 •06 ,12 1.10 2.1/2'fhick B. 37 720 .0S. Y. 2.95 1.31 ,17 4.43 ' 00pn 1.3D�ysIInplacewthicx6-W1AxWIAmesh, 660 .073 13, 3.63 1.43 .19 525 5.50 6.40 6roonxy finish, no base, 4' Nick 5'thick 8-24 600 .o4o S.F. .92 .81 1,79 5• thick For bank run gravel base, 4' thick, 545 510 .044 .010 1,30 128 .95 1.02 2.05 2.35 2.98 add 8'thick, add 8.18 2,500 .010 12 .18 2.30 2.98 wed 0991e9atc finish, add to above, 1,600 .015 24 29 .02 .32 .44 minimum Maximum 8 24 1,875 .013 06 26 •03 •56 .74 455 053 34 .50 thick. while ma ble .21 1.14 1.35 1.99 2CJab 009 1,100 ..39 .l7 •� .70 0e of these items see Means Heavy Construction Cost Data 1993 Q25 -1 Paving and Surfacing Pavement Martting O2TRumble -W BARE COSTS CREW OUTPUT HOURSMAN. UNIT MAT. LABOR P. i0TA1 INCITOCP !10 02507po�carbonate high, plowable, asphalt pav't A-2A 120 .200 Ea. 1.55 3.75 2.10 7.40 9.85 810 0300ors,re8ectodzed, 2'x4' 2 Clab 150 .101 1.05 1.98 3.03 4.25 0310 150 .107 2.35 1.98 4.33 5.70 00 0610 203-1/2'xl/2' high 2 Clab 50 .320 Ea. 4.35 5.95 10.30 14.10 cc O W F H 3 026 010 I Piped Utilities DAILY MAN- 1993 BARE COSTS TOTAL MAT. LABOR I EQUIP. TOTAL 1750 CREW OUTPUT HOURS UNIT INCLOLP 16 12 0010 BEDDING For pipe and conduit, not Incl. compaction 10 0050 Crashed or screened bank ran gravel B-6 150 .160 C.Y. 11.05 3.21 1.34 15.60 18.60 �5.50 0100 Crashed stone 3/4'to 1/2' 150 .160 12.90 3.21 1.34 17.45 20.50 10 50 0200 " Sand, dead or bank, 150 .160 3.45 3.21 1.34 8 10,25 16 " 05W Compacting bedding in trench A 90 .089 1.65 .65 2.30 3.31 150 40 10 EXCAVATION AND BACNPILL See division 022-204 & 254 53 Hand excavate and trim for pipe bells after Trench excavation 58 8' Pipe I Gab 155 .052 LF. % .96 1,50 71 18' pipe 130 .062 1.14 1.14 1.79 37 050 1 Manholes & Cleanouts 41.50 UTILITY VAULTS Precast concrete, 6' thick 5' x 10' x 6' high, I.D. B-13 2 28 Ea. 1.550 560 254 1 2,364 2.850 .16 6' x 10' x 6' high, I.D. 2 28 1,600 560 254 2.414 2,900 .25 5' x 12' x 6' high, I.D. 2 28 1,700 560 254 2,514 3,025 27 6' x 12' x 6' high, I.D. 1.80 31.111 1,900 620 282 2,802 3,375 ,62 ,. i 6' x 13' x 6' high, I.D. 1.50 37.333 1 2,500 745 340 3,585 4,275 1.12 8' x 14' x 7' high, I.D. 1 56 2,700 1,125 510 4,335 5,275 .18 `,,� �60 Hand hole, precast concrete, 1-1/2' thick 1.22 '` 1'-W x 2'-0' x 1'-9', I.D., light duty �r; . B-1 4 6 Ea. 255 115 370 460 57 4'-6' x 3'-2' x 2'-0', O.D., heavy duty B-6 3 8 540 161 67 768 920 63 NO 650 1 Water Systems 43 59 OOlO CORROSION RESISTANCE Wrap & coat, add to pipe, 4' dia. L.F. 1.20 1.20 1.32 77 6' diameter 1.25 1.25 1.38 120 ' , 8' diameter 1.95 1.95 2.15 12'diameter 2.90 1 2.901 3.19 1.61 24'diameter 5.50 5.50 6A5 4.15 Coating, bituminous, per diameter inch, I coat, add .22 22 .24 .04 3 coat .33 .33 36 3.08 Coal tar epoxy, per diameter inch, I coat, add .15 .15 .17 1.49 A(, V .25 .25 .28 10 PIPING, WATER DISTRIBUTION SYSTEMS Pipe laid in trench, 38 excavation and backRil not included 22.50 Ductile Iron pipe, class 50 water piping, 18' lengths P3,50 Mechanical joint, 4' diameter 820 144 .167 LF. 7.35 3.51 13.60 5.60 6- diameter 126 .190 8.35 4.01 I5.50 J36 29 8' diameter 821 108 259 I1.05 5.60 1.04 22 ost 1 ad Coverage of these hems see Means Heavy Construction Cost Data 1993 2.67 5.05 8.25 25 TOTAL Q27A Sewerage and Drainage 027 100 1 Subdrainage Systems DAILY MAN 1993 BARE COSTS TOTAL MAT. LABOR EQUIP. TOTAL CREW OUTPUT HOURS UNIT INCL OAP 108 4000 Extra strength, 6' diameter B-20 315 .076 L.F. 2 1.61 3.61 4.72 !O8 4020 8' diameter B-21 310 .090 3 1.95 .36 5.31 6.75 4040 ]0 diameter 285 .098 5.90 2.12 .39 8.41 10.25 4060 12' diameter 230 .122 6.40 2.63 .49 9.52 11.70 4080 15' diameter 200 .140 7.20 3.03 .56 10.79 13.25 4100 18' diameter 165 .170 1 10.45 3.67 .68 14.80 1 17.95 110 0010 PIPING, SUBDRAINAGE, CORRUGATED METAL 110 0021 Not including excavation and backfill 2010 Aluminum, perforated 2020 6' diameter, 18 ga. B-20 380 .063 LF. 3.95 1.33 5.28 6.45 2200 8'diameter,l6ga. 370 .065 6.20 1.37 7.57 8.95 2220 10' diameter,16 ga. B-21 360 .078 7.65 1.68 .31 9.64 11.35 2240 12' diameter, 16 ga. 285 .098 8.55 2.12 .39 11.06 13.15 2260 18' diameter, 16 ga. 205 .137 13 2.95 .55 16.50 19.50 3 000 Uncoated galvanized 3D20 6' diameter, 18 ga. B-20 380 .063 LF. 3.75 1.33 5.08 6.20 3200 8'diameter,l6ga. 370 .065 5.25 1.37 6.62 7,95 32M 10' diameter, 16 ga. B-21 360 .078 7.75 1.68 .31 9.74 11.50 3240 12' diameter, 16 ga. 285 .098 8.25 2.12 .39 10.76 12.80 3260 18' diameter, 16 ga. 205 .13 112.50 2.95 .55 16 18.95 4000 Steel, perforated, asphalt coated 4020 6' diameter 18 ga, B20 380 .063 LF. 2.85 1.33 4.18 5.25 4030 8' diameter 18 ga 370 .065 4.30 1.37 5.67 6.90 -- 4040 10' diameter 16 ga B-21 360 ,078 5.30 1.68 1 .31 7.29 8.80 ';- 4050 12'diameter 16Bar 285 .098 6.15 2.12 .39 8.66 10.50 4060 18'diameter 16 205 .137 8.45 2.95 .55 11.95 14.50 u 0010 PIPING, SUBDRAINAGE, VITRIFIED CLAY 112 OD20 Not including excavation and backfill 3000 Perforated, 5' lengths, C700, 4' diameter &20 40 .060 LE 1.55 126 2.81 3.69 3020 6'diameter 315 .076 1.85 1.61 3.46 4.56 80W 8' diameter 290 .083 3.15 1.74 4.89 6.20JOfiO 12' diameter B-21 275 .102 6 2.20 .41 8.61 10.50 400o Channel pipe, 4' diameter &20 430 .056 1.65 1.18 2,83 3.67 6' diameter 335 .072 2.50 1.51 4.01 5.10 ' 40fi0 8' diameter 295 .081 3.70 1.71 5.41 6.75 - 1 iDB) 0010 12' diameter PIPING, SUBDRAINAGE, POLYVINYL CHLORIDE &21 280 .100 7.10 2.16 .40 9.66 11.60 0020 Perforated, price as solid pipe, division 027-168 114 027 150 1 Sewage Systems u 0010 CATCH BASINS OR MANHOLES not including footing, excavation, 0020 Frame and cover 152 0050 Brick, 4' inside diameter, 4' deep D-I 1 16 Ea. 395 345 740 965 0100 0150 6' deep e .70 22.857 555 490 1,045 1,375 50 32 700 685 1,385 1,825 8' dee P Y For depths over 8', add 4 4 V.LF, 88 86 174 230 Concrete blocks (radiap, 4' deep 1.50 10.667 Fa. 257 229 486 640 6' deep w 1 16 335 345 680 900 8' deep 70 22.857 435 49D 925 1,250 ` For depths over 8', add - 5.50 2.909 V.LF. 63 62.50 125.50 166 Concrete, cast in place, 4' x 4', 8' thick 4 deep Bb 2 12 Ea. - 325 241 100 666 840 6' deep 1.50 16 435 320 l34 889 ],125 w � 8' deep 1 24 570 4SO 20l 1,251 1,6W a 1p For depths over 8', add 8 3 V.LF. 75 60 25 160 204 lit Precast, 4' I,D., 4' deep 4.10 5.854 Ea. 258 117 49 424 520 6' deep 3 8 360 161 67 589 720 - .. cc 0 3 W N N3 Y Cost coverage of these hems see Means Heavy Construction Cost Data 1993 65 N Cm G 0 X X 027 1 Sewerage and Drainage 027 150 Sewage Systems CREW DAILY OUTPUT MAN HOURS UNIT 1993 BARE COSTS MAT. LABOR EQUIP.152 1130 8'deep B6 2 l2 Fa. 445� 241 l00 I140 For depths over 8% add 16 1,500 VA.F. 63 30 12.5501150 7B661,075 5' I.D., 4' deep 3 8 Ea. 390 161 6701160 6' deep 2 12 525 241 10051170 8' deep 1.50 16 665 320 1345 1180 For depths over 8', add 12 2 V.I.F. 86 40 16.70 142.70 175 1190 6' I.D., 4' deep 2 12 Ea. 635 241 100 976 1,115 1200 6' deep 1.50 1 16 1 825 320 1 134 1,279 1,550 1210 8' deep 1 24 4 1,025 480 201 1.706 2.100 1220 For depths over 8', add 8 3 V.L.F. 133 60 25 218 267 1250 Slab tops, precast, 8' thick 1300 4' diameter manhole B-6 8 3 1 Ea. 1 93.50 60 25 178.50 224 1400 5' diameter manhole 7.50 3.200 105 64 27 196 245 1500 6' diameter manhole 7 3.429 179 69 28.50 276.50 335 1600 Frames and covers, C.I., 24' square, 500 Ib. 7.80 3.077 172 62 25.50 259.50 315 1700 26' D shape, 600lb. 7 3,429 195 69 28.50 292,50 355 1800 Light traffic, 18' diameter, 1001b. 10 2AOO 71 48 20 139 175 1900 24' diameter, 300 Ib. 8.70 2,759 137 55.50 23 215.50 263 2000 36' diameter, 900 Ib. 5.80 4.138 350 83 34.50 467.50 550 2100 Heavy traffic, 24' diameter, 4001b. 7.80 3,077 172 62 25.50 259.50 315 22DO 36' diameter, 1150lb. 3 8 475 161 67 703 ISO 23DO Mass. State standard, 26' diameter, 4751b. 7 3.429 190 69 28.50 287.50 350 2400 30' diameter, 620lb. 7 3.429 240 69 28.50 337.50 405 2500 Watertight, 24' diameter, 350 lb. 1 7.80 1 3.071 1 1 280 1 62 25.50 367.50 435 2600 26' diameter, 500 No 7 3.429 335 69 28.50 432.50 510 2700 32' diameter, 575 lb. 6 4 355 80.50 33.50 469 550 2800 3 piece cover & frame, 10' deep, 2900 12001bs., for heavy equipment B-6 3 8 Ea. 470 161 67 698 840 3000 Raised for paving 1-1/4' to 2' high, 3100 4 piece expansion ring 32DO 20' to 26' diameter l Clab 3 2.667 Ea. 92 49.50 141.50 179 33DO 30' to 36' diameter 1 1 3 1 2.667 126 1 49.50 1 175.50 217 3320 Frames and covers, existing, raised for paving 2', including 3340 row of brick, concrete collar, up to 12' wide frame B•9 18 2,222 Ea. 28 42 8.05 78.05 106 3360 20' to 26' wide frame 11 3.636 34 69 13,20 116.20 160 3380 30' to 36' wide frame 9 4.444 49 84 16.15 149.15 204 '. 3400 Inverts, single channel brick D-1 3 5.333 52 114 166 234 3500 Concrete 1 5 3200 40 68.50 108.50 150 3600 Triple channel, brick 2 8 75 172 247 350 37DO Concrete 3 5.333 45.50 114 159.50 227 3800 Steps, heavyweight cast iron, 7' x 9' 18ric 40 .200 7 4.81 11.81 15.15 3900 8' x 9' 1 40 .200 10.30 4.81 15.11 18.80 4000 Standard sizes, galvanized steel 40 .200 10.40 4.81 15.21 18.90 4100 Aluminum J 40 .200 11.50 4.81 16.31 20 162 DOJO PIPING, DRAINAGE & SEWAGE, CONCRETE IN 0020 Not including excavation or backRll aao 1000 Non -reinforced pipe, extra strength, B&S or T&G joints 1010 6' diameter B-20 150 .160 L.F. 1 2.95 3.37 6.32 8.55 1020 8' diameter B-21 200 .140 3.25 3.03 .56 6.84 8.95 1030 10' diameter 1 173 .162 3.60 3,50 .65 7.75 10.15 1040 12' diameter 173 .162 4.40 3.50 .65 8.55 it 1050 15' diameter 167 .158 5.10 3.62 .67 9.39 12 1060 18' diameter 167 .168 6.35 3.62 .67 10.64 13.40 1070 21' diameter 153 .193 7.85 3.96 .74 12'55 15.65 1080 24' diameter 153 .183 9.50 3.96 .74 14.20 17.45 2000 Reinforced culvert, class 3, no gaskets 02 352( 394 202 206 66 See the Reference Section for reference number information, Crew Listings and City Cost Indexes For ex and Drainage 027 150 sewage Systems DAILY MAN• 1993 BARE COSTS 164 214020' 18' diameter ]6 ga. CREW OUTPUT HOURS TOTAL INCLol) UNIT MAT. LABOR EQUIP, TOTAL - 2140 24' diameter 14 ga. B-21 190 .147 LF, t1.35 3.19 .59 15.13 18,15 2160 30' diameter 14 ga, 160 175 ]8.15 3.78 .70 22.63 4650 w 2180 36' diameter 12 ga. 0 .233 ]2 22 5.05 .94 27.99 33 2220 48' diameter 12 ga. 100 .280 B-13 100 33 6.05 1.13 40.18 47 A 2220 60' diameter l0 ga. .560 75 747 43 11.20 5.10 59.30 70.50 22 00 72' diameter 8 ga. 45 1.244 65 ]4.95 6.80 86.75 102 11 2500 Plain, 20' lengths 94 25 11.30 130.30 154 2520 eter I6 ga. 2540 meter 16 ga. B-20 355 .068 L.F. 3.50 1.42 492 6.10 2580 meter 16 ga. E 260 .066 220 4.75 1.81 6.56 g05 2580 meter 16 ga. .109 8d1 220 .127 5.25 2.30 6.50 2.75 7.55 9,40 2600 18' diameter 16 ga. 205 . 