Loading...
HomeMy WebLinkAboutPOLReports from 9/2002-4/2004The Commonwealth of Massachusetts Executive Office of Health and Human Services Department of Public Health 250 Washington Street, Boston, MA 02108-4619 MITT ROMNEY GO VERNOR KERRY HEALEY LIEUTENANT GOVERNOR RONALD PRESTON SECRETARY CHRISTINE C. FERGUSON COMMISSIONER April 2, 2004 Scott Leite Mansfield Board of Health 6 Park Row Mansfield, MA 02048 Dear Mr. Leite, Enclosed is a copy of a report "Hatheway and Patterson," Mansfield, MA. The Massachusetts Department of Public Health (MDPH), Bureau of Environmental Health Assessment (BEHA), developed this Public Health Assessment (PHA) as part of the agency's requirements under a cooperative agreement with the Agency for Toxic Substances and Disease Registry (ATSDR) that requires that a public health assessment be done for any site listed as a federal "Superfund" site. The site was formerly used as a wood treatment facility and the primary compounds of concern are arsenic, pentachiorophenoi, and dioxins. The PHA evaluates available environmental data for the site for public health concerns, as well as available cancer incidence data for Mansfield. The PHA also includes as appendices two previous health consultations conducted by MDPH that form the basis of a fish consumption advisory that is still in effect for Rumford River and its impoundments (i.e., Fulton, Klingman, and Cabot ponds) and Norton Reservoir. The public comment period for this draft PHA will be open until May 7, 2004. We have enclosed some draft documents for your office and will also be providing copies for public review to the Mansfield Public Library. If you have any questions, please call me at (617) 624-5757. Sincerely, �C� 8 Eq Elaine T. Krueger, Director Environmental Toxicology Program Bureau of Environmental Health Assessment cc: Suzanne K. Condon, Assistant Commissioner, MDPH/BEHA Martha J. Steele, Deputy Director, MDPH/BEHA Millie Garcia-Surrette, MDEP- SERO Mark Tisa, Assistant Director, DFG/DFW George W. Young, Jr., Director, Foxborough Health Department William Sweet, ATSDR Region I Enclosures U.S. ENVIRONMENTAL PROTECTION AGENCY, POLLUTION REPORT (POLREP) r, �. OCT 3 1 2003 . I. HEADING Date: October 28, 2003 Subject: Hatheway & Patterson Site Mansfield, MA From: Frank Gardner, OSC, EPA Region 1, Office of Site Remediation and Restoration, Emergency Planning and Response Branch To: POLREP Distribution List POLREP: 3 and FINAL IL BACKGROUND Site No.: O1X3 Task Order No.: 0097 Response Authority: CERCLA, §104(a) ERNS No.: N/A CERCLIS No.: MAD001060805 NPL Status: Listed on the NPL in 2002 State Notification: MA DEP notified Action Memo: Signed on July 11, 2003 by Susan Studlien, Acting Director, Office of Site Remediation and Restoration Start Date: July 29, 2003 Demob Date: October 17, 2003 Completion Date: October 17, 2003 III. SITE INFORMATION A. Incident Category Inactive Production Facility B. Site Description The Site is located at 35 County Street in Mansfield, Massachusetts. The surrounding land use is mixed residential and commercial. The approximately 38 acre site is bisected by an active railroad line, and a passenger railroad station is located within 0.25 miles to the south. This removal action was limited to arsenic -contaminated surface soils outside the Site perimeter fence and along the margins of County Street. See polrep #1 for additional site description information. C. Preliminary Assessment/Site Investigation Results On April 29, 2003, EPA's remedial program conducted surface soil sampling along the margins of County Street as part of the Remedial Investigation. These samples were found to contain arsenic up to 420 mg/kg. On July 1, 2003, the Emergency Planning and Response Branch (EPRB) conducted a removal site investigation which included walking the site with the remedial project manager, meeting with Town of Mansfield officials, and reviewing EPA's soil sampling data. The site investigation was closed on July 3, 2003 with the recommendation that a time critical removal action be conducted. IV. RESPONSE INFORMATION A. Situation 1. Current situation The removal action is complete. The Emergency Rapid Response Services (ERRS) contractor has excavated the arsenic -contaminated surface soils, backfilled and restored the disturbed areas, and shipped the excavated material off -site for disposal. 