HomeMy WebLinkAboutWare St. Roads A & B - 12/4/1979,A,
Office at
50 West Street
Applicant: _I
Location: of
Mail Address:
Engineer: —1
Mail Address:
ication # 159 Date: 12/5179
Tel. No.: 9-4240
Tel. No.: 9-3137
Inspection By: 1/8/30 A_ Stanzione J. Gerrior
Soil Log:
Test Hole #1 Test Hole #2 Test Hole #3
7®18:' op&su soil (sandy) 0®18- lop& subsoil
18-54" med. 'sa-d 18-60" tied sand
A-96" Coarse sand & gravel 60-96" Coarse sand & gravel
wst line Ce 54" Rust line n 36"
Groundwater depth: 51i" Groundwater depth: 60"
Test Hole #4
Ground water depth:
Percolation Test Data:
Test Hole #
V
11171
Recommendations:
Test Hole #5
Ground water depth:
Town Water Available ( x)
Ground water depth:
Test Hole #6
Ground water depth:
Test Hole #
mmmodFism
r _ eDATE
A ST`A APPROVED PLAN
UT BE KEPT ON THE SITE
TOWN•OF MANSFIELD
APPLICATION FOR ON -SITE SEWAGE TESTING
Number_ /(Vw-
Da tel fit`T
Fee Paid
Lot to be tested, address
i
i
Owner of Propertynn/i �JcyvL Phone �`
A .A s
Address 5-0
Engineer_
Licensed Installer,
Address
1. if lot is on an existing street you must get a numbered address from
the Town Assessors, iii order for the Board of Health to take action on
the application.
2. Fee $65.00
3. On -site sewage testing in season December 1 to April 30.
4. For out -of -season testing $100 deposit after the Board of Health gives
approval for testing.
5. Ail seasonal testing applications MUST be received by Parch 31.
6. You must know before the Town's Engineer comes out to your lot, as to
where you wish to have on -site sewage testing done.
7. Requirements needed at time of testing:
a, your own engineer
b. back -hoe or similar equipment, which would be able to dig
10-12 feet for pits or galley trenches.
c. enough water for on -site sewage testing
i copy for applicant
11 copy for treasurer
1 copy for Board of Health
r r,
r
l ,
THE COMMONWEALTH OF MASSACHUSETTS
'ow 'of Mansfield
BOARD OF HEALTH
February 4, 1980
Mr. Frank Bonvie
650 Ware Street-f
Mansfield, Ma. 02048 t°
Re: Road B, Off Ware Street, #13, 16, 17, 20, 21, 24, 25, 28, 29, 32,
33, 37.
Dear Mr. Bonvie:
Please be advised, your above referenced applications for Soil
Examination have been tentatively approved with the Town Engineer's
recommendation that the high ground water be determined at a later
date and pending submission of a definitive plan showing the design
and layout of the disposal system.
Before the Occupancy Permit is issued by the Building Inspector you
must submit an as built plan which conforms to the Board of Health
Rules and Regulations and Title V of the State Sanitary Code, at which
time you will be issued a Certificate of Compliance from the Board.
Sincerely,
Edward J. Tartuffo,z
Chairman
CC: RIM
EJT/dab
Office at
50 West Street
Applicant: _ F
Location: Ra
Mail Address: 6
Engineer: RIM
Mail Address: _
• • • •'
Massachusetts
Board
� • 1 f • of
# 141 Date: 12/4i�9
Ware St Tel. No.: 9-4240
Tel. No.: 9-3731
Inspection By: A. Stanzione 1/10/80
Soil Log:
Test Hole #1 Test Hole #2 Test Hole #3
0-20' op,su soi - op subsoi 1
20-98"Clean sandw/stones 30-104" Clean coarse
sand and stone
Ground,water depth- (0,1 Groundwater depth: 461,
Test Hole #4 Test Hole #5
Ground water depth:
Percolation Test Data:
Ground water depth:
Ground Water depth:
Test Hole #6
Ground water depth:
Test Hole # f Test Hole #
Depth: 36" Depth:
Rate: 2 IT I
Recommendations: Perc is acceptable, Ground AtoPe e
��
��
'� �
iat '
��- � ��
� �.
�`'�
w
TOWN -OF MANSFIELD
APPLICATION FOR ON -SITE SEWAGE TESTING
Numbers(�������
Be to
Fee Pa i d /, r, a
._
Lot to be tested, address iiJ
�C /J —
Owner of Property n, // a t Phone y - yJ yC
Address S-O %NcC �^3 /%rt. oi_euG'J
Engineer,
Licensed Installer J,) u"I ,//�i�-� �C (ePhone
Add
1. If lot is on an existing street you must get a numbered address from
the Town Assessors, lii order for the Board of Health to take action on
the application,
2. Fee $65.00
3. On -site sewage testing in season December I to April 30.
4. For out -of -season testing $100 deposit after the Board of Health gives
approval for testing.
5. Ail seasonal testing applications MUST be received by March 31.
6. You must know before the Town's Engineer comes out to your lot, as to
where you wish to have on -site sewage testing done.