337 7.75 2.95 .51 9.76 12 2620 24' diameter 14 ga. 115 .160 t3.15 3.46 .55 11.25 13.)5 2640 30' diameter 14 ga. 130 .215 15.70 4.66 .64 1725 2p,50 26I 0 36' diameter ]2 ga. B-13 130 .431 26 8.60 .87 2123 3.91 25.50 48' diameter 12 ga. 110 .509 34 1020 38.51 462 46 60' diameter 10 ga.18 48825850 sections, 18' diameter .718 B-21 16 1.750 53 14.35 Ea, 78 6.50 73.8588End 30' diameter 12 2.333 38 Z05 123.05 153 Corrugated galvinized or alum, oval arch culverts, coated & paved 155 50.50 9.40 214.90 260 17'x 13' 16 ga., 15' equivalent B-22 200 .150 L.F. 10.80 3.28 .84 14.92 17.95 21' x 15' 16 ga., 18' equivalent 3060 28' x 20' 14 ga., 24' equivalent 150 .200 12.75 4.37 1.13 18,25 22 335' z 24' 14 ga., 30' equivalent 125 .240 100 22 5.25 1.35 28.60 33.50 3&50 3100 100 42' x 29' 12 ga., 36' equivalent .300 B-13 100 24 6.55 36 1.69 32,24 31 00 49' x 33' 12 ga., 42' equivalent .560 90 11.20 5.10 52.30 990 71.50 3140 57' x 38' 12 ga., 48' equivalent .622 70 42 12.45 5.65 60.10 31 00 Steel, plain oval arch culverts, plain .800 47 16 7.25 7025 84.50 3180 17' x 13' 16 ga., 15' equivalent B-22 225 .133 LF. 7.10 2.91 10.76 3200 21' x 15' 16 ga., 18' equivalent 175 .171 8.40 3.74 .75 13.20 3220 28' x 20' 14 ga., 24' equivalent 150 200 13.40 .91 13.11 16.15 3240 35' x 24' 14 ga., 30' equivalent 108 4.37 16.75 1.13 18.90 23 3260 42' x 29. 12 ga., 36' equivalent .278 B-13 108 6,05 33 1.56 24.36 29.50 3280 49' x 33' 12 ga., 42' equivalent .519 92 10.35 4.71 48.06 58 3300 57' x 38' 12 ga., 48' equivalent .609 75 39 12.15 5.55 56.70 68 3320 End sections, 17' x 13' .747 22 2.545 36 14.95 Ea, 31 6.80 57.75 70 t39 3340 42' x 29 17 3.294 51 160 66 23 105 30 256 3360 Multi -plate arch, steel B-20 1,690 .014 tb. 310 .55 .30 85 1.08 168 0010 PIPING, DRAINAGE & SEWAGE, POLYVINYL CHLORIDE 0020 Not including excavation or backfili IR N 2000 10' lengths, S.D.R. 35, 4' diameter &20 375 1 A64 LF. 1.35 2040 6' diameter 2080 8' diameter 350 .069 .66 1.65 1.44 2.03 3.09 2.87 4.09 r' 2120 10* diameter 335 .072 B•21 330 2.35 1.51 3.86 4.95 2200 15'diameter .085 320 .087 3.79 1.83 5.35 1.89 .34 5.96 7.40 172 2200 15'diameter lO PIPING, DRAINAGE &SEWAGE, VITRIFIED CLAY C700 190 .147 8.30 3.19 .35 7.59 .59 12.08 9.25 I4.80 r`< 0020 Not including excavation or bacll, 4' & 5' lengths 1RL 4030 Extra strength, compression joints, C425 5DDO 5020 4' diameter x 4' long 8-20 265 .091 LT. 1.25 1.91 3.16 4.38 5040 6' diameter x 5' long 8' diameter x 5' long 200 .120 2 20 4.53 B-21 �� 10' diameter x 5' long 200 140 190 3.95 3.19 .56 185 5080 12' diameter x 6' long .147 150 4.95 3.19 .59. 8.13 IL10 .187 6.50 4.04 .75 11.29 14.30 68 See the Reference Section for reference number Information, Crew Listings and C y Cost Indexes For expan 027 1 Sewerage and Drainage 627 150 1 Sewage Systems DAILY MAN• 1993 BA TOTAL MAT. MAT. LABOR EQUIP. EQUIP. TOTAL U) CREW OUTPUT NOUR9 UNIT INCL OLP 8.15 172 S10p 15' diameter x 7' long B 21 110 .255 LF. 12.15 5.50 1.02 1927 24 172 !6.50 5120 18' diameter x 7' long 88 .318 19 6.90 1.28 27.18 33 13 5140 24' diameter x 1' long 45 b22 36 13.45 2.50 51.95 63.50 17 8160 30' diameter x 7' long B-22 31 .968 40 21 5.45 66.45 83 70.50 5180 36' diameter x 7' long 20 IS00 61 33 8.45 102.45 127 D2 6000 3' lengths, add to above 30% 54 60P0 2' lengths, add to above 40% 6040 For die cast slip joints compared to premium joints 90% 6.10 6060 For plain joints compared to compression joints 75% 75% 8.05 1060 2' lengths, add to above 9•4 - A 0010 SEWAGE PUMPING STATIONS Prefabricated steel, concrete 174 12 0020 or fiberglass, 200 GPM Gl7D .17 494 Total 26,500 12,100 2,975 41,575 51,500 1315 02pp 11000 GPM .O7 1,200 39,300 29,400 7,200 75,900 97,500 20.50 050p Add for generator unit, 200 GPM, steel .34 247 20,300 6,050 1,475 27,825 33,500 25.50 06pp Concrete .51 164 12,800 4,050 990 77,840 21,500 46 ISW Add for generator unit, 1,000 GPM, steel .31 280 21.500 6,875 1,675 30,050 1 36,400 58.50 n 1200 Concrete .38 221 18,100 5,425 1,325 24,850 29,900 88 15M For drilled water well, if required, add Z3 .50 80 5.200 1,525 1,150 7,875 9,350 153 QO10 SEWAGE TREATMENT No! Incl. fencing or external piping t76 260 wr Sop Steel packaged, blown air aeration plants QO 1,000 GPD Gal, 14.10 17. 5,000 GPD 22 ` 15,000 GPD 9.30 33 30,000 GPD 5.10 4.95 50,000 GPD 100,000 GPD 3.65 11 200,000 GPD 3.35 84 500,000GPD 2.35 35 X� Concrete, extended aeration, primary and secondary treatment 2.60 13 10,000 GPD Gal. 10.75 16 30,000 GPD 23 50,000 GPD 5.05 29 100,000 GPD .2 5 5.5 58 L'' 500,000 GPD 68. Municipal wastewater treatment facility 2.40 70 1.0 MGD Gal. 4.10 139 1.5 MGD 310 2.0 MGD 4.05 1 3.0 MGD][1 3.45 5.0 MGD 2.70 Holding lank system, not Incl. excavation or back811 2.45 Recirculating chemical water closet 2 Plum 4 4 Ea. 645 I10 755 875 For voltage converter, add 16 1 160 27.50 187.50 218 4 For high level alarm, add 1 Plum 7.80 1.026 78 28 106 129 4 7 350 1 Wastewater System �WASTEWATEATREAIMENT 9 SYSTEM Fiberglass,1,000gallon B-21 1.29 21.705 Ea. 2,600 470 87.50 3,157.50 3,615 354 M 1,500 gallon L03 27.184 5,700 590 109 6,399 7,325 400 I Septic Systems �fEPTIC TANKS Not Incl, excay. or piping, precast, 1,000 gallon B-21 8 3.50' Ea. 431 71.50 14.05 519.55 610 404 2,000gallon 51000 gallon 5 5.600 810 121 22.50 953.50 1,100 15,000gallon 70 16.411 3,575 355 66 3,996 4,550 II 25,000 gallon B-13 1.30 43.077 9,875 860 390 11,125 12.700 i 40,000 gallon .80 70 14,600 1,400 635 16.635 19,000 .60 93.333 22,500 1,875 845 25,220 28,600 KI y coo coverage of these Items see Means Heavy Construction Cost Data 1993 W TOWN OF MANSFIELD, MASSACHUSETTS 50 West Street, Mansfield, MA 02048 MEMO TO: Board of Health Scott Leite, Health Agent FROM: Engineering Department DATE` 6/l/94 SUBJECT: Review of Sewer for Cobbler's Corner Subdivision Your memo requests that we analyze the developer's sewer layout with respect to the Town's sewer masterplan. During the permitting process for the Lifecare Facility the sewer masterplan was revised for this area. The present design matches the sewer- design for the Lifecare Facility and thus agrees with the masterplan. Your memo also requests us to identify any cost saving measures which the developer could employ to make the sewer installation more economically feasible. The only cost savings measure that I can identify is to allow the developer to install the force main to Spring Street along the side of the road and then not require full width paving of Willow Street. The full width paving previously offered with the Lifecare Facility also included a gravity sewer in Willow Street to flow from Spring Street back to the pump station., Since this gravity sewer will not be installed now there is no need for the full width paving. Possibly another developer may wish to install the gravity sewer at a later time or residents with failing septic systems could install it.. File; B21 COBLRCNR Drainage Studies • Percolation Tests Sewage Disposal Plans • Topographical Surveys Wetland Filings • Land Court Surveys • Site Plans • Residential and Industrial Subdivisions ENGINEERING CO., INC. September 14, 1995 Mansfield Board of Health Town Hall 50 West Street Mansfield, MA 02048 Re: "Cobblers Corner" Subdivision Board of Health Members; I have been requested to review my cost estimate for sewering "Cobblers Corner" Subdivision and to calculate the cost using grinder pumps rather than one pumping station. Enclosed is my April 11, 1994 report and cost estimate. The only change is the addition of 2 town inspection fees. Enclosed also is a cost estimate for using 2 grinder pumps for each house rather than a single pumping station. Please note that these are only preliminary cost estimates. Many factors not included could cause a rise in cost such as ledge, high ground water, avoidance of existing utilities, etc. Sincerely, Ral hh 1. Maloon RIM/dl Encl. 150 North Main Street • Mansfield, Massachusetts 02048 • (508) 339.3731 Drainage Studies • Percolation Tests Sewage Disposal Plans • Topographical Surveys Wetland Filings • Land Court Surveys Site Plans • Residential and Industrial Subdivisions ENGINEEflING CO., INC. 11 April 1994 Mansfield Board of Health Town Hall - 50 West Street Mansfield, MA 02048 RE: "Cobbler's Corner" Subdivision Board of Health Members: Enclosed is a Preliminary Sewer Cost Estimate for the cost of installing sewer for "Cobbler's Corner" Subdivision. The closest existing sewer from the site is the sewer main on Spring Street, about 2270 feet from the site entrance. The second closest sewer is the sewer manhole at Leonard and Willow