2. Removal activities to -date See previous polreps for removal activities prior to September 29, 2003. September 29 - September 30, 2003 The ERRS contractor secures the site and demobilizes to await loadout activities. October 14 - October 16, 2003 The ERRS contractor remobilizes to conduct loadout activities. The stockpile of excavated material is shipped off -site for disposal. October 17, 2003 The ERRS contractor secures the site and demobilizes all equipment, personnel, and supplies. 3. Enforcement The removal was conducted as an EPA fund -lead action. B. Planned Removal Activities No further removal activities are planned. The removal action is complete. C. Next Steps The removal action will be documented in an After Action Report prepared by the START contractor. D. Key Issues None identified at this time. V. COST INFORMATION Extramural Costs CEILING SPENT REMAINDER ERRS Contractor* 300,000 200,000 100,000 START Contractor + $75,000 39,458 35,542 Subtotal $375,000 239,458 135,542 Contingency (20%) + $75,000 - 0 - 75,000 Total $450,000 239,458 210,542 Intramural Costs EPA Regional Personnel + $75,000 12,336 62,664 PROJECT CEILING $525,000 251,794 273,206 *The current available ERRS funding (Task Order ceiling) is $375,000 ($300,000 ERRS contractor plus $75,000 extramural contingency). The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.' VI. DISPOSITION OF WASTES/PRODUCT Fifteen truckloads (approximately 375 tons) of arsenic -contaminated soils were shipped to Aggregate Recycling Corporation of Eliot, Maine (for recycling into asphalt) on October 14-15, 2003. Four drums (approximately 2000 pounds) of residual arsenic -contaminated soils and sweepings (from the soil stockpile area) were shipped to General Chemical Corporation of Framingham, Massachusetts (for landfilling) on October 16, 2003. 'Approximate amount used for cost recovery purposes will be actual costs, for example, $525,000 x 1.2702 (current indirect rate). U.S. ENVIRONMENTAL PROTECTION AGENCY �� w POLLUTION REPORT (POLREP) J f �'>003 I. HEADING v Date: September 26, 2003 Subject: Hatheway & Patterson Site Mansfield, MA From: Frank Gardner, OSC, EPA Region 1, Office of Site Remediation and Restoration, Emergency Planning and Response Branch To: POLREP Distribution List POLREP: 2 IL BACKGROUND Site No.: OIX3 Task Order No.: 0097 Response Authority: CERCLA, §104(a) ERNS No.: N/A CERCLIS No.: MAD001060805 NPL Status: Listed on the NPL in 2002 State Notification: MA DEP notified Action Memo: Signed on July 11, 2003 by Susan Studlien, Acting Director, Office of Site Remediation and Restoration Start Date: July 29, 2003 Demob Date: To Be Determined Completion Date: To Be Determined III. SITE INFORMATION A. Incident Category Inactive Production Facility B. Site Description The Site is located at 35 County Street in Mansfield, Massachusetts at 42' 02' 12.59" north latitude and 71' 11' 54.82" west longitude. The surrounding land use is mixed residential and commercial. The approximately 38 acre site is bisected by an active railroad line, and a passenger railroad station is located within 0.25 miles to the south. This removal action is limited to arsenic -contaminated surface soils outside the Site perimeter fence and along the margins of County Street. See polrep #1 for additional site description information. C. Preliminary Assessment/Site Investigation Results On April 29, 2003, EPA's remedial program conducted surface soil sampling along the margins of County Street as part of the Remedial Investigation. These samples were found to contain arsenic up to 420 mg/kg. On July 1, 2003, the Emergency Planning and Response Branch (EPRB) conducted a removal site investigation which included walking the site with the remedial project manager, meeting with Town of Mansfield officials, and reviewing EPA's soil sampling data. The site investigation was closed on July 3, 2003 with the recommendation that a time critical removal action be conducted. IV. RESPONSE INFORMATION A. Situation 1. Current situation The Emergency Rapid Response Services (ERRS) contractor has excavated the arsenic -contaminated surface soils, backfilled and restored the disturbed areas, and secured the stockpile of excavated material pending off -site disposal. 