HomeMy WebLinkAboutTransition - 10/11/1994William F. Weld
Governor
Trudy Coxe
Secretary, EOEA
Thomas 8. Powers
Acting Commissioner
Commonwealth of Massachusetts
Executive Office of Environmental Affairs
Department of
Environmental Protection
Southeast Regional Office
ccull
my 12, 1994
Merrymount Associates RE: MANSFIELD--WSC/SA-4-0955
c/o Federal Deposit Insurance Fmr. Gorham Silver Co.
Corp., (successor to 26 Edgewood Street/South
Guaranty -First Trust Co.) Main Street, Permit No.82652
1 Research Drive Tier I Classification &
P.O. Box 5050 Transition Statement
Westborough, Massachusetts 01581
ATTENTION: Peter Nelson
Gentlemen:
The Massachusetts Department of Environmental Protection (DEP)
has redesigned the Waste Site Cleanup Program. The revised
Massachusetts Contingency Plan ("MCP") and related fee regulations
(310 CMR 4.00) became effective on October 1, 1993. The new MCP
(310 CMR 40.0000) includes specific requirements for sites which
had been classified as "priority disposal sites" under the 1988
version of the MCP in order for them to make the transition into
the redesigned program. (See enclosed Transition Fact Sheet #5
for more information.)
This letter is being sent to you regarding the above -
referenced site which was previously classified as a "priority
disposal site" and listed as such on DEP's August 1993 Transition
List of Confirmed Disposal Sites and Locations to Be Investigated,
or Addendum thereto. Guaranty -First Trust Company has been
previously identified as a "Potential Responsible Party" (PRP) for
the above -referenced site with liability under MGL c.21E 55.
EXISTING APPROVALS
Response actions which received DEP approval prior to October
1, 1993, must continue in accordance with the terms of the approval
[see 310 CMR 40.0640(1)(c)]. An LSP may be engaged or employed,
but is not required, to oversee response actions previously -
approved by DEP. If an LSP is engaged or employed, he or she
should be identified to DEP. Once work under existing approvals is
complete, all future response actions must be conducted according
to the terms of the revised MCP and will require the use of an LSP.
20 Riverside Drive 9 Lakeville, Massachusetts 02347 a FAX (508) 947-6557 a Telephone (508) 946.2700
-2-
The above -referenced site has the following approval(s) for
response actions:
Short Term Measures:
(1) A proposal entitled, "Work Plan for Additional Short Term
Measure Tasks", prepared by Groundwater Technology, Inc.,
dated January 5, 1993 was approved by DEP on March 3, 1993.
(2) Two (2) proposals entitled, "Short Term Measure Proposal",
dated June 28, 1991 and "Short Term Measure Proposal
Addendum", dated October 17, 1991 both prepared by Rizzo
Associates, Inc. were approved by DEP on October 23, 1991.
These approvals are also included in Attachment B(1) of the
Transition Statement. These response actions must continue until
they are completed.
TRANSITION CLASSIFICATION
Under the new MCP, sites will be classified as either Tier I
or Tier II. All Tier I sites require permits to proceed with
assessment and remediation. Sites classified as Tier IA will be
managed by a Licensed Site Professional (LSP) under the
Department's direct oversight. Tier IB and IC sites will be
managed by LSPs and will not receive direct oversight by DEP, but
will be subject to DEP audit.
The Transition regulations of the new MCP (310 CMR 40.0640),
categorically classify all sites which had been listed as "priority
disposal sites" as Tier IA sites. The new regulations allow DEP to
determine the nature and extent of Departmental oversight required
for transition priority disposal sites and, based on the criteria
in 310 CMR 40.0730, classify them as Tier IB sites instead of the
categorical Tier IA. Using these criteria and existing available
information, the Department has determined that the above -
referenced site is classified as Tier IB.
TRANSITION PERMIT STATEMENT
The new MCP does not require submittal of a new permit
application for priority disposal sites. Instead, DEP will issue
a "Transition Classification and Permit Statement" (Transition
Statement) to those with potential liability under MGL c.21E §5
which describes the site's classification and the terms of the
transition permit. This Statement, if signed and dated by the PRP,
Department.
