Loading...
HomeMy WebLinkAboutWest Church St. #50 - 5/11/2021Massachusetts Department of Environmental Protection LL7] Bureau of Resource Protection Well Completion Reports Well Driller Please specify work performed: Address at well location: New Well Street Number: Street Name: WESTCHURCH 50 STREET Please specify well type: Building Lot#: Assessor's Map M Monitoring Assessor's Lot#: ZIP Code: Number Of Wells: 1 Cityrrown: Well Location MANSFIELD In public right-of-way: GPS (GPS for the deepest well) r Yes R No North: West: 42.02870 71.22209 Subdivision/Property/Description: " Mailing Address: IF click here if same as well location address Prc party Owner: Street Number: Street Name: 2269 MASSAVENUE City/Town: State: Engineering Firm: CAMBRIDGE MASSACHUSETTS MCPHAIL ASSOCIATES ZIP Code: 02140 Board of health permit obtained: (' Yes t: Not Required Permit Number: Date Issued: 0 101 Massachusetts Department of Environmental Protection Bureau of Resource Protection — Well Driller Program Well Completion Reports(Moniforing) Well Driller - Monitoring Form DRILLING METHOD Overburden uger edrock -Choose Bedrock -- WELL LOG OVERBURDEN LITHOLOGY From(ft) To(ft) Code Color Comment Drop In drill stem Extra fast or slow drill rate Loss or addition of Fluid 0� � r r YES NO r r Fast Slow r r Loss Addition 5� UNan Fiii � Brown � r r YES NO f Sl Fast Slow r r loss Addition 70 Coarse Sand Brown .J r r YES t� IF, Sl Fast Slow r r Loss Addition 70 75 Boulders ® Brown s l PERMIT INFORMATION DEP 21 E RTN # DEP Groundwater Discharge # ADDITIONAL WELL INFORMATION beveloped r Yes (•' No Are these wells nested? r Yes r No Surface Seal Type ement rem of group (sq. ft) Total Well Depth 15 Depth to Bedrock CASING From To Type Thickness Diameter Polyvinyl Chloride J Schedule 40 .I 22 SCREEN No Screen From"> To Type Slot Size Diameter 15 Slotted PVC ,J i WATER -BEARING ZONES From To Yfeld (gpm) 0 ANNULAR SEAL/ FILTER PACK From 0 0 0 r Is Casing above ground? To Material 1"> Weight Material Weight Water (gal) Batches Method Of Placement Native Maledal ---Choose Material--- ,• Gravity J Gravity J eentonite Chips/Pellets ---Choose Material--- 15 Sand ---Choose Material--- J rGravily J Ll WATER LEVEL Massachusetts Department of Environmental Protection Bureau of Resource Protection — Well Driller Program Well Completion Reports(Monitoring) Date Measured Static Depth BGS (a) Flowing Rate (gpm) OS/11/2021 0 0 COMMENTS _3 WELLS INSTALLED WELL DRILLERS STATEMENT This well was drilled or altered under my direct supervision, according to the applicable rules and regulations, and this report is complete and accurate to the best of my knowledge. Monitoring [MI Supervising Driller Signature NEWSHAM, DrillerGARY CAOUETTE Registration # 606 PETER, W TECHNICAL DRILLING Date Job Complete Firm SERVICES, INC. Rig Permit # 67 05/11/2021 NOTE: Well Completion Reports must be filed by the registered well driller within 30 days of well completion.