2. Removal activities to -date See previous polreps for removal activities prior to August 25, 2003. August 25 - September 5, 2003 The ERRS contractor completes excavation of arsenic -contaminated surface soils on the south side of County Street. The START contractor collects 12 post excavation samples from excavated areas as well as 21 surface soil samples to determine the extent of contamination on the north side of County Street. Upon completion of post -excavation sampling, excavated areas are backfilled, loamed, and seeded with grass. September 8 - SpVtember 26 2003 The ERRS contractor completes excavation of arsenic -contaminated surface soils on the north side of County Street. The START contractor collects 54 post excavation samples to ensure that the soil cleanup standards are being met. Upon completion of post -excavation sampling, excavated areas are backfilled, loamed, and seeded. with grass. 3. Enforcement At this time, the removal is proceeding as an EPA fund -lead action. B. Planned Removal Activities Planned activities include shipping excavated materials off -site for disposal and demobilizing from the Site. C. Next Steps The ERRS contractor is currently making arrangements for off -site disposal of the contaminated soil stockpile at an approved disposal facility. D. Key Issues None identified at this time. V. COST INFORMATION Extramural Costs CEILING SPENT REMAINDER ERRS Contractor* 300,000 142,000 158,000 START Contractor + $75,000 34,281 40,.719 Subtotal $375,000 176,281 198,719 Contingency (20%) + $75,000 - 0 - 75,000 Total $450,000 176,281 273,719 Intramural Costs EPA Regional Personnel + $75,000 12,393 62,607 PROTECT CEILING $525,000 188,674 336,326 *The current available ERRS funding (Task Order ceiling) is $375,000 ($300,000 ERRS contractor plus $75,000 extramural contingency). The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.' VI. DISPOSITION OF WASTES/PRODUCT No disposal activities have occurred to date. 'Approximate amount used for cost recovery purposes will be actual costs, for example, $525,000 x 1.2702 (current indirect rate). U.S. ENVIRONMENTAL PROTECTION AGENCY POLLUTION REPORT (POLREP) Date: August 22, 2003 Subject: Hatheway & Patterson Site Mansfield, MA From: Frank Gardner, OSC, EPA Region 1, Office of Site Remediation and Restoration, Emergency Planning and Response Branch To: POLREP Distribution List POLREP: 1 H.BACKGROUND Site No.: O1X3 Task Order No.: 0097 Response Authority: CERCLA, §104(a) ERNS No.: N/A CERCLIS No.: MAD001060805 NPL Status: Listed on the NPL in 2002 State Notification: MA DEP notified Action Memo: Signed on July 11, 2003 by Susan Studlien, Acting Director, Office of Site Remediation and Restoration Start Date: July 29, 2003 Demob Date: To Be Determined Completion Date: To Be Determined III. SITE INFORMATION A. Incident Category Inactive Production Facility B. Site Description 1. Site Location The Site is located at 35 County Street in Mansfield, Massachusetts at 42' 02' 12.59" north latitude and 71 I P 54.82" west longitude. The surrounding land use is mixed residential and commercial. The approximately 38 acre site is bisected by an active railroad line, and a passenger railroad station is located within 0.25 miles to the south. The site is bordered to the north by County Street and residential properties, to the south and west by residential areas, and to the east by commercial and industrial properties. This removal action is limited to arsenic -contaminated surface soils outside the Site perimeter fence and along the margins of County Street. Hatheway & Patterson (H&P) operated a wood treating facility at the Site dating back to the mid- 1950s. H&P employed various wood -treating processes over time including chromated copper -arsenate (CCA). These manufacturing processes and the associated drip pads and drying areas encompass much of the Site. H&P declared bankruptcy and went out of business in 1993. The Site was left abandoned until the Town of Mansfield took the property for back taxes in 2001. The Town now uses the Site as the headquarters for the Mansfield Emergency Management Agency and for storage of town vehicles. The Site is fenced, and access is controlled by the Town. The pressure treating building and associated drip