-3-
The Transition Statement for the above -referenced site is
attached for your review and action. According to 310 CMR
40.0640(3), you must return the Transition Statement to DEP within
120 days of your receipt of this letter indicating whether you (1)
accept the terms of the Transition Statement, (2) disagree with
DEP's classification of the site, or (3) do not accept the terms of
the Transition Statement. These options are as follows:
(1) Accept Transition Statement: To accept the terms of
the Transition Statement, please sign and date both copies of
the Statement at Paragraph 111" and return one copy to this
office. (Please also send a copy of one of the signed
Transition Statements to the Chief Municipal official and
Chairman of the Board of Health.) Annual Compliance Fees for
Tier IB will be assessed starting October 1, 1993. The Tier
IB Transition Permit is effective upon the Department's
receipt of the signed and dated Transition Statement (310 CMR
40.0640(3)(b)l.a].
(2) Disagree with Transition Statement: If you do not agree
with the Department's determination that this site should be
classified as Tier IB because, in the Opinion of an LSP, the
site should be reclassified as IC or Tier II, sign and date
both copies of the Statement at Paragraph 112" and return one
copy to this office within 120 days. (Please also send a
copy of one of the signed Transition Statements to the Chief
Municipal official and Chairman of the Board of Health.) In
order to change the site's permit category and in order to
continue response actions at the subject site, you must obtain
a Major Permit Modification from DEP. To do so, you must
submit a "Major Permit Modification" application (310 CMR
40.0707), which includes an LSP Tier Classification Opinion,
and fee of $1200. This application will then be processed
according to the provisions of 310 CMR 40.0700. The
appropriate Annual Compliance Fee will be determined pending
the outcome of the permit modification.
If you wish to conduct assessment activities (such as the
sampling of existing monitoring wells, the sampling of
surficial soils, and the monitoring of vapors inside
buildings) within 120 days in an effort to document a lower
Tier Classification for the purposes of filing a Major Permit
Modification with DEP, you may do so. However, "intrusive"
assessment activities (subsurface investigations involving
test pits, new monitoring wells, and soil borings, etc.),
will require prior DEP approval, unless they are being done as
part of a response action which already has DEP approval.
-4-
(3) Do Not Accept Transition Statement: If you do not accept
this Transition Statement, you must sign and date the
Statement at Paragraph 113-A" or 113-B" and return one copy to
this office. (Please also send a copy of one of the signed
Transition Statements to the Chief Municipal Official and
Chairman of the Board of Health.) You must also indicate
whether or not you intend to conduct any response actions
which were approved by DEP prior to October.1, 1993. If you
do not intend to conduct such response actions, you must
include an explanation pursuant to 310 CMR 40.0171 and
40.0172. If you do intend to conduct these response actions,
you must include a schedule for completing them.
Whether or not you intend to complete work previously
approved, you must submit a Status Report which includes an
LSP Opinion as to whether a Temporary or Permanent Solution
has been or will be achieved at the site, and if not, the
response actions necessary to do so [310 CMR 40.0640(3)(b)31.
Please note that if this site is adjacent to another disposal
site where response actions are being conducted, it may be
necessary to coordinate your response actions with those being
undertaken on the adjacent site. All persons authorized to conduct
response actions under a Tier I permit must comply at all times
with MGL c. 21E, 310 CMR 40.0000, permit terms and conditions and
any other applicable federal, state, and local law. Failure to
comply with all applicable requirements shall be cause for the
Department to initiate enforcement action, including, without
limitation, permit suspension and revocation.
If the enclosed Transition Statement is not returned to the
Department within 120 days of its receipt, or if the Statement
indicates that you do not accept the Transition Permit under
paragraph (3) above, the Annual Compliance Fee for Tier IB sites
($2,600) will be assessed, beginning on the day after such
Transition Statement is due [310 CMR 40.0640(4)]. In addition, DEP
may commence appropriate enforcement actions to ensure that the
required response actions for the above -referenced site are
initiated and completed in a timely manner.
Please note that should there be more than one PRP performing
response actions at the above -referenced site, all must sign the
Transition Statement and are encouraged to designate a Primary
Representative.
We recognize that there may be difficulties and confusion
during the transition of existing sites from the old MCP to the new
MCP. The new MCP, however, offers many incentives and
opportunities for streamlined, timely, and efficient cleanups. It
-4-
is our intent to provide you with as smooth a transition as
possible.
Should you have any questions about this letter or the
Transition Statement, please contact Mark Jablonski at 508-946-2819
or at the above address.
