Loading...
HomeMy WebLinkAboutPenney Engineering, Inc. - 9/17/1993P ENN EY ENGINEERING, INC Environmental Engineers September 17, 1993 Mr. Marcel Boelitz DEP - SOUTHEAST REGIONAL OFFICE 20 Riverside Drive Lakeville, MA 02347 (508) 946-2862 RE: Hatheway & Patterson Company, Inc. DEP Site No. 4-0571 Progress Report for August 1993 Dear Mr. Boelitz: This progress report is intended to update the Department on the activities involved in the performance of the Supplemental Phase II Comprehensive Site Assessment and the Interim Measure Assessment being conducted by Penney Engineering at the Hatheway & Patterson site. As discussed in our August 5, 1993 letter to Mark Begley, Chief of DEP-SERO's Site Remediation Section, Penney has been attempting to establish a consistent payment program in order to continue our work at the Hatheway & Patterson site. In the meantime, we are only conducting work tasks that are critical to maintaining the health and safety of the public and the environment. We will advise the Department if such a payment arrangement cannot be reached, thereby forcing us to suspend all work at the site. A bankruptcy sale by public auction was held at the site on August 24. Machinery and equipment sold at the auction, including two treatment pressure vessels, have been and continue to be removed from the premises. The No. 2 fuel oil has been removed from the above -ground tank at the site. During the removal of Cylinder #3 from its enclosed building, the piping for the site's Short Term Measure was partially dismantled. The piping needs to be repaired and the electrical power restored to resume the operation of the STM. On August 24, personnel from the Department inspected monitoring well MW-12 and reportedly observed four inches of floating oil. In response, Penney reinstituted a weekly bailing program for wells MW-6 and MW-12 beginning on August 26. The dates the wells were checked and the thicknesses of floating oil layer measured are summarized in Table 1. The oil was removed from the wells by extensive bailing after each inspection. The oil was placed in a covered, labeled 55-gallon drum adjacent to MW-12. Once the drum is filled, it will be properly disposed of as a hazardous waste. 125 High Street, Mansfield, MA 02048 (508) 261-1288 FAX (508) 261-1208 Recycled Paper Mr. Marcel Boelitz September 17, 1993 Page 2 Date TABLE 1 Oil Thickness (Inches) MW-6 MW-12 26 August 4.0 4.4 2 September 5.3 13.0 10 September 3.9 13.5 13 September 2.3 14.7 The source of the oil which has recently migrated to wells MW-6 and MW-12 is uncertain, since no significant quantities of floating oil were detected during our Interim Measure assessment test pitting program performed in June. The oil may have been washed out from oil saturated soils as a result of the fire at the Conlon and Donnelly property, where an estimated one million gallons of water was discharged near the northeastern portion of the site in a relatively short period of time on July 14, No significant quantities of floating oil were detected in any of the wells gauged on July 21, Due to the substantial layer of floating oil in each well, both wells will be inspected and bailed twice each week until no longer detected. Our future reports will include a discussion of the oil in MW-6 and MW-12. We will continue to keep the Department informed of the progress of the Supplemental Phase II assessment and the proposed Interim Measure activities. Currently, we are preparing to submit a report of our Interim Measure assessment program. Please call if you have any questions. Yours truly, PENNEY ENGINEERING, INC Paul D. Vigeant Staff Scientist cc: Hathaway and Patterson Mansfield Board of Health Mansfield Conversation Commission Thomas Miller, Esquire Kevin Lyons, Esquire Attorney Margaret R. Stolfa, DEP-OGC-SERO 4"' W 'elI L Ralph P. Penney, PE President PENNEY ENGINEERING, INC