pad area where CCA was used are located on the eastern part of the Site near County Street. The arsenic -contaminated surface soils to be addressed by this removal action are located outside the fenceline, near this drip pad area. 2. Description of Threat Sampling conducted by EPA has documented the presence of arsenic at levels up to 420 mg/kg in surface soils along the southern edge of County Street, just outside the site perimeter fence, and up to 53 mg/kg along the northern edge of County Street. C. Preliminary Assessment/Site Investigation Results On April 29, 2003, EPA's remedial program conducted surface soil sampling along the margins of County Street as part of the Remedial Investigation. These samples were found to contain high levels of arsenic. On July 1, 2003, the Emergency Planning and Response Branch (EPRB) conducted a removal site investigation which included walking the site with the remedial project manager, meeting with Town of Mansfield officials, and reviewing EPA's soil sampling data. The site investigation was closed on July 3, 2003 with the recommendation that a time critical removal action be conducted. IV. RESPONSE INFORMATION A. Situation 1. Current situation The Emergency Rapid Response Services (ERRS) contractor has conducted a site walk with EPA and is currently excavating the arsenic -contaminated surface soils. Excavated materials are being stored in a covered and bermed stockpile in preparation for off -site disposal. 2. Removal activities to -date July 29, 2003 (Tuesday) EPA performs a site walk with the ERRS contractor and meets with Town of Mansfield officials regarding the planned removal activities. Week of August 4 - August 8, 2003 The ERRS contractor mobilizes equipment and supplies to the Site and installs telephone service to the command post. The Superfund Technical Assessment' and Response Team (START) contractor collects 50 surface soil samples to determine the extent of contamination. These samples are sent to EPA's New England Regional Laboratory (NERL) for analysis. Week of August 11 - August 15, 2003 The ERRS contractor completes mobilizing equipment, supplies, and personnel. Work zones and staging areas are established, and excavation of arsenic - contaminated surface soils begins on the south side of County Street. The START contractor collects 35 surface soil samples to determine the extent of contamination. Week of August 18 - August 22, 2003 The ERRS contractor continues excavation of arsenic -contaminated surface soils on the south side of County Street. Upon completion of post -excavation sampling, excavated areas are backfilled. The START contractor collects 10 post excavation samples and 21 extent -of -contamination soil samples. 3. Enforcement At this time, the removal will proceed as an EPA fund=lead action. B. Planned Removal Activities Planned activities include excavation of the remaining arsenic -contaminated surface soils on both sides of County Street, backfilling of excavated areas, loadout of excavated materials, and site restoration. C. Next Steps The ERRS contractor will complete excavation and backfilling activities on the south side of County Street before moving operations to the north side of the street. 0 D. Key Issues None identified at this time. V. COST INFORMATION Extramural Costs CEILING SPENT REMAINDER ERRS Contractor* 300,000 38,580 261,420 START Contractor + $75 000 I5 000 60 000 Subtotal $375,000 53,580 321,420 Contingency (20%) + $75 000 - 0 - 75 000 Total $450,000 53,580 396,420 Intramural Costs EPA Regional Personnel + $75,000 10 000 65,000 PROJECT CEILING $525,000 63,580 461,420 *The current available ERRS funding (Task Order ceiling) is $150, 000. The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written, The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.' VI. DISPOSITION OF WASTES/PRODUCT No disposal activities have occurred to date. 