Very truly yours,
,
regg t, Acting Regional
Engineer for Waste Site Cleanup
H/MJ/rr
CERTIFIED MAIL #P337 626 829
RETURN RECEIPT REQUESTED
Attachments: Summary of Redesigned Program
Fact Sheet on LSPs
Transition Fact Sheet #5
310 CMR 40.0730
cc: Textron, Inc.
40 Westminster Street
Providence, RI 02903
ATTN: Richard A. McWhirther
Board of Selectmen
Town Hall
50 West Street
Mansfield, MA 02048
ATTN: Amos Robinson, Chairman
Board of Health
Town Hall
50 West Street
Mansfield, MA 02048
ATTN: Scott Leite, Agent
DEP - SERO
ATTN: Andrea Papadopoulos, DRD
DEP-SERO
ATTN: Data Entry
Commonwealth of Massachusetts
Executive Office of Environmental Affairs
Department of
Environmental Protection
Southeast Regional Office
William F. Weld
Governor
Trudy Coxe
Secretary, EOEA
Thomas B. Powers
Acting Commissioner
July 12, 1994
Textron, Inc. RE: MANSFIELD-WSC/SA-4-0955
40 Westminster Street Fmr. Gorham Silver Co.
Providence, Rhode Island 02903 26 Edgewood Street/South
Main Street
Permit No. 82652
Tier I Classification
and Transition Statement
ATTENTION: Richard A. McWhirter
Senior Vice President
Gentlemen:
The Massachusetts Department of Environmental Protection (DEP)
has redesigned the Waste Site Cleanup Program. The revised
Massachusetts Contingency Plan ("MCP") and related fee regulations
(310 CMR 4.00) became effective on October 1, 1993. The new MCP
(310 CMR 40.0000) includes specific requirements for sites which
had been classified as "priority disposal sites" under the 1988
version of the MCP in order for them to make the transition into
the redesigned program. (See enclosed Transition Fact Sheet #5 for
more information.)
This letter is being sent to you regarding the above -
referenced site which was previously classified as a "priority
disposal site" and listed as such on DEP's August 1993 Transition
List of Confirmed Disposal Sites and Locations to Be Investigated,
or Addendum thereto. Textron, Inc. has been previously identified
as a "Potential Responsible Party" (PRP) for the above -referenced
site with liability under MGL c.21E §5.
EXISTING APPROVALS
Response actions which received DEP approval prior to October
1, 1993, must continue in accordance with the terms of the approval
[see 310 CMR 40.0640(1)(c)3. An LSP may be engaged or employed,
but is not required, to oversee response actions previously -
approved by DEP. If an LSP is engaged or employed, he or she
should be identified to DEP. Once work under existing approvals is
complete, all future response actions must be conducted according
to the terms of the revised MCP and will require the use of an LSP.
20 Riverside Drive a Lakeville, Massachusetts 02347 a FAX (508) 947.6557 0 Telephone (508) 946.2700
CIA=
The above -referenced site has the following approval(s) for
response actions:
Short Term Measures:
(1) A proposal entitled, "Work Plan for Additional Short Term
Measure Tasks", prepared by Groundwater Technology, Inc.,
dated January 5, 1993 was approved by DEP on March 3, 1993.
(2) Two (2) proposals entitled, "Short Term Measure Proposal",
dated June 28, 1991, and "Short Term Measure Proposal
Addendum", dated October 17, 1991, both prepared by Rizzo
Associates, Inc., were approved by DEP on October 23, 1991.
These approvals are also included in Attachment B(1) of the
Transition Statement. These response actions must continue until
they are completed.
TRANSITION CLASSIFICATION
Under the new MCP, sites will be classified as either Tier I
or Tier II. All Tier I sites require permits to proceed with
assessment and remediation. Sites classified as Tier IA will be
managed by a Licensed Site Professional (LSP) under the
Department's direct oversight. Tier IB and IC sites will be
managed by LSPs and will not receive direct oversight by DEP, but
will be subject to DEP audit.
The Transition regulations of the new MCP (310 CMR 40.0640),
categorically classify all sites which had been listed as "priority
disposal sites" as Tier IA sites. The new regulations allow DEP to
determine the nature and extent of Departmental oversight required
for transition priority disposal sites and, based on the criteria
in 310 CMR 40.0730, classify them as Tier IB sites instead of the
categorical Tier IA. Using these criteria and existing available
information, the Department has determined that the above -
referenced site is classified as Tier IB.
