HomeMy WebLinkAboutDEQE - 8/23/1983g -co
(oxeCuliirle 6f ^e a/ emrixary eli'zda,�
ANTHONY D. CORTESE Sc. D
�.u�aat n�arxr�
Commissioner p p i ®® a0GMe& 02346
PAUL T. ANDERSON ICI o7..CZR.Pirt ✓4icldJ
Regional Environmental Engineer 947-7237, 0&t 680-684
Cr August 23, 1983 -�
Hatheway and Patterson, Inc. RE: MANSFIELD--Hazardous Waste--RCRA
15 County Street Inspection, 310 CMR 30.000 and
Mansfield, Massachusetts 02048 40 CFR 26o-265, Site ID# MAD001060805
ATTENTION: Mr. William Haynes
Gentlemen: REECMVM,00 3 0 MI
The Department of Environmental Quality Engineering, on August 12, 1983, conducted
a follow-up inspection of your facility located at 15 County Street,_ Mansfield,__
Massachusetts. The purpose of this inspection was to determine tt:e:lstatus of your ,
facility relative to compliance with the Hazardous Waste Regulations contained in 310
6NZR-30000 and 4o CFR 260-265.
During the course of the inspection, you stated that Hatheway and Patterson, Inc.
would like to change its status from a Treatment/Storage/Disposal Facility to that of
a generator who stores only on a temporary basis. A letter should be submitted to
Mr. Jacob Edwards, State Waste Programs Branch, U.S. EPA, Region I, John F. Kennedy
Building, Room 1903, Boston, Massachusetts 02203, requesting return of the Part A
application. This letter should list each process code the company originally filed
for, and clearly state the reason why each code is no longer applicable. The letter
should also reference the facility's EPA I.D. number. A carbon copy of this letter
should be sent to both the DEQE's Boston and Lakeville offices; Ms. Linda Benevides,
DEQE, Division of Hazardous Wastes, One Winter Street, Eighth Floor, Boston, Massachusetts
02108; and DEQE, Southeast Region, Lakeville Hospital, Lakeville, Massachusetts 02346,
respectively.
The inspection did verify that your company presently operates only as a small
generator. Please be reminded that as a small generator, in order to maintain that status
without a storage license from the Department or interim status from EPA, once 1000 kg
of hazardous waste is reached in storage, it must be sent off site within 90 days. Also
be reminded that the date upon which accumulation begins must be clearly marked on each
container. You are directed to the Hazardous Waste Regulations contained in 310 CMR
30.000 and 4o CFR 260-265.
At the time of this inspection, Hatheway and Patterson, Inc. was observed to be in
compliance with the above -referenced regulations.
��jY t
t , ,
��a l
Sze, " Or, 3 0 10Ct?. , . .
- 2 -
Please be advised that no person who generates or otherwise comes into possession
of hazardous waste shall transfer custody or possession of such waste to any person
who does not have a valid hazardous waste license and that a properly prepared manifest
must accompany such waste.
If you have any questions regarding this matter, please contact Andrea Sewall of
this office.
Very truly yours,
For the Commissioner
Christopher Tilden, Chief
Hazardous Materials/Solid Wastes Section
T/ AS/kd
cc: Paul J. Folkman, HWC
Town Hall
50 West Street
Mansfield, Mass. 02048