'Approximate amount used for cost recovery purposes will be actual costs, for example, $525,000 x 1.2702 (current indirect rate). TOWN OF MANSFIELD, MASSACHUSETTS May 21, 2003 Ms. Carol Tucker Chief, Massachusetts Superfund Section EPA — HBO 1 Congress Street Boston, MA 02114 Six Park Row, Mansfield, MA 02048 TOWN MANAGER'S OFFICE John O. D'Agostino, Town Manager Telephone (508) 261-7370 Facsimile (508) 261-7498 Email townmanaeer(a mansfieldmaxorn 2,3? _003 Re: Request for Funding for the Hatheway & Patterson Superfund Site, Mansfield MA Dear Ms. Tucker: As you may be aware, the Town of Mansfield is cooperatively working with EPA officials on the above -mentioned superfand site. This site is controlled by the Town of Mansfield and consists of approximately 40 acres. Given our geographic location, Mansfield is centrally located between the Boston, Providence and Worcester markets. The town's location is within the 95/495 beltways with ancillary access from Routes 106 and 140. The Hatheway & Patterson site was once used to manufacture pressure treated wood products. As a result of this process, extensive contamination and pollution has been detected on site. We have formed a committee to investigate reuse options for the site, which presently hosts an active rail spur with access to the Providence and Boston markets. Committee members, constituting representatives from the Board of Selectmen, Industrial and Development Commission, Planning Board, and the Zoning Board of Appeals are actively working to develop the highest and best reuse options for the site. Therefore, the Town submits a request for funding in the amount of $75,000 to explore the feasibility of establishing anon -site incubator, which will support emerging new industries, which have a need for rail service for the site. In addition, the Town desires to study the impact these new industries will have to the abutting neighborhood including traffic impact, the feasibility of rail crossing, and whether or not the site and its geographic location are conducive for industrial and commercial development initiatives. Such information will be invaluable to EPA in gauging the future extent of clean up to the site. Once we have completed the above -mentioned study of the site, we plan to conduct outreach initiatives to measure the level of interest for future site development. The Hatheway & Patterson Reuse Committee (consisting of the above -mentioned committee members) will request to hire a consultant familiar with contaminated site reuse initiatives to work with the committee and the residential abutters to fashion the highest and best reuse option available to the Town. Our desire is to return the property to the tax rolls as quickly as possible and to have at least one anchor -type company interested in locating or relocating to this site within the next year to year -and -a -half. If you have any questions or desire further information, please do not hesitate to contact my office. Your attention to our request for assistance is deeply appreciated. I hope to hear from you in the not -too -distant future to discuss this opportunity in greater detail. Sincerely Yours, John D'Agostino Town Manager Cc: Mansfield Board of Selectmen Shaun Burke, Director of Planning & Development Mansfield Planning Board Richard Lewis, Conservation & Environmental Agent Mansfield Zoning Board of Appeals Scott Leite, Mansfield Health Agent Mansfield Board of Health Industrial & Development Commission R:\Town Manager\I-lathaway Patterson Request for technical assistance EPA Punding.doc Created by jdagostino last saved by eonellette NPL Site Narrative for Hathaway and Patterson Company HATHEWAY AND PATTERSON COMPANY Mansfield, Massachusetts Federal Register Notice: September 5. 2002 Conditions at Proposal (September 13, 2001): Hatheway and Patterson Company (HPC) is a former wood preserving facility located in a mixed residential and industrial area in Mansfield, Bristol County, Massachusetts. The HPC property comprises approximately 40 acres and is bordered to the north by County Street and residential properties, to the south and west by forested and wetland areas, and to the east by a welding and masonry supply company. The property is roughly divided in half by the Rumford River, which runs north to south, and by a railroad track right-of-way, which runs east and west. The HPC site is being proposed to the NPL because releases of dioxins, furans, and phenols from the facility to the Rumford River have impacted fisheries and wetlands, and releases of arsenic, chromium, copper, phenols (including pentachlorophenol (PCP)), and polycyclic aromatic hydrocarbons (PAHs) to ground water pose a