TRANSITION PERMIT STATEMENT
The new MCP does not require submittal of a new permit
application for priority disposal sites. Instead, DEP will issue
a "Transition Classification and Permit Statement" (Transition
Statement) to those with potential liability under MGL c.21E §5
which describes the site's classification and the terms of the
transition permit. This Statement if signed and dated by the PRP.
Department.
-3-
The Transition Statement for the above -referenced site is
attached for your review and action. According to 310 CMR
40.0640(3), you must return the Transition Statement to DEP within
120 days of your receipt of this letter indicating whether you (1)
accept the terms of the Transition Statement, (2) disagree with
DEP's classification of the site, or (3) do not accept the terms of
the Transition Statement. These options are as follows:
(1) Accept Transition Statement: To accept the terms of
the Transition Statement, please sign and date both copies of
the Statement at Paragraph 111" and return one copy to this
office. (Please also send a copy of one of the signed
Transition Statements to the Chief Municipal Official and
Chairman of the Board of Health.) Annual Compliance Fees for
Tier IB will be assessed starting October 1, 1993. The Tier
IB Transition Permit is effective upon the Department's
receipt of the signed and dated Transition Statement (310 CMR
40.0640(3)(b)l.a).
(2) Disagree with Transition Statement: If you do not agree
with the Department's determination that this site should be
classified as Tier IB because, in the Opinion of an LSP, the
site should be reclassified as IC or Tier II, sign and date
both copies of the Statement at Paragraph 112" and return one
copy to this office within 120 days. (Please also send a
copy of one of the signed Transition Statements to the Chief
Municipal Official and Chairman of the Board of Health.) In
order to change the site's permit category and in order to
continue response actions at the subject site, you must obtain
a Major Permit Modification from DEP. To do so, you must
submit a "Major Permit Modification" application (310 CMR
40.0707), which includes an LSP Tier Classification Opinion,
and fee of $1200. This application will then be processed
according to the provisions of 310 CMR 40.0700. The
appropriate Annual Compliance Fee will be determined pending
the outcome of the permit modification.
If you wish to conduct assessment activities (such as the
sampling of existing monitoring. wells, the sampling of
surficial soils, and the monitoring of vapors inside
buildings) within 120 days in an effort to document a lower
Tier Classification for the purposes of filing a Major Permit
Modification with DEP, you may do so. However, "intrusive"
assessment activities (subsurface investigations involving
test pits, new monitoring wells, and soil borings, etc.),
will require prior DEP approval, unless they are being done as
part of a response action which already has DEP approval.
(3) Do Not Accept Transition Statement: If you do not accept
this Transition Statement, you must sign and date the
Statement at Paragraph 113-A" or 113-B" and return one copy to
this office. (Please also send a copy of one of the signed
-4-
Transition Statements to the Chief Municipal Official and
Chairman of the Board of Health.) You must also indicate
whether or not you intend to conduct any response actions
which were approved by DEP prior to October 1, 1993. If you
do not intend to conduct such response actions, you must
include an explanation pursuant to 310 CMR 40.0171 and
40.0172. If you do intend to conduct these response actions,
you must include a schedule for completing them.
Whether or not you intend to complete work previously
approved, you must submit a Status Report which includes an
LSP Opinion as to whether a Temporary or Permanent Solution
has been or will be achieved at the site, and if not, the
response actions necessary to do so (310 CMR 40.0640(3)(b)31.
Please note that if this site is adjacent to another disposal
site where response actions are being conducted, it may be
necessary to coordinate your response actions with those being
undertaken on the adjacent site. All persons authorized to conduct
response actions under a Tier I permit must comply at all times
with MGL c. 21E, 310 CMR 40.0000, permit terms and conditions and
any other applicable federal, state, and local law. Failure to
comply with all applicable requirements shall be cause for the
Department to initiate enforcement action, including, without
limitation, permit suspension and revocation.
If the enclosed Transition Statement is not returned to the
Department within 120 days of its receipt, or if the Statement
indicates that you do not accept the Transition Permit under
paragraph (3) above, the Annual Compliance Fee for Tier IB sites
($2,600) will be assessed, beginning on the day after such
Transition Statement is due [310 CMR 40.0640(4)). In addition, DEP
may commence appropriate enforcement actions to ensure that the
required response actions for the above -referenced site are
initiated and completed in a timely manner.
