Loading...
HomeMy WebLinkAboutSchool Comm. 08/17/2021approved 09-21-211 Mansfield School Committee RECEIVED Facilities Subcommittee W $ CLERKS OFFICE Minutes for August 17, 2021 ZOZI SEP 22 P Q: 5b A meeting of the Mansfield School Committee Facilities subcommittee was opened and gOMAISFg9tQ at8:06am. M1 (, S, to USETTS Attendees: Lauren Scher, Linda Fernando, Matt Jacques, Ed Donoghue Approval of Minutes Minutes approved from July 1, 2021 facilities subcommittee meeting (2-0) New Business • Summer cleaning update • Stripped / rewaxed over 40 classrooms • Rooms / hallways been scrubbed (all classrooms have been touched) • Walked schools w Teresa this week; completely ready for Open House 21 painting projects completed: including QMS girls locker room, hallways, etc. • Built 125 desks • Brought back all furniture from storage (34 truckloads); moved items into classrooms • Facilities project update o Landscape • Removed weeds at all building, working w local landscape architect to determine looks best visually and has the most staying power. Will not be complete for OH but soon after • Sidewalks removed in front of MHS along East street; concrete will be poured next week and will be ready for the start of school (weather dependent) • MHS: left of main entrance — doing something special with this area. Bench, small trees, rocks will be added (similar to what the town has done to encourage cohesiveness) o Security check -in stations QMS: will be 100% complete by end of day - ramp for new handicap entrance is finished and railing will be painted today Robinson: access control will be installed next week • MHS: vestibule security window room built/complete; security glass will be next week. Looks like a security check -in station without walls • JJ: production delays in getting the metal installed; should be complete by start of school o Back -to -school cleaning / readiness • A (had the most needs) approved 09-21-21 • Epoxied 26 bathroom floors. Ground out the floors to get out all the dirt and re -epoxied. All will be complete next week • Lighting project — removed fluorescent lights; installed LED in over 500 fixtures. Everything will be finished per a student's IEP. Entire building will be complete by next year • Lots of other smaller items in the other schools • All filters changed in HVAC units (quarterly change) • All filter changed in water filters • Town inspection will be today— police, fire, DPW going through every area of each school to ensure the district is ready for opening • Have kept up with HVAC recommendations from the last audit and making repairs as needed along the way o Boiler project • Selected by MSBA to meet with their representative • Site visit for tomorrow and if goes well, MPS will move to the next phase: go to November Town Meeting to ask for funding for the MHS boiler project; town has to fund the entire project and then get reimbursed by MSBA once the project starts. Goal would be to start next summer • Currently putting a lot of money into the upkeep of the boilers so really time to replace • PPE for back to school o Have supplies needed for the first month of school • Lots of wipes; pricing out on refills in case there's a need • Numerous adult masks on hand; may need to purchase juvenile masks o Waiting to hear about last minute mask requirements to determine what (if anything else is needed) o Suggestion to publicize the amount of work that's been done / PPE on hand especially for those families who may have been fully remote for the past year • Teresa is holding an information night on 8/26. Christine will discuss Covid protocols and Matt should be included to discuss facilities • Custodian position update o Still looking to fill one position; may have an internal candidate. Not a lot of interest from the outside; not a lot of applicants (people are hesitant to leave one district to move to another) • May need to look at how the job is presented to attract more people o Will still be challenged if there are people who need to be out due to quarantine but can manage Next meeting date: September 21, 2021 @8am Meeting adjourned: 8:55 am