Streets, about 2500 feet from the site entrance. Both routes would require a force main and since the second route (Leonard St.) would require installing pipe under the 4 culverts for the Rumford River at Willow Street, it is apparent that the route to Spring Street would be the less expensive. The costs are calculated using prices from "Means Building Construction Cost Data,, which is the method used by the Mansfield Planning Board for setting bonds. In this case since there is no design approved by the Town and the State , I am using the minimum necessary to sewer the site; a gravity sewer on -site, a pumping station on Lot 2, and a force main in Willow Street. The trench paving on willow Street is assumed as 3-foot wide base coat pavement over the trench and 18-foot wide top coat pavement over the street. The street is presently such a mess of depressions and cracks that it would be impossible to do a reasonable job over the trench area only. The actual cost could escalate due to requirements added during the approval process. Sincerely, Ralph I. Maloon RIM/pp Enclosure 150 North Main Street • Mansfield. Massachusetts 02048 • (508) 339-3731 Drainage Studies • Percolation Tests • Sewage Disposal Plans • Topographical Survey Wetland Filings • Land Court Surveys • Site Plans • Residential and Industrial Subdivisions ENOINEEAINfi CO, INC. Cobbler's Corner Subdivision Preliminary Sewer Cost Estimate On -site: Means Item Catalog # Amt. 8" PVC Pipe 027-168-2080 830 ft Precast + SMH 027-152-1120 5 Frames & 027-152-2300 5 Covers 6" PVC - 027-168-2040 500 ft Services Unit Cost Total Cost 4.95/L.F. S 4,108.50 720/each 3,600.00 350/each 1,750.00 4.09/L.F. 2,045.00 Trench 022-254-0090 886 c.y. 4.18/c.y. 3,703.48 Excavation Trench Backfill 022-254-3040 886 c.y. 3.34/c.y. 2,959.24 Total On -site..... $18,166.22* Pumping. Station & Off -site: Pumping 027-174-0010 1 51.500 $ 51,500.00 Station 6" D.I. 026-686-1420 2.270 ft 15.50/L.F. 35,185.00 Force Main Trench 022-254-0090 1,510c.y. 4.18/c.y. 6,311.80 Excavation Trench 022-254-3040 1,510c.y. 3.34/c.y. 5,043.40 Backfill Base 025-104-0020 760s.y. 3.65/s.y. 2,774.00 Pavement Top 025-104-0340 4.540s.y. 3.0'/s.y. 13,937.80 Pavement Traffic Officer ................................ 5.000.00 Total Offsite ... $119,752.00* low,v fK(SYFcT,a�l 14-10,c,,*` Design and Layout .............................. 8 10.000.00* *Total ........... $44=,91&:22 4. i Lq9, 35"5. 2 Z Cob.doc ENGINEERING CO., INC. On -site: Drainage Studies • Percolation Tests • Sewage Disposal Plans • Topographical Surveys Wetland Filings • Land court Surveys • Site Plans • Residential and Industrial Subdivisions Cobblers Corner Preliminary Sewer Cost Using Grinder Pump -Force Main Means Unit Total Item Catalog # Amt. Cost cost Grinder Pump F. Mahoney Dist. 19 4,850 $ 92,150.00 12" Force Main F. Mahoney Dist. 950' 5.50/ft. 5,225.00 2z' Force Main F. Mahoney Dist. 830' 6.50/ft. 5,395.00 Trench Excavation 022-254-0090 886 c.y. 4.18/c.y. 3,703.48 Trench Backfill 022-254-0340 886 c.y. 3.34/c.y. 2,959.24 Town Inspection 1780' $40/100ft. 720.00 Total On -site ........... $110,152.72 Off -site: 2'z" Force Main F. Mahoney 2270 ft. 6.50/ft. 14,755.00 Trench Excavation 022-254-0090 1510 c.y. 4.18/c.y. 6,311.80 Trench Backfill 022-254-3040 1510 c.y. 3.34/c.y. 5,043.40 Base Pavement 025-104-0020 760 s.y. 3.65/s.y. 2,774.00 Top Pavement 025-104-0340 4540 s.y. 3.07/s.y. 13,937.80 Town Inspection 2270 ft. $40/100 ft. 920.00 Traffic Officer 5,000.00 Total off -site .......... $ 48,742.00 10,000.00 Design Layout Total $168,894.72 150 North Main Street • Mansfield, Massachusetts 02048 • (508) 339.3731 Chronology of Cobblers Corner Sewer Connection Request September 14, 1994, Complied by Health Agent • March 8, 1994 (Tuesday) 3:35 PM Definitive plan of Cobbler's Corner Subdivision filed with Town Clerk's Office. • March 14, 1994 (Monday) Letter from Health Agent to Allen Willis regarding Cobbler's Corner Subdivision and the Board of Health Sewer Connection Regulation. • April 14, 1994 Letter from RIM Engineering including Preliminary Sewer Cost Estimate for Cobbler's Corner Subdivision. • April 21, 1994 Board of Health meeting Agent brings forward RIM letter of April 14. • May 12, 1994 At request of Board of Health, Agent forwards RIM April 14 letter to Town Engineer for comment. • June 1, 1994 Memo from Town Engineer regarding RIM April 14 letter, • June 2, 1994 Discussion of RIM April 14 letter deferred to meeting with full Board. • July 7, 1994 Board of Health meeting, Agent reports to Board that a discussion with RIM Engineering took place regarding possibility of alternatives to RIM April 14 letter, and should be considered. • August 18, 1994 Board of Health meeting, No word regarding sewering of Cobbler's Corner Subdivision. • September 15, 1994 Board of Health meeting, No word regarding sewering of Cobbler's Corner Subdivision. • October 6, 1994 Board of Health meeting, No word regarding sewering of Cobbler's Comer Subdivision. • October 20, 1994 Board of Health meeting, No word regarding sewering of Cobbler's Corner Subdivision. • November 3, 1994 Board of Health meeting, No word regarding sewering of Cobbler's Corner Subdivision. • November 17, 1994 Board of Health meeting, No word regarding sewering of Cobbler's Corner Subdivision. • December 8, 1994 Board of Health meeting, No word regarding sewering of Cobbler's Corner Subdivision. • January 5, 1995 Board of Health meeting, No word regarding sewering of Cobbler's Corner Subdivision. • January 19, 1995 Board of Health meeting, No word regarding sewering of Cobbler's Corner Subdivision. • February 2, 1995 Board of Health meeting, No word regarding sewering of Cobbler's Corner Subdivision. Deleted from agenda. • On or about August 31, 1995 Stanley Feck requests site evaluation of 2 lots in Cobbler's Corner Subdivision on Willow Street. Agent reiterates process regarding subdivision, but will revisit with Board of Health. ® September 7, 1995 Allen Willis, owner of Cobbler's Corner Subdivision, discusses standing of subdivision with regard to Board of Health regulation with Agent. Agent will revisit with Board at this evenings meeting. s September 7, 1995 Board of Health meeting discussed Cobbler's Corner subdivision regarding Sewer Connection Regulation. No change in pursuit of the Board's desire to sewer subdivision, if possible. ® September 8, 1995 Return check and site evaluation applications to Stanley Feck. Allen Willis calls to discuss previous evening meeting and standing of subdivision. ® September 12, 1995 Agent meets with Allen Willis and his attorney Garren Bresnick. Planning Director Shaun Burke also attending. Summary of meeting: 1. Willis believed harmed by Board because was not rendered a "timely decision". 2. Agent's concession to portion of "timely decision" was that spoke with RIM in June 1994 regarding alternatives, rather than send letter. 3. Discussed variance procedure for Sewer Connection Regulation and options regarding variance requests/possible outcome. 4. Willis claimed discussion "few hours ago" with RIM revealed April 14 letter did not include on -site sewer work. Willis told to substantiate claim and submit to Board for review. 5. Discussion included frequent blending of Subdivision Control Law and Board of Health Sewer Connection Regulation which are unrelated in process. 6. Willis and Attorney wish to attend September 21 meeting to discuss variance. 7. Attorney will contact agent on September 13. September 13, 1995 No contact from Attorney or Willis. RIM Engineering calls, new report will be delivered on September 14. 39 LARCRIDGE LANE ASHLAND, MA. 01721 Board of Health Town of Mansfield C/O Scott Leite Town Hall - 50 West Street Mansfield, MA 02048 GAREN M. BRESNICK ATTORNEY AT LAW TELEPHONE: (508) 881. 6776 TELECOPIER (508) 881- 7210 September 14, 1995 RE: Sewer / Septic Systems - Cobblers Corner Subdivision - Dear Board of Health Members: On behalf of my client, Allen L. Willis, of Gloria Drive, Mansfield, owner of the residential subdivision known as Cobbler's Corner, off Willow Street, Mansfield, I hereby request a waiver of the Board's Sewer Connection Regulations, based on the following facts and documentation. On or about April 11, 1994, during the time period when this subdivision was before the Planning Board for review and definitive plan approval, the project engineer, Ralph Maloon, of RIM Engineering sent a letter to the Board which provided the Board with preliminary cost estimates for sewering the proposed 19 lot subdivision. Said document which indicated a cost for sewer in the range of $119,000.00 and a per lot cost of $6,200.00 However, from that date, through the remainder of the subdivision approval process, neither my client or the Planning Board received any formal response to the issue as to whether sewer would be required in the said subdivision. On that basis, the Planning Board approved the definitive plan without sewer, believing as did my client, that the Board of Health, by its lack of response determined that sewer was not reasonable for the project. As late as last week, when a prospective purchaser of the front 4 lots came to the Health Agent for percolation tests, he and the my client was informed that the issue of sewer for this project had not yet been resolved, and hence the tests were denied. We now learn that the issue of Cobblers Corner was carried on the Agenda of the Board of Health for several meetings, each time with no written notice to my client, and only