Please note that should there be more than one PRP performing
response actions at the above -referenced site, all must sign the
Transition Statement and are encouraged to designate a Primary
Representative.
We recognize that there may be difficulties and confusion
during the transition of existing sites from the old MCP to the new
MCP. The new MCP, however, offers many incentives and
opportunities for streamlined, timely, and efficient cleanups. It
is our intent to provide you with as smooth a transition as
possible.
M-M
Should you have any questions about this letter or the
Transition Statement, please contact Mark Jablonski at 508-946-2819
or at the above address.
V ry truly yours,
Gregg Hunt, Acting Regional
Engineer for Waste Site Cleanup
H/MJ/rr
CERTIFIED MAIL #P337 626 812
RETURN RECEIPT REQUESTED
Attachments: Summary of Redesigned Program
Fact Sheet on LSPs
Transition Fact Sheet #5
310 CMR 40.0730
cc: Merrymount Associates
c/o Federal Deposit Insurance Corp.
(successor to Guaranty -First Trust Company)
1 Research Drive
PO Box 5050
Westborough, MA 01581
ATTN: Peter Nelson
Board of Selectmen
Town Hall
50 West Street
Mansfield, MA 02048
ATTN: Amos Robinson, Chairman
Board of Health
Town Hall
50 West Street
Mansfield, MA 02048
ATTN: Scott Leite, Agent
DEP - SERO
ATTN: Andrea Papadopoulos, Deputy Regional Director
DEP - SERO
ATTN: Data Entry
Commonwealth of Massachusetts
Executive Office of Environmental Affairs
Department of
Environmental Protection
Southeast Regional Office
William F. Weld
Governor
Trudy Coxe
r i 1 Secretary, EGEA
o Pdwer;
<tirt Co nlsaloner
Cherokee -Mansfield, LP
702 Oberlin Road
Raleigh, North Carolina 27605
ATTENTION: Mr. Glenn Howell
Gentlemen:
December 20, 1994
RE: MANSFIELD--WSC/SA-4-0955
Former Gorman Silver Co.
26 Edgewood/340 N. Main St.
Permit No. 82652
Notice of Responsibility/
Tier I Classification
and Transition Statement
The Massachusetts Department of Environmental Protection (DEP)
has redesigned the Waste Site Cleanup Program. The revised
Massachusetts Contingency Plan ("MCP") and related fee regulations
(310 CMR 4.00) became effective on October 1, 1993. The new MCP
(310 CMR 40.0000) includes specific requirements for sites which
had been classified as "priority disposal sites" under the 1988
version of the MCP in order for them to make the transition into
the redesigned program. (See enclosed Transition Fact Sheet #5
for more information.)
This letter is being sent to you regarding the above -
referenced site which was previously classified as a "priority
disposal site" and listed as such on DEP's August 1993 Transition
or Addendum thereto.
STATUTORY LIABILITIES
The Department has reason to believe that you (as used in this
letter, "you" refers to Cherokee -Mansfield, Limited Partnership are
a Potentially Responsible Party ("PRP") with liability under M.G.L.
c. 21E, § 5, for response action costs. Section 5 makes the
following parties liable to the Commonwealth of Massachusetts:
current owners or operators of a site from or at which there is or
has been a release or threat of release of oil and/or hazardous
material; any person who owned or operated a site at the time
hazardous material was stored or disposed of; any person who
arranged for the transport, disposal, storage or treatment of
hazardous material to or at a site; any person who transported
hazardous material to a transport, disposal, storage or treatment
20 Riverside Drive a Lakeville, Massachusetts 02347 9 FAX (508) 947.6557 0 Telephone (508) 946-2700
-2-
site from which there is or has been a release or threat of release
of such material; and any person who otherwise caused or is legally
responsible for a release or threat of release of oil or hazardous
material at a site.
This liability is "str:i.c:t," meaning it is not based on fault,
but solely on your status as an owner, operator, generator,
transporter or disposer. It is also joint and several, meaning
that you may be liable for all response action costs incurred at
the site, regardless of the existence of any other liable parties.
The MCP requires responsible parties to take necessary
response actions at properties where there is or has been a release
and/or threat of release of oil and/or hazardous material. If you
do not take the necessary response actions, or fail to perform them
in an appropriate and timely manner, the Department is authorized
by M.G.L. c. 21E to performed the work. By taking such actions,
you can avoid liability for response action costs incurred by the
Department in performing these actions and any sanctions which may
be imposed for failure to perform response actions under the MCP.