7. Requirements needed at time of testing:
a. your own engineer
b. back -hoe or similar equipment, which would be able to dig
10-12 feet for pits or galley trenches.
c, enough water for on -site sewage testing
I copy for applicant
'I copy for treasurer
i copy for Board of Health
r
Office at
50 West Street
Applicant: Frank Bnnvie Application# 140 Date: 12/4/79
Location: Road R Q Lot 14
Mail Address: 650 bore Street Tel. No.: 9-4240
Engineer: RIM
Mail Address: 150 North Main St. Tel. No.: 9-3731
Inspection By:
Soil Log:
Test Hole #1 Test Hole #2 Test Hole #3
Ground water depth: Ground water depth:
Test Hole #4 Test Hole #5
Ground water depth:
Percolation Test Data:
Test Hole #
Depth:
Rate:
Recommendations: This l o
This lot is anac
Ground water depth:
Town Water Available (x )
to he tested at a
table.
Ground water depth:
Test Hole#6
Ground water depth:
Test Hole #
Depth:
Rate:
later date.
a � ', ��
� ,,�° .
TOWN •OF MANSFIELD
APPLICATION FOR OIJ-SITE SEWAGE TESTING
Number'
De te_�z� „
Fee Pa i d /�, a r
Lot to be tested, address ke . �� /� n y 14-
Owner of Property_
Address 6 S-d
E ng l vee r-_-___ 4
Licensed Installer,
Address
Z,
I
1. If lot is on an existing street you must get a numbered address from
the Town Assessors, in order for the Board of Health to take action on
the application.
2. Fee $65.00
3. On -site sewage testing in season December 1 to April 30.
4. For out -of -season testing $100 deposit after the Board of Health gives
approval for testing.
5. All seasonal testing applications MUST be received by March 31.
6. You must know before the Town's Engineer comes out to your lot, as to
where you wish to have on -site sewage testing done.
7. Requirements needed at time of testing:
a. your own engineer
b, back -hoe or similar equipment, which would be able to dig
10-12 feet for pits or galley trenches.
c, enough water for on -site sewage testing
1 copy for applicant
I copy for treasurer
1 copy for Board of Health
THE COMMONWEALTH OF MASSACHUSETTS
Tow® of Mansfield
BOARD OF HEALTH
February 4, 1980
Mr. Frank Bonvie
650 Ware Street
Mansfield, Ma. 02048
Re: Road A, Off Ware Street, #10, IL 18, 22, 25, 26, 29, 30, 33, 34,
36, 37, 38, 41, 42, 45.
Dear Mr. Bonvie:
Please be advised, your above referenced applications for Soil
Examination have been tentatively approved with the Town Engineer's
recommendation that the high ground water be determined at a later
date and pending submission of a definitive plan showing the design
and layout of the disposal system.
Before the Occupancy Permit is issued by the Building Inspector you
must submit an as built plan which conforms to the Board of Health
Rules and Regulations and Title V of the State Sanitary Code, at which
time you will be issued a Certificate of Compliance from the Board.
Sincerely,
Edward J. Tartufo
Chairman
CC: RIM Engineering
EJT/dab
Office at
50 West Street
Applicant:
Location: Rc
Mail Address:
Engineer: _
Mail Addressi
650 Ware
Application # 161 Date: 12/4/79
Tel. No.: 9-4240
Tel. No.: 9-3731
Inspection By: Anthony f' Stanzione 1/7/30
Soil Log:
Test Hole #1 Test Hole #2 Test Hole #3
0- 24op&su soi - op&subsoil
4-108" Sand & boulders 24-120'' Boney sand
108-118" Boney Sandy gravel
Ground water depth: 37'
Test Hole #4
Ground water depth:
Percolation Test Data
Groundwater depth: 40''
Test Hole #5
Ground water depth:
Ground water depth:
0
Test Hole#6
Ground water depth:
Town Water Available( x) BOARD. d ,
ATE
A MAMPE APPROVED PLAN
MUST BE KEFT ON THE SITE
� - I
TOdN'OF MANSFIELD
APPLICATION FOR ON -SITE SEWAGE TESTING
Numbe r_ A/
Be te-4w-e-�7 9
Fee Peid
Lot to be tested, address nn
Owner of Property tea, K/lc22a� Phone ?_ /_yJ yp
Address 16 .S-d %a/� �"//-?
Engineer
11 Licensed Installer_
c-�
1. If lot is on an existing street you must get a numbered address from
the Town Assessors, in order for the Board of Health to take action on
the application.
2. Fee $65.00
3. On -site sewage testing in season December 1 to April 30.
4. For out -of -season testing $100 deposit after the Board of Health gives
approval for testing.
5, All seasonal testing applications MUST be received by March 31.
6. You must know before the Town's Engineer comes out to your lot, as to
where you wish to have on -site sewage testing done.
7. Requirements needed at time of testing:
a. your own engineer
b. back -hoe or similar equipment, which would be able to dig
10-12 feet for pits or galley trenches.
c. enough water for on -site sewage testing
1 copy for applicant
'I :copy for treasurer
i copy for Board of Health