a verbal mention by the Health Agent to our engineer, which, to our understanding and belief cam after subdivision approval and as a suggestion that Mr. Willis look at a "force main" with individual grinder pumps, as an alternative means of sewering along the abutting street to the subdivision. With all due respect to the Board and Health Agent, not having received any formal or written notice concerning this situation, Mr. Willis now finds himself at the eleventh hour, with the sale of 4 lots now possibly lost, requesting a waiver / variance from the Board's Regulations. Cobbler's Corner Page 2. Based on the recalculations of RIM Engineering, which are attached hereto, there are two ways in which this site might be sewered. First is by a gravity main with a pumping station, and the other is by use of a smaller force main which employs individual grinder pumps. Based on the cost estimates attached the gravity alternative will cost approximately $150,000 for the project with a distributed cost of approximately $8,000 per unit. The pump station would lift the sewage from the site to a force main in Willow Street and the line as long Willow to Spring Street would not be available to any abutters on Willow Street. The $8,000. represents about a 1000/a increase above the anticipated $4,000.00 cost for an on -site system. The force main alternative would require each owner to install a grinder pump and chamber. The cost for that alternative would be $169,000 with a distributed cost of $8,900. per unit, which is approximately 125% increase over the $4,000. anticipated cost for an on -site system. While this would make the line in Willow Street available to other property owners, the cost for such connections with grinder pump and chamber installations would cost each parry approximately $5,000. which we believe is beyond the point of affordability for most home owners. Based on these facts, Mr. Willis hereby requests a waiver / variance be granted to allow use of on site sewage disposal systems for the 19 lots which comprise the Cobbler's Corner Subdivision. We further petition that the Board make a decision at its next meeting in view of the advanced nature of the project and the fact that the subdivision plan has now been approved for about 1 year without comment or further notice from the Board as to this situation. In the event that the Board is unable to fully act on this request at its meeting of 9/21/95, we further request that the Board, tonight, grant a waiver / variance as to the 4 lots fronting on Willow Street, being lots no. 1, 2, 18, and 19, allowing them to move forward to percolation test, design and construction of on site systems. Very truly yours, c _" :LR Garen M. Bresnick, Esq. for Allen L. Willis, Applicant TOWN OF MANSFIELD, MASSACHUSETTS 50 West Street, Mansfield, MA 02048 )5 Allen L. Willis, Jr. A. L. Willis Co., Inc. P.O. Box 748 Mansfield, MA 02048 Re: Septic Systems, Cobbler's Corner Subdivision Dear Mr, Willis: Please be advised that the Board of Health considered your request of October 5, 1995, per your attorney's letter. The motion and vote was as follows: "To deny the request that the fees for Cobbler's Corner be charged in accordance with the former Regulation of Fees. The Regulation of Fees is a totally different regulation, separate from Title 5. Fee structure can be amended at anytime." Marti n/Fontani ni. 4-0, All in favor. VOTED As we discussed this morning, a balance of S 1950.00 remains for site evaluations of 19 lots in the Cobbler's Corner Subdivision. The total fee for site evaluations on those lots is S 2850.00. On September 25, 1995, you submitted a check for $ 900 for site evaluations, thus arriving at the balance of $ 1950.00 to complete this phase of the project. The remaining lots are scheduled for site evaluation on October 24, prior to that date, the balance of S 1950.00 must be submitted. If 1 can be of further assistance, please do not hesitate to contact this office. Very truly yours, MANSFIELD BOARD OF HEALTH Scott Leite, Health Agent /dr TOWN OF MANSFIELD, MASSACHUSETTS 50 West Street, Mansfield, MA 02048 MEMORANDUM To: Bob Swanson, Town Engine — From: Scott Leite, Health Age Re: Cobbler's Corner Subdivision, Sewer Possiblity Date: May 12, 1994 The Board of Health requests that you review and comment on the attached plan for the proposed Cobbler's Corner Subdivision, off Willow Street, with respect to the following: 1. Application to the Sewer Master Plan. 2. Possible lower cost alternatives for sewering. The applicant, Mr. Willis, is anxious for a response from the BOH as this project relates to their Sewer Connection Regulation. Your response will be greatly appreciated. Thank you. 09/18/1995 10:51 5082617343 TOWNOFMANSFIELD PAGE 03 I NYC l{Gi2,. TOWN OF MANSFIELD, MASSACHUSETTS 50 West Street, Mansfield, MA 02048 TOWN OF MANSFIELD 14ANSFIELD BOARD OF HEALTH REQUEST FOR A VARIANCE APPLICANT:— _ALLEN L. WILLIS, JR._ _ _ ADDRESS:,.._P_,0_ BOX 748, MANSFIELD, MA. 02048 TELEPHONE HOME: 339 _8804 _ BUSINESS: ....SAME.. OWNER: ........ ALLEN L.,._WILLI.S..:....JR...__ ADDRESS: SAME AS ABOVE TELEPHONE HOME: SAME BUSINESS: .SAME SPECIFIC VARIANCE SOUGHT:SEWER CONNECTION REGULATION, ARTICLE 2. TO WAIVE THE REQUIREMENT THAT THE RESIDENTIAL SUBDIVISION "COBBLER"S CORNER" BE SEWERED. REASONS FOR REQUEST -T13AT THE..D.ISTANC.E ..T.O.,-ELEVA.TION:.OF AND COST MAKE SUCH CONNECTION UNFEASIBLE. THAT THE SOILS ON THE .-...... ....................--......-,,,..._....I....-........--............._......... _..,........ ._...._..... ... SITE WILL PROVIDE THE SAME DEGREE OF ENVIRONMENTAL PROTECTION. T'l-A-T—THE PL'A'k WA-S"'APPROVED—OYE'R"A-"YEAR AGO WITHOUT COMMENT FROM THE BOARD OF HIE OWNER'S SIGNATURE: 4 � DATE, ._,.SEPTEMBER 19, 1995 Ga`�`;"n Bresnick, Attorney for Owner CC APPLICANT'S SIGNATURE;.,,,. a GATE: SEPTEMBER 19, 1995 Garen Bresnic , Attor'ney for Applicant PLEASE PROVIDE: 1. Locus map 2. Plot, building or septic plan 3. Mechanical data 4. Any other informative documents, photographs, plans, etc. VOTE Chai 7/8/93 LOCUS 3 o J J 3 r' yLa r SITE i "gSJr ryIDt� � rs s ' + r �'s'" MAP 1''=1000' s `6sst40A$l,lNFORMATION: MAP 12 , PCLS, p/o 32,+3: �ONINC3 CLASSIFICATION: R 2 TOWN OF MANSFIELD) MASSACHUSETTS 50 West Street, Mansfield, MA 02048 FAX COVER SHEET Date From: Town of Mansfield 50 West Street Mansfield, MA 02048 Name: Board of Health /3 Time Phone: (508) 261- 7366 Fax: (508) 261- 7343 Type of Formr�0jp) No. of Pages w (including cover sheet) If you do not receive all of the above copies, please contact' sender. Message: 39 LARCRIDGE LANE ASHLAND, MA. 01721 Board of Health Town of Mansfield C/O Scott Leite Town Hall - 50 West Street Mansfield, MA 02048 GAREN M. BRESNICK ATTORNEY AT LAW TELEPHONE: (508) 881- 6776 TELECOPIER (508) 881- 7210 September 14, 1995 RE: Sewer / Septic Systems - Cobblers Corner Subdivision - Dear Board of Health Members: On behalf of my client, Allen L. Willis, of Gloria Drive, Mansfield, owner of the residential subdivision known as Cobbler's Corner, off Willow Street, Mansfield, I hereby request a waiver of the Board's Sewer Connection Regulations, based on the following facts and documentation. On or about April 11, 1994, during the time period when this subdivision was before the Planning Board for review and definitive plan approval, the project engineer, Ralph Maloon, of RIM Engineering sent a letter to the Board which provided the Board with preliminary cost estimates for sewering the proposed 19 lot subdivision. Said document which indicated a cost for sewer in the range of $119,000.00 and a per lot cost of $6,200.00 However, from that date, through the remainder of the subdivision approval process, neither my client or the Planning Board received any formal response to the issue as to whether sewer would be required in the said subdivision. On that basis, the Planning Board approved the definitive plan without sewer, believing as did my client, that the Board of Health, by its lack of response determined that sewer was not reasonable for the project. As late as last week, when a prospective purchaser of the front 4 lots came to the Health Agent for percolation tests, he and the my client was informed that the issue of sewer for this project had not yet been resolved, and hence the tests were denied. We now team that the issue of Cobblers Corner was carried on the Agenda of the Board of Health for several meetings, each time with no written notice to my client, and only a verbal mention by the Health Agent to our engineer, which, to our understanding and belief cam after subdivision approval and as a suggestion that Mr. Willis look at a "force main" with individual grinder pumps, as an alternative means of sewering along the abutting street to the subdivision. With all due respect to the Board and Health Agent, not having received any formal or written notice concerning this situation, Mr. Willis now finds himself at the eleventh hour, with the sale of 4 lots now possibly lost, requesting a waiver / variance from the Board's Regulations. Cobbler's Corner Page 2. Based on the recalculations of RIM Engineering, which are attached hereto, there are two ways in which this site might be sewered. First is by a gravity main with a pumping station, and the other is by use of a smaller force main which employs individual grinder pumps. Based on the cost estimates attached the gravity alternative will cost approximately $150,000 for the project with a distributed cost of approximately $8,000 