You may be liable for up to three (3) times all response
action costs incurred by the Department. Response action costs
include, without limitation, the cost of direct hours spent by
Department employees arranging for response actions or overseeing
work performed by persons other than the Department or its
contractors, expenses incurred by the Department in support of
those direct hours, and payments to the Department's contractors.
(For more detail on cost liability, see 310 CMR 40.1200: Cost
Recovery.)
The Department may also assess interest on costs incurred at
the rate of twelve percent (12%), compounded annually. To secure
payment of this debt, the Commonwealth may place liens on all of
your property in the Commonwealth. To recover the debt, the
Commonwealth may foreclose on these liens or the Attorney General
may bring legal action against you.
In addition to your liability for up to three (3) times all
response action costs incurred by the Department, you may also be
liable to the Commonwealth for damages to natural resources caused
by the release. Civil and criminal liability may also be imposed
under M.G.L. c. 21E, § 11, and civil administrative penalties may
be imposed under M.G.L. c. 21A, § 16, for each violation of M.G.L.
c. 21E, the MCP or any order, permit or approval issued thereunder.
EXISTING APPROVALS
Response actions which received DEP approval prior to October
1, 1993, must continue in accordance with the terms of the approval
[see 310 CMR 40.0640(1)(c)]. An LSP may be engaged or employed,
but is not required, to oversee response actions previously-
-3-
approved by DEP. If an LSP is engaged or employed, he or she
should be identified to DEP. Once work under existing approvals is
complete, all future response actions must be conducted according
to the terms of the revised MCP and will require the use of an LSP.
The above -referenced site has the following approval(s) for
response actions:
(1) A proposal entitled, "Work Plan for Additional Short Term
Measure Tasks", prepared by Groundwater Technology, Inc.,
dated January 5, 1993, was approved by DEP on March 3,
1993.
(2) Two (2) proposals entitled, "Short Term Measure Proposal",
dated June 28, 1991, and "Short Term Measure Proposal
Addendum", dated October 17, 1991, both prepared by Rizzo
Associates, Inc. were approved by DEP on October 23,
1991. These approvals are also included in Attachment
B(1) of the Transition Statement. These response actions
must continue until they are completed.
TRANSITION CLASSIFICATION
Under the new MCP, sites will be classified as either Tier I
or Tier II. All Tier I sites require permits to proceed with
assessment and remediation. Sites classified as Tier IA will be
managed by a Licensed Site Professional (LSP) under the
Department's direct oversight. Tier IB and IC sites will be
managed by LSPs and will not receive direct oversight by DEP, but
will be subject to DEP audit.
The Transition regulations of the new MCP (310 CMR 40.0640),
categorically classify all sites which had been listed as "priority
disposal sites" as Tier IA sites. The new regulations allow DEP to
determine the nature and extent of Departmental oversight required
for transition priority disposal sites and, based on the criteria
in 310 CMR 40.0730, classify them as Tier IB sites instead of the
categorical Tier IA. Using these criteria and existing available
information, the Department has determined that the above -
referenced site is classified as Tier IB.
TRANSITION PERMIT STATEMENT
The new MCP does not require submittal of a new permit
application for priority disposal sites. Instead, DEP will issue
a "Transition Classification and Permit Statement" (Transition
Statement) to those with potential liability under MGL c.21E §5
which describes the site's classification and the terms of the
transition permit. This Statement if signed and dated by the PRP:
Department.
-4-
The Transition Statement for the above -referenced site is
attached for your review and action. According to 310 CMR
40.0640(3), you must return the Transition Statement to DEP within
120 days of your receipt of this letter indicating whether you (1)
accept the terms of the Transition Statement, (2) disagree with
DEP's classification of the site, or (3) do not accept the terms of
the Transition Statement. These options are as follows:
(1) Accept Transition Statement: To accept the terms of
the Transition Statement, please sign and date both
copies of the Statement at Paragraph 111" and return one
copy to this office. (Please also send a copy of one
of the signed Transition Statements to the Chief
Municipal Official and Chairman of the Board of
Health.) Annual Compliance Fees for Tier IB will be
assessed starting October 1, 1993. The Tier IB
Transition Permit is effective upon the Department's
receipt of the signed and dated Transition Statement
[310 CMR 40.0640(3)(b)l.a].