threat to nearby municipal and private drinking water wells. Operations at the HPC property included preserving wood sheeting, planking, timber, piling, poles, and other wood products. HPC began wood treating operations at the property in 1953, although it operated at the facility since 1927. Operations between 1927 and 1953 are unknown. HPC historically used various methods and materials to treat wood on the property, including PCP in fuel oil, creosote, fluoro-chrome-arsenate-phenol (FLAP) salts, chromated copper -arsenate (CCA), Dricon (tm) (a fire retardant), and other chemicals. In 1971, a tar mat approximately 62 feet long and 6 inches wide was discovered by town of Mansfield and Massachusetts Department of Environmental Protection (MADEP) personnel. At the end of 1972, a citizen complained of "oily water' and dead water fowl in the Rumford River downstream of the HPC facility. Subsequently, MADEP and the town of Mansfield requested that HPC contain the seepage. By 1973, HPC developed a contaminated ground water recovery trench located along the east bank of the Rumford River just upstream from its confluence with the Rumford River backwash channel. Oily seepage was again detected in the Rumford River in 1981 by a prospective buyer of the site. In 1987, HPC was issued a Notice of Noncompliance by the MADEP, which ordered that HPC conduct a soils and hydrology assessment of the site. In 1988, MADEP issued HPC a Notice of Responsibility, and in 1990, MADEP issued a Request for Short -Term Measure to address the imminent contamination of the Rumford River emanating from the site. In 1992, EPA's RCRA program personnel conducted inspections of the HPC facility and determined that the drip pads were not in compliance. In 1984, HPC filed for bankruptcy and ceased operations in April 1993. Because wood treating solvents, chemicals, sludges, tanks, sumps, and drums were abandoned by HPC on the property with no electricity or heat, conditions at the site posed a significant threat of hazardous substance releases. Therefore, in December 1993, EPA's Emergency Planning and Response Branch initiated a two year removal action to address problems at the HPC site. Upon initiating the removal action, EPA discovered several process and support buildings that contained large tanks, process vessels, drums, sumps, pits, and various small containers. Outside on the property, EPA discovered three drip pads, treated lumber storage areas, three above ground tanks containing PCP, another tank containing fuel oil, three tanks containing Dricon (tm) in water, and six underground storage tanks. Over 50,000 gallons of waste water was removed by EPA during this action; an undetermined amount of contaminated soil remains at the site. HPC's operations and abandoned materials have caused releases of site -related contaminants to soils, ground water, and surface water. In 1999, the state of Massachusetts, at the recommendation of the Agency for Toxic Substances and Disease Control, closed the Rumford River downstream of the HPC facility to all fishing due to dioxin contamination attributed to HPC. Releases of dioxins and phenols also have impacted approximately 1.25 miles of wetland frontage along the Rumford River, and the releases pose a threat to several other wetland areas, fisheries, and habitats used by State designated threatened species downstream of the facility. In addition, over 44,000 people receive drinking water from private and municipal wells within four miles of the HPC facility. Status (September 2002): EPA is considering various alternatives for this site. [The description of the site (release) is based on information available at the time the site was evaulated with the HRS. The description may change as additional information is gathered on the sources and extent of contamination. See 56 FR 5600 February 11, 1991, or subsequent FR notices.] For more information about the hazardous substances identified in this narrative summary, including general information regarding the effects of exposure to these substances on human health, please see the Agency for Toxic Substances and Disease Registry (ATSDR) ToxFAQs. ATSDR ToxFAQs can be found on the Internet at ht .// atsdr.cdc.c,�ovitoxfaq.html or by telephone at 1-888-42-ATSDR or 1-888-422-8737.