per unit. The pump station would lift the sewage from the site to a force main in Willow Street and the line as long Willow to Spring Street would not be available to any abutters on Willow Street. The $8,000. represents about a 100% increase above the anticipated $4,000.00 cost for an on -site system. The force main alternative would require each owner to install a grinder pump and chamber. The cost for that alternative would be $169,000 with a distributed cost of $8,900. per unit, which is approximately 125% increase over the $4,000. anticipated cost for an on -site system. While this would make the line in Willow Street available to other property owners, the cost for such connections with grinder pump and chamber installations would cost each parry approximately $5,000. which we believe is beyond the point of affordability for most home owners. Based on these facts, Mr. Willis hereby requests a waiver / variance be granted to allow use of on site sewage disposal systems for the 19 lots which comprise the Cobbler's Corner Subdivision. We further petition that the Board make a decision at its next meeting in view of the advanced nature of the project and the fact that the subdivision plan has now been approved for about 1 year without comment or further notice from the Board as to this situation. In the event that the Board is unable to fully act on this request at its meeting of 9/21/95, we further request that the Board, tonight, grant a waiver / variance as to the 4 lots fronting on Willow Street, being lots no. 1, 2, 18, and 19, allowing them to move forward to percolation test, design and construction of on site systems. Very truly yours, Garen M. Bresnick, Esq. for Allen L. Willis, Applicant 39 LARCRIDGE LANE ASHLAND, MA. 01721 CORRECTED COPY 9/21/95 Board of Health Town of Mansfield C/O Scott Leite Town Hall - 50 West Street Mansfield, MA 02048 GAREN M. BRESNICK ATTORNEY AT LAW TELEPHONE: (508) 881. 6776 TELECOPIER (508) 881- 7210 September 14, 1995 RE: Sewer / Septic Systems - Cobblers Corner Subdivision - Dear Board of Health Members: On behalf of my client, Allen L. Willis, of Gloria Drive, Mansfield, owner of the residential subdivision known as Cobbler's Corner, off Willow Street, Mansfield, I hereby request a waiver of the Board's Sewer Connection Regulations, based on the following facts and documentation. On or about April 11, 1994, during the time period when this subdivision was before the Planning Board for review and definitive plan approval, the project engineer, Ralph Maloon, of RIM Engineering sent a letter to the Board which provided the Board with preliminary cost estimates for sewering the proposed 19 lot subdivision. Said document which indicated a cost for sewer in the range of $148,000.00 ($18,200.00 on site and $119,000.00 off site) and a per lot cost of $7,800.00 However, from that date, through the remainder of the subdivision approval process, neither my client or the Planning Board received any formal response to the issue as to whether sewer would be required in the said subdivision. On that basis, the Planning Board approved the definitive plan without sewer, believing as did my client, that the Board of Health, by its lack of response determined that sewer was not reasonable for the project. As late as last week, when a prospective purchaser of the front 4 lots came to the Health Agent for percolation tests, he and then my client were informed that the issue of sewer for this project had not yet been resolved, and hence the tests were denied. We now learn that the issue of Cobblers Corner was carried on the Agenda of the Board of Health for several meetings, each time with no written notice to my client, and only a verbal mention by the Health Agent to our engineer, which, to our understanding and belief canfafter subdivision approval and as a suggestion that Mr. Willis look at a "force main" with individual grinder pumps, as an alternative means of sewering along the abutting street to the subdivision. With all due respect to the Board and Health Agent, not having received any formal or written notice concerning this situation, Mr. Willis now finds himself at the eleventh hour, with the sale of 4 lots now possibly lost, requesting a waiver / variance from the Board's Regulations. Cobbler's Corner Page 2. Based on the recalculations of RIM Engineering, which are attached hereto, there are two ways in which this site might be sewered. First is by a gravity main with a pumping station, and the other is by use of a smaller force main which employs individual grinder pumps. Based on the cost estimates attached the gravity alternative will cost approximately $150,000 for the project with a distributed cost of approximately $8,000 per unit. The pump station would lift the sewage from the site to a force main in Willow Street and the line a� long Willow to Spring Street would not be available to any abutters on Willow Street. The $8,000. represents about a 100% increase above the anticipated $4,000.00 cost for an on -site system. The force main alternative would require each owner to install a grinder pump and chamber. The cost for that alternative would be $169,000 with a distributed cost of $8,900. per unit, which is approximately a 125% increase over the $4,000. anticipated cost for an on -site system. While this would make the line in Willow Street available to other property owners, the cost for such connections with grinder pump and chamber installations would cost each party approximately $5,000. which we believe is beyond the point of affordability for most home owners. Based on these facts, Mr. Willis hereby requests a waiver / variance be granted to allow use of on site sewage disposal systems for the 19 lots which comprise the Cobbler's Corner Subdivision. We firrther petition that the Board make a decision at its next meeting in view of the advanced nature of the project and the fact that the subdivision plan has now been approved for about 1 year without comment or further notice from the Board as to this situation. In the event that the Board is unable to fully act on this request at its meeting of 9/21/95, we further request that the Board, tonight, grant a waiver / variance as to the 4 lots fronting on Willow Street, being lots no. 1, 2, 18, and 19, allowing them to move forward to percolation test, design and construction of on site systems. Very truly yours, x Garen M. Bresnick, Esq. for Allen L. Willis, Applicant 05/ 18 / 1995 10: 51 GHREN+BRESNICK 508+0£31+7210 P.01 6062617343 TOWNOFMANSFIELD PAGE 03 TOWN OF MANSFIELD, MASSACHUSET`T'S 50 west Street, Manslleld, MA 02048 TOWN OF MANSFIELD MANSFIELD WARD OF HEALTH REQUEST FOR A VARIANCE APPLICANT:_JALLEN L. ADDRESS...._P;O. BOX .748 , MANSFIELD, MA. 02048._„_ 04 SU5INES6:._5AME„ TELEPHONE HONE:„,339,�88,,,, _,,,,.,„.,..__. OWNER:_..ALLEN„L....... _WILLTS..:...JR ...,_.. .... ADDRESS:.._ ...,SAME AS ABOVE ...... ... .... ..... TELf.P180Nt: HOME: „SAME __ .....__DtiSINESS= _,SAME , SPECIFIC VARIANCE SOUGHT,,,_ SEWER CONNECTION REGULATION ARTICLE 2. TO WAIVkHE RESIDENTIAL SUBDIVISION _..A.HE..._REQUIRI REQUIREMENT THAT _?^ ,.......,,„..., ,.__.......... A . "COBBLER"S CORNER" BE SEWERED. REASONS FOR REQUEST: _._T,ti,A.T..T.HE....DI.S.TANC.F....T.Q,.ELEVATION..OF AND COST MAKE SUCH CONNECTION UNFEASIBLE. THAT THE SOILS ON THE. SITE WILL PROVIDE THE SAME DEGREE OF ENVIRONMENTAL PROTECTION. `P1#A-T—TH8 PLANWAS-',AFPROVEU"'OVFR,, A"'Y'EAR AGO WITHOUT COMMENT FROM THE BOARD OF OWNER'S SIGNATURE,*anl .,,DATE: _SEPTEMBER 19, 1995 Bresnick, Attorney for Owner APPLICANT'S SIONATUR ' DATE: SEPTEMBER 19, 1995 Garen resnic , At.torney for Applicant PLEASE PROVIDE: 1, LOCUS map 2. Plot, building or septic plan 9, Mechanical data 4, AnY other informative documents, photographs, plane, etc. V0'r9' -Approved/Disapproved Chairman__ 7/4/93 Summary of Laws at issue concerning Cobbler's Corner Subdivision The Subdivision Control Law is the law regulating the process of land subdivision regulating the laying out and construction of ways, providing access to lots and ensuring sanitary conditions. It relates to a community's local zoning requirements to a uniform, statewide process for land division. The Board of Health's Sewer Connection Regulation is a local regulation which promotes the protection of groundwater from the biological and chemical hazards of sanitary sewage, through the use and development of a sewer collection system. The two are clear and separate regulations, not to be merged. Text of law in boldface, comments and interpretation in italics. Massachusetts General Law Chapter 41 section 81U: Subdivision Control: Approval, modification or disapproval of plan by board; prerequisites for decision When a definitive plan of a subdivision is submitted to the planning board, as provided in section 81 O, a copy thereof shall also be filed with the board of health or board or officer having like powers and duties. Such health board or officer shall, within forty-five days after the plan is so filed, report to the planning board in writing, approval or disapproval of said plan, and, in the event of disapproval, shall make specific findings as to which, if any, areas shown on such plan cannot be used for building sites without injury to the public health, and include such specific findings and the reasons therefor in such report, and where possible, shalt make recommendations for the adjustments thereof. (Example of this is the Elms Subdivision and the resulting effects on water