(2) Disagree with Transition Statement: If you do not
agree with the Department's determination that this
site should be classified as Tier IB because, in the
Opinion of an LSP, the site should be reclassified as
IC or Tier II, sign and date both copies of the
Statement at Paragraph 112" and return one copy to
this office within 120 days. (Please also send
a copy of one of the signed Transition Statements
to the Chief Municipal Official and Chairman of
the Board of Health.) In order to change the
site's permit category and in order to continue
response actions at the subject site, you must obtain
a Major Permit Modification from DEP. To do so, you
must submit a "Major Permit Modification"
application (310 CMR 40.0707), which includes an
LSP Tier Classification Opinion, and fee of
$1200. This application will then be processed
according to the provisions of 310 CMR 40.0700.
The appropriate Annual Compliance Fee will be
determined pending the outcome of the permit
modification.
If you wish to conduct assessment activities (such as
the sampling of existing monitoring wells, the sampling
of surficial soils, and the monitoring of vapors inside
buildings) within 120 days in an effort to document a
lower Tier Classification for the purposes of filing a
Major Permit Modification with DEP, you may do so.
However, "intrusive" assessment activities (subsurface
investigations involving test pits, new monitoring
wells, and soil borings, etc.), will require prior
-5-
DEP approval, unless they are being done as part
of a response action which already has DEP
approval.
(3) Do Not Accept Transition Statement: If you do not
accept this Transition Statement, you must sign and
date the Statement at Paragraph 113-A" or 113-B" and
return one copy to this office. (Please also send a
copy of one of the signed Transition Statements to the
Chief Municipal Official and Chairman of the Board of
Health.) You must also indicate whether or not you
intend to conduct any response actions which were
approved by DEP prior to October 1, 1993. If you do
not intend to conduct such response actions, you must
include an explanation pursuant to 310 CMR 40.0171 and
40.0172. If you do intend to conduct these response
actions, you must include a schedule for completing
them.
Whether or not you intend to complete work previously
approved, you must submit a Status Report which
includes an LSP Opinion as to whether a Temporary or
Permanent Solution has been or will be achieved at the
site, and if not, the response actions necessary to do
so (310 CMR 40.0640(3)(b)3].
Please note that if this site is adjacent to another disposal
site where response actions are being conducted, it may be
necessary to coordinate your response actions with those being
undertaken on the adjacent site. All persons authorized to conduct
response actions under a Tier I permit must comply at all times
with MGL c. 21E, 310 CMR 40.0000, permit terms and conditions and
any other applicable federal, state, and local law. Failure to
comply with all applicable requirements shall be cause for the
Department to initiate enforcement action, including, without
limitation, permit suspension and revocation.
If the enclosed Transition Statement is not returned to the
Department within 120 days of its receipt, or if the Statement
indicates that you do not accept the Transition Permit under
paragraph (3) above, the Annual Compliance Fee for Tier IB sites
($2,600) will be assessed, beginning on the day after such
Transition Statement is due [310 CMR 40.0640(4)]. In addition, DEP
may commence appropriate enforcement actions to ensure that the
required response actions for the above -referenced site are
initiated and completed in a timely manner.
Please note that should there be more than one PRP performing
response actions at the above -referenced site, all must sign the
Transition Statement and are encouraged to designate a Primary
Representative.
20
We recognize that there may be difficulties and confusion
during the transition of existing sites from the old MCP to the new
MCP. The new MCP, however, offers many incentives and
opportunities for streamlined, timely, and efficient cleanups. It
is our intent to provide you with as smooth a transition as
possible.
Should you have any questions about this letter or the
Transition Statement, please contact Mark Jablonski at 508-946-2819
or at the above address.
r truly yours,
n han l , Acting Chief
S to Management and Permits
ction
H/MJ/jt
CERTIFIED MAIL NO: P656 836 036
RETURN RECEIPT REQUESTED
Attachments: Summary of Redesigned Program
Fact Sheet on LSPs
Transition Fact Sheet #5
310 CMR 40.0730
cc: Board of Selectmen
Town Hall
50 West Street
Mansfield, MA 02048
ATTN: Amos Robinson, Chairman
Board of Health
Town Hall
50 West Street
Mansfield, 14A 02048
ATTN: Henry Austin, Chairman
DEP - Boston - BWSC
ATTN: Madeline Snow
DEP - SERO
ATTN: Andrea Papadopoulos, Deputy Regional Director
DEP - SERO
ATTN: Data Entry