quality. Another example would be the use of a landfill for a subdivision) Failure of such Board or officer to report shall be deemed approval by such board or officer. (An approval through silence, referred to as a constructive grant.) Such health board or officer shall send a copy of such report, if any, to the person who submitted said plan. When the definitive plan shows that no public or community sewer is to be installed to serve any lot thereon, approval by a board of health or officer shall not be treated as, nor deemed to be approval of a permit for the construction and use on any lot of an individual sewage system; and approval of a definitive plan for a subdivision by a board of health or officer shall not be treated as, nor deemed to be, an application for a permit to construct or sue an individual sewage system on any lot contained therein. (Supports the Board in that an approval of the subdivision through silence is not an insplicit approval of individual septic systems) Statute moves on to other matters, not relevant to Board of Health regulations. Sewer Connection Regulation attached, Article 2 and 3 relevant. September 15, 1995 Chronology of Cobblers Corner Sewer Connection Request September 14, 1995, Compiled by Scott Leite, Health Agent • March 8, 1994 (Tuesday) 3:35 PM Definitive plan of Cobbler's Corner Subdivision filed with Town Clerk's Office. • March 14, 1994 (Monday) Letter from Health Agent to Allen Willis regarding Cobbler's Corner Subdivision and the Board of Health Sewer Connection Regulation. • April 14, 1994 Letter from RIM Engineering including Preliminary Sewer Cost Estimate for Cobbler's Corner Subdivision. • April 21, 1994 Board of Health meeting Agent brings forward RIM letter of April 14. • May 12, 1994 At request of Board of Health, Agent forwards RIM April 14 letter to Town Engineer for comment. • June 1, 1994 Memo from Town Engineer regarding RIM April 14 letter. • June 2, 1994 Discussion of RIM April 14 letter deferred to meeting with full Board. • July 7, 1994 Board of Health meeting, Agent reports to Board that a discussion with RIM Engineering took place regarding possibility of alternatives to RIM April 14 letter, and should be considered. • August 18, 1994 Board of Health meeting, No word regarding sewering of Cobbler's Corner Subdivision. • September 15, 1994 Board of Health meeting, No word regarding sewering of Cobbler's Corner Subdivision. • October 6, 1994 Board of Health meeting, No word regarding sewering of Cobbler's Corner Subdivision. • October 20, 1994 Board of Health meeting, No word regarding sewering of Cobbler's Corner Subdivision. • November 3, 1994 Board of Health meeting, No word regarding sewering of Cobbler's Corner Subdivision. • November 17, 1994 Board of Health meeting, No word regarding sewering of Cobbler's Corner Subdivision. • December S, 1994 Board of Health meeting, No word regarding sewering of Cobbler's Corner Subdivision. • January 5, 1995 Board of Health meeting, No word regarding sewering of Cobbler's Corner Subdivision. • January 19, 1995 Board of Health meeting, No word regarding sewering of Cobbler's Corner Subdivision. • February 2, 1995 Board of Health meeting, No word regarding sewering of Cobbler's Corner Subdivision. Deleted from agenda. • On or about August 31, 1995 Stanley Feck requests site evaluation of 2 lots in Cobbler's Corner Subdivision on Willow Street. Agent reiterates process regarding subdivision, but will revisit with Board of Health. • September 7, 1995 Allen Willis, owner of Cobbler's Corner Subdivision, discusses standing of subdivision with regard to Board of Health regulation with Agent. Agent will revisit with Board at this evenings meeting. September 7, 1995 Board of Health meeting discussed Cobbler's Corner subdivision regarding Sewer Connection Regulation. No change in pursuit of the Board's desire to sewer subdivision, if possible. September 8, 1995 Return check and site evaluation applications to Stanley Feck. Allen Willis calls to discuss previous evening meeting and standing of subdivision. September 12, 1995 Agent meets with Allen Willis and his attorney Garen Bresnick. Planning Director Shaun Burke also attending. Summary of meeting: 1. Willis believed harmed by Board because was not rendered a "timely decision". 2. Agent's concession to portion of "timely decision" was that spoke with RIM in June 1994 regarding alternatives, rather than send letter. 3. Discussed variance procedure for Sewer Connection Regulation and options regarding variance requests/possible outcome. 4. Willis claimed discussion "few hours ago" with RIM revealed April 14 letter did not include on -site sewer work. Willis told to substantiate claim and submit to Board for review. 5. Discussion included frequent blending of Subdivision Control Law and Board of Health Sewer Connection Regulation which are unrelated in process. 6. Willis and Attorney wish to attend September 21 meeting to discuss variance. 7. Attorney will contact agent on September 13. September 13, 1995 No contact from Attorney or Willis. RIM Engineering calls, new report will be delivered on September 14. 39 LARCRIDGE LANE ASHLAND, MA. 01721 Board of Health Town of Mansfield C/O Scott Leite Town Hall - 50 West Street Mansfield, MA 02048 GAREN M. BRESNICK ATTORNEY AT LAW TELEPHONE: (508) 881- 6776 TELECOPIER (508) 881- 7210 September 14, 1995 RE: Sewer / Septic Systems - Cobblers Corner Subdivision - Dear Board of Health Members: On behalf of my client, Allen L. Willis, of Gloria Drive, Mansfield, owner of the residential subdivision known as Cobbler's Corner, off Willow Street, Mansfield, I hereby request a waiver of the Board's Sewer Connection Regulations, based on the following facts and documentation. On or about April 11, 1994, during the time period when this subdivision was before the Planning Board for review and definitive plan approval, the project engineer, Ralph Maloon, of RIM Engineering sent a letter to the Board which provided the Board with preliminary cost estimates for sewering the proposed 19 lot subdivision. Said document which indicated a cost for sewer in the range of $119,000.00 and a per lot cost of $6,200.00 However, from that date, through the remainder of the subdivision approval process, neither my client or the Planning Board received any formal response to the issue as to whether sewer would be required in the said subdivision. On that basis, the Planning Board approved the definitive plan without sewer, believing as did my client, that the Board of Health, by its lack of response determined that sewer was not reasonable for the project. As late as last week, when a prospective purchaser of the front 4 lots came to the Health Agent for percolation tests, he and the my client was informed that the issue of sewer for this project had not yet been resolved, and hence the tests were denied. We now learn that the issue of Cobblers Corner was carried on the Agenda of the Board of Health for several meetings, each time with no written notice to my client, and only a verbal mention by the Health Agent to our engineer, which, to our understanding and belief cam after subdivision approval and as a suggestion that Mr. Willis look at a "force main" with individual grinder pumps, as an alternative means of sewering along the abutting street to the subdivision. With all due respect to the Board and Health Agent, not having received any formal or written notice concerning this situation, Mr. Willis now finds himself at the eleventh hour, with the sale of 4 lots now possibly lost, requesting a waiver / variance from the Board's Regulations. Cobbler's Corner Page 2. Based on the recalculations of RIM Engineering, which are attached hereto, there are two ways in which this site might be sewered. First is by a gravity main with a pumping station, and the other is by use of a smaller force main which employs individual grinder pumps. Based on the cost estimates attached the gravity alternative will cost approximately $150,000 for the project with a distributed cost of approximately $8,000 per unit. The pump station would lift the sewage from the site to a force main in Willow Street and the line as long Willow to Spring Street would not be available to any abutters on Willow Street. The $8,000. represents about a 100% increase above the anticipated $4,000.00 cost for an on -site system. The force main alternative would require each owner to install a grinder pump and chamber. The cost for that alternative would be $169,000 with a distributed cost of $8,900. per unit, which is approximately 125% increase over the $4,000. anticipated cost for an on -site system. While this would make the line in Willow Street available to other property owners, the cost for such connections with grinder pump and chamber installations would cost each parry approximately $5,000. which we believe is beyond the point of affordability for most home owners. Based on these facts, Mr. Willis hereby requests a waiver / variance be granted to allow use of on site sewage disposal systems for the 19 lots which comprise the Cobbler's Corner Subdivision. We further petition that the Board make a decision at its next meeting in view of the advanced nature of the project and the fact that the subdivision plan has now been approved for about 1 year without comment or further notice from the Board as to this situation. In the event that the Board is unable to fully act on this request at its meeting of 9/21/95, we further request that the Board, tonight, grant a waiver / variance as to the 4 lots fronting on Willow Street, being lots no. 1, 2, 18, and 19, allowing them to move forward to percolation test, design and construction of on site systems. Very truly yours, Garen M. Bresnick, Esq. for Allen L. Willis, Applicant AENGINEEPRINGCO.,IINC. Drainage Studies • Percolation Tests • Sewage Disposal Plans • Topographical Surveys Wetland Filings • Land Court Surveys • Site Plans • Residential and Industrial Subdivisions September 14, 1995 Mansfield Board of Health Town Hall 50 West Street Mansfield, MA 02048 Re: "Cobblers Corner" Subdivision Board of Health Members; I have been requested to review my cost estimate for sewering "Cobblers Corner" Subdivision and to calculate the cost using grinder pumps rather than one pumping station. Enclosed is my April 11, 1994 report and cost estimate. The only change is the addition of 2 town inspection fees. Enclosed also is a cost estimate for using 2 grinder pumps for each house rather than a single pumping station. Please note that these are only preliminary cost estimates. Many factors not included could cause a rise in cost such as ledge, high ground water, avoidance of existing utilities, etc. Sincerely, Ralph I. Maloon RIM/dl Encl. 150 North Main Street • Mansfield, Massachusetts 02048 • (508) 339-3731 Drainage Studies • Percolation Tests Sewage Disposal Plans • Topographical Surveys Wetland Filings • Land CourtSurveys Site Plans • Residential and Industrial Subdivisions ENGINEERING CO., INC. 11 April 1994 Mansfield Board of Health Town Hall - 50 West Street Mansfield, MA 02048 RE: "Cobbler's Corner" Subdivision Board of Health Members: Enclosed is a Preliminary Sewer Cost Estimate for the cost of installing sewer for "Cobbler's Corner" Subdivision. The closest existing sewer from the site is the sewer main on Spring Street, about 2270 feet from the site entrance. The second closest sewer is the sewer manhole at Leonard and Willow Streets, about 2500 feet from the site entrance. Both routes would require a force main and since the second route (Leonard St.) would require installing pipe under the 4 culverts for the Rumford River at Willow Street, it is apparent that the route to Spring Street would be the less expensive. The costs are calculated using prices from "Means Building Construction Cost Data" which is the method used by the Mansfield Planning Board for setting bonds. In this case since there is no design approved by the Town and the State , I am using the minimum necessary to sewer the site; a gravity sewer on -site, a pumping station on Lot 2, and a force main in Willow Street. The trench paving on willow Street is assumed as 3-foot wide base coat pavement over the trench and 18-foot wide top coat pavement over the street. The street is presently such a mess of depressions and cracks that it would be impossible to do a reasonable job over the trench area only. The actual cost could escalate due to requirements added during the approval process. Sincerely, Ralph I. Maloon RIM/pp Enclosure 150 North Main Street • Mansfield, Massachusetts 02048 • (508) 339-3731 TOWN OF MANSFIELD, MASSACHUSETTS 50 West Street, Mansfield, MA 02048 MEMORANDUM To: Bob Swanson, Town Engineer —� From: Scott Leite, Health Age Re: Cobbler's Corner Subdivision, Sewer Possiblity Date: May 12, 1994 The Board of Health requests that you review and comment on the attached plan for the proposed Cobbler's Corner Subdivision, off Willow Street, with respect to the following: 1. Application to the Sewer Master Plan. 2. Possible lower cost alternatives for sewering. The applicant, Mr. Willis, is anxious for a response from the BOH as this project relates to their Sewer Connection Regulation. Your response will be greatly appreciated. Thank you. TOWN OF MANSFIELD, MASSACHUSETTS 50 West Street, Mansfield, MA 02048 MEMO TO: Board of Health Scott Leite, Health Agent FROM: Engineering Department / DATE: 6/1/94 SUBJECT: Review of Sewer for Cobbler's Corner Subdivision Your men'io requests that we analyze the developer's sewer layout. with respect to the Town's sewer masterplan. During the permitting process for the Lifecare Facility the sewer masterplan was revised for tliis area. The present design matches the sewer design for the Lifecare Facility and thus agrees with the masterplan. Your memo also requests us to identify any cost saving measures which the developer could employ to make the sewer installation more economically feasible. The only cost savings measure that I can identify is to allow the developer to install the force main to Spring Street along the side of the; road and then not require full width paving of Willow Street. The full width paving previously offered with the Lifecare Facility also included a gravity sewer in Willow Street to flow from Spring Street back to the pump station. Since this gravity sewer will not be installed now there is no need for the full width paving. Possibly another developer may wish to install the gravity sewer at a later time or residents with failing septic systems could install it. File: B2: COBLRCNR TOWN OF MANSFIELD, MASSACHUSETTS 50 West Street, Mansfield, MA 02048 March 14, 1994 Allen L. Willis P.O. Box 748 Mansfield, MA 02048 Re: Cobbler's Corner Subdivision Dear Mr. Willis, I am in receipt of the Definitive Subdivision Plan for Cobbler's Corner, naming yourself as owner and applicant. Enclosed please find the Board of Health Sewer Connection Regulation. Article 2, Proposed Development and New Construction, requires that connection to common sewer be explored prior to granting permits for the construction of septic systems. If I can be of assistance, please do not hesitate to call. Very truly yours, BOARD OF HEALTH Sc-b't{Leite Health Agent /dr TOWN OF MANSFIELD, MASSACHUSETTS 50 West Street, Mansfield, MA 02048 BOARD OF HEALTH SEWER CONNECTION REGULATION AUTHORITY: Under the authority granted by Massachusetts General Laws: chapter 111, section 31; chapter 111, section 127 and chapter 83, section 11 the Board of Health adopts the following regulation. PURPOSE: The purpose of this regulation is to protect groundwater from the biological and chemical hazards of sanitary sewage, through the use and development of a sewer collection system. DEFINITIONS: Accessory Building: Any subordinate building having sanitary facilities, whether detached or attached, to the main build- ing located on the same lot, utilizing an individual sewage disposal system. Commercial Building: Any building having sanitary facilities not used as a dwelling or accessory building. Lot: An area of land under one ownership, with definite boundaries. Multi -family dwelling: Any building used as a dwelling with more than one dwelling unit. Owner: Every person who alone or severally with others (a) has legal title to any dwelling, building or parcel of land, vacant or otherwise; or (b) has care, charge or control of any dwelling, building or parcel of land, vacant or otherwise in any capacity including but not limited to agent, executor, executrix, administrator, administrix, trustee or guardian of the estate of the holder of legal title; or (c) mortgagee in possession; or (d) agent, trustee or other person appointed by the courts; or (e) any officer or trustee of the associ- ation of unit owners of a condominium; or (f) the record owner; or (g) the person in possession of the property. Each such person is bound to comply with the provisions of this regulation as if he were the owner. Subdivision: As defined in "Rules and Regulations Governing the Subdivision of Land, Mansfield, Massachusetts". Residential Cluster Development: A plan for land use approved by the Planning Board as described in the "Zoning By-law 5.6 Cluster Residential Special Permit". Residential Compound: A plan for land use approved by the Planning Board as described in the "Zoning By-law 5.6 Residential Compound". ARTICLE 1. BUILDINGS ACCESSIBLE TO SEWER Section 1. Failed Septic Systems The owner of a building or buildings, wherever a common sanitary sewer is accessible in an abutting way, shall cause such building or buildings to be connected with the common sanitary sewer upon failure of the septic system as defined in "Requirements for the Subsurface Disposal of Sanitary Sewage" 6. Nuisance and Failure of Septic Systems. Section 2. Multi -family Dwellings Where the density of one dwelling unit per 5,000 square feet of a lot is exceeded, the owner of a multi -family dwelling, wherever a common sanitary sewer is accessible in an abutting way, shall cause such dwelling to be connected with the common sanitary sewer within one year of the completion of a sewer or adoption of this regulation, whichever is greater. Section 3. Commercial Buildings Where the volume of discharge of sanitary sewage exceeds 330 gallons per day per 5,000 square feet of a lot is exceeded, the owner of a commercial building or buildings, wherever a common sanitary sewer is accessible in an abutting way, shall cause such building(s) to be connected with the common sanitary sewer within one year of the completion of a sewer or adoption of this regulation, whichever is greater. Section 4. Transfer of Ownership An existing building or buildings, wherever a common sanitary sewer is accessible in an abutting way, shall be connected with the common sanitary sewer upon transfer of the property to any other party. This section shall take effect twelve noon on February 1, 1993. Any Purchase and Sales Agreement signed prior to that time shall be exempt from this Section. ARTICLE 2. PROPOSED DEVELOPMENT AND NEW CONSTRUCTION Connection to the common sewer in the vicinity of proposed development and new construction of subdivisions, residential cluster development, residential compounds, multi -family dwellings, commercial buildings, single family dwellings, and any other building having sanitary facilities shall be pre- sumed feasible, unless the Board of Health finds that it is not technically or economically feasible to do so. No such finding shall be made, except upon the application of the owner or his agent (designated in writing), prior to the date required for a connection. In making a finding, the Board shall weigh the cost of connecting to the common sewer, and related technical and access issues, against the cost of providing and maintaining alternative sewage disposal facilities in full compliance with applicable rules and regulations. It is the intent of the Board that connection be made to the common sewer in every case, unless by clear and convincing evidence it is not feasible to do so. It is the burden of the applicant for relief to produce such clear and convincing evidence that the required connection is not feasible, or that the new construction is exempt from this regulation. ARTICLE 3. VARIANCE Section 1. The Board of Health may vary the application of any provision of this regulation, with respect to any parti- cular case where, in its opinion (1) the enforcement thereof would do manifest injustice; and (2) the same degree of environmental protection is met, provided that the decision of the Board of Health shall not conflict with the spirit of these requirements. Criteria for consideration of a variance may include, but not be limited to density, use loading and hardship. Any variance shall, while it is in effect, be available to the public at all reasonable hours in the office of the Board of Health. Section 2. The Board of Health may require a variance to be recorded at the Bristol County Registry of Deeds. ARTICLE 4. PENALTIES Section 1. The penalty for violation of Articles 1, 2 and 3 shall be $ 50.00 per day for every day the violation exists. Section 2. A variance to these regulations shall not be effective until recorded and no work shall commence and no on site septic system shall be maintained until evidence of recording has been delivered to the Board of Health. ARTICLE 5. SEVERABILITY Each article and section of this regulation shall be construed as separate to the end that if any section or sentence, clause, or phrase thereof shall be held invalid for any reason, the remainder of that section shall continue in full force. by MANSFIELD BOARD January 7, 1993 Amended March 18, 1993 A TRUE COPY ATTEST: -1 udith F. Scott, CMC, Town Clerk HEALTH Board of Health Page 3, June 2,1994 1. Approval of Pushcart Permits: FanFare, Inc. (12) m. Approval of Temporary Food Service Permit: Sunoco, June 9-1lth MOTION: To approve Consent Agenda. Sosman/Forget. 2-0-1, Austin abstained. VOTED. MOTION: To approve Snack permit for Knapp Foods, d/b/a Knapp Video. Forget/Sosman. 2-0-1, Austin abstained. VOTED. 3. COMMUNICATIONS a. Memo from Engineering Dept., June 1, re: Cobbler's Comer Sewering. Board discussed suggestions in the memo, i.e. present design for Cobbler's Comer matches sewer design for former proposed and abandoned plan for Lifecare Facility (matches Master Plan). Also, to save developer money, he may install a forced main to Spring Street. No one else can hook up to a forced main. Town does not like to own pump stations, which are costly to build and later to maintain. Mr. Willis had just developed 6 lots on septic and now want to to a 19-lot subdivision. Another question is will Sewer Commissioners approve the hookups. Board will discuss when full and Chair suggested a joint meeting with Sewer Commissioners. b. Letter from Groundwater Technology, May 26, 1994, update of 340 So. Main St. c. Copy letter from Dr. & Mrs. Stanley Sohn, 621 East St., May 25, 1994, re: Solid Waste, DeGirolamo, East St. 4. VISITORS No visitors tonight. 5. HEALTH AGENT'S REPORT a. Swimming Pools: Agent referred to 105 CMR: Dept. Public Health, Mass. General Laws, 435.23: Lifeguards. Did Board want to require lifeguards or simply a sign that states, "No Lifeguard on Duty", which is acceptable by above stated law. Presently, the sign is posted. MOTION: To continue to require "No Lifeguard on Duty" sign, as required by law. Sosman/Forget. All in favor. VOTED Board of Health Page 6, July 7, 1994 Agent read Town Manager's response to Board re: 4th of July weekend and the possiblity of the "boil order" continuing. Agent explained to Town Engineer why a dishwasher is safe to use during the boil order. If you need to boil water for 3-5 minutes to kill the bacteria, then pouring boiled water over dishes after they've been through the dishwasher cycle certainly could not be worthy of doing. The heat from the dishwasher dry cycle could be sufficient. c. Cobbler's Corner: If sewered, there would be a forced main to which no one could hook into. Agent told Mr. Willis's engineer, Ralph Maloon, that a different method of sewering exists that they might consider. Haven't heard back yet. Member Sosman asked if there were adjacent properties for future development. Agent replied that he did not think so. 7. NEW BUSINESS a. TB Threat: Member Steele asked if it would be prudent for Community Visiting Nurse Agency to test every resident in Mansfield for TB? Agent responded that he is unaware of a threat and that anyone who is required to have a TB test does go to CVNA. MOTION: To adjourn at 10.00PM Sosman/Forget. All in favor. VOTED Respectfully submitted, Dianne Royle Recording Secretary NEXT MEETING: AUGUST 4, 1994 TOWN HALL Clerk: Board of Health Page 4, August 18, 1994 Member Steele suggested that items in #3 could be free from agencies such as Norcap, AA, Southwood Community Hospital, etc. Training for police and fire had been mentioned between Ms. Farrugia and Mr. Leite. Board agreed to share with a small contribution in the cost of this training. j. Peres and Plans: Peres 29 and Plans 136. 6. OLD BUSINESS a. Cobbler's Corner: No word from Mr. Willis, the developer, re: sewerline. b. Smoking Reg: Member Sosman reported that Easton and Sharon will most like be adopting a reg more stringent than Mansfield. Charlotte Scozzafava, TGC Coordinator, sent a draft reg to Mansfield for their consideration. Some of the changes are: all restaurants smoke free, category of fines, prohibition of vending machines, tobacco retailers permit. Member Sosman again asked that members review the draft for discussion line -by-line at next meeting on September 15th. Also, town of Norton will be added to the group on a one-year trial basis. Commonwealth recommended a memo of agreement with Norton. Ms. Scozzafava is asking for a part-time compliance monitor and the addition of student assistance. Board agreed that the pay raises for Ms. Scozzafava and Sheila Miller, health educator, will be the average that the three towns are getting for FY95. 7. NEW BUSINESS - Nothing tonight. 8. ADJOURNMENT MOTION: To adjourn at 9:35 PM Fontanini/Forget. All in favor. VOTED Respectfully submitted, Dianne Royle, Recording Secretary NEXT MEETING: SEPTEMBER 15, 1994, TOWN HALL Board of Health Page 3, September 15, 1994 h. Title V: Revisions will take effect November 10th. Will be available in State Book Store on September 24th. Agent will buy a copy then, if it is not sent to office from the State. i. Data Base for Licenses: Hope to establish in the near future a data base for every department that issues licenses. Also, a geographical data base will be established to give various info about a log, i.e., square footage, depth to groundwater, on sewer or septic, # bedrooms, public water, etc. Eventually, I -net will connect every PC so that this info can be shared. j. Peres and Plans: Peres 34 and Plans 140. k. Vacation: Agent on vacation Sept. 19-23rd. Secretary will work later into the day and Inspector of Buildings will cover for septic inspections. 6. OLD BUSINESS a. Cobbler's Corner: No word from Mr. Willis, the developer, re: sewerline. b. Smoking Reg: Postponed, either October 6th or 20th. c. Postmortem Meeting --Water Emergency: Postponed, Nov. 3rd. Member Steele asked if the bacteria has been cleared up yet and if they know what caused it?. It fluctuates, Agent responded, but lately has been clear, and they do not know exactly what caused it. There are different theories, but it is very difficult to pinpoint. Could be watertable changes, geese droppings, adjacent swamp being pulled down. How many families have changed to bottled water? Secretary will contact Belmont and Simpson Springs. Member Steele wondered if septic systems caused the bacteria and strongly advocated for town sewer throughout Mansfield. 7. NEW BUSINESS a. Jameson Farm, Mill St.: Letter, Aug. 25, 1994, Hutchins -Trowbridge Associates, asked for a waiver of the Sewer Connection Regulation to allow on -site septic for 10-lot subdivision off Mill St. Sewerline would have to be extended 900' and will only service 5 out of 10 lots by gravity. Because of the drop in grade, the remaining 5 lots would require a grinder pump. Cost approx. $97,000 ($9,700/lot vs. $4,000/lot septic). Board members discussed the mechanics of the sewer installation and cost, but felt that since the subdivision is in a water protection zone, it is beneficial to groundwater quality to sewer the lot.