Assessment of Current Groundwater Conditions of the Rumford
River and Recommendations for Immediate and Long Term Solutions.
Prepared by
M.A. Fitzgerald
Consulting Engineer
Franklin, MA 02038
PI IPpnCF
r
This report will review the hydrocarbon contamination of soils and
groundwater at the Rumford River as it crosses under the Penn. Central
Railroad bridge in Mansfield, Massachusetts. This report will investigate
past actions taken to contain the contamination and recommendations for
further actions to be taken.
This report has been prepared at the request and expense of the Hathaway &
Patterson Co. Inc., 15 County Street Mansfield, Massachusetts and is intended
for internal use only.
HISTORICAL ASPECTS
The history of Hatheway and Patterson as applies to is Mansfield
operations is as follows;
Incorporated January 3, 1927
Relocated at 15 County St., Mansfield Circa 1952
Commencement of Non -pressure creosoting operations 1953
Commencement of Pressure wood preserving operations 1958
Commencement of close cycle waste treatment operation 1972
Commencement of Kiln Drying operations 1977
Termination of Petroleum solvent treating operation 1981
In November 1972, Town of Mansfield officials requested that the
Massachusetts Department of Environmental Quality Engineering (DEQE) inspect
an apparent oily seepage from the banks of the Rumford River at Location "A"
t
(see Figure 1). At that time, the DEQE requested and obtained samples of oil
products used at Hathaway & Patterson (H & P) because of the proximity of the
H & P operation. H & P was informed that DEQE wished to have reasonable
evidence of the source of the seepage before a cleanup operation was
commenced. For that purpose H & P also furnished DEQE with analytical
procedures for measuring chemicals used as wood preservative by H & P. In
December 1972, DEQE advised H & P to begin operations to contain the oily
seepage within 24 hours of notification. H & P contracted with Coastal
Services, Inc. to provide and install deepwater booms, and sorbent at Location
"A" and two locations downstream.
During the ensuing months these further actions were taken:
Test wells were established
A collection pit at Location "A1" was installed
A collection trench at Location "A2" was installed
Maintenance of booms and sorbents and removal of substantial amounts of
oily groundwater from collectors by an industrial waste disposal firm were
daily continous operations. Subsequently, temporary electrical power and
piping were supplied to the site to commence pumping. Oily groundwater was
pumped back to H & P property and into the existing wastewater treatment
facilities, where oils were separated and reused. Groundwater was thermally
evaporated. Continuous pumping operations were conducted through most of 1973.
In addition the downstream booms were moved to Locations "B1" and 19211,
where they proved more effective.
By the summer of 1973, seepage had essentially ceased at Location "A", but
in November 1973, a new outbreak of seepage occurred at Location "AY. A
plywood bulkhead was constructed at that location resulting in very effective
trapping of oil along the riverbank. The oil was removed by sorbents on a
continuous basis. In September 1974, an "L shaped" non -permeable barrier was
installed as designated at 11B3" with four recovery pits. During construction
of this barrier, virtually no oils were seen in the groundwater beyond 19211.
By 1975, the amount of oils recovered declined, and by 1976 only trace amounts
were recovered. Pumping operations were ceased and the small amounts
t recovered were returned to the H & P wastewater treatment facilities in hand
carried buckets. Additional problems were encountered because of frequent
vandalism to the recovery equipment and malicious dumping of drums containing
the recovered oils.
From 1977 to 1981, frequent monitoring of the area was deemed the only
required action.
In mid November 1981 a minor surge in activity was observed by the H & P
personnel during routine monitoring. Environmental officials were notified of
the situation, that it was being closely monitored, and was under control. No
official response was made. However, in December 1981, a third party, in the
process of performing percolation tests in anticipation of purchasing the land
upon which the site is located, reported oily soils and/or oily groundwater to
officials who were apparently unaware of the prior existence of the situation
or the specific notification given in November.
ASSESMENT OF CURRENT CONTAMINATION
In order to assess the impact of the recent discovery of oily groundwater
in percolation test pits, a survey of past quantities of recovered oil was
conducted.
The following data is approximate but can be considered to be indicative
of the trend of recoverable oil quantities. Data furnished by H & P
personnel, based on various measurement methods.
Date/Time Interval
Location
Amount
Jan.
1972
Pit
2000 gals
March
1972 - June 1972
Trench
300 gals
Nov.
1973 - Jan. 1977
Bulkhead
200 gals
1974
- 1976
Barrier
10 gals
1976
- 1977
Bulkhead
30 gals
1978
- Oct. 1981
All Locations
0 gals
Dec.
1981
Bulkhead
3 gals
Jan.
1982
Bulkhead
0.5 gals.
Results are as follows:
Location
T-1
T-2
T-3
T-4
T-5
T-6
Chloride Equivalent
No oil found
2.73%
Background
Background
Background
Background
In this test procedure, error can be introduced by any migratory chloride
compounds, (such as NaCl roadsalt) but in all but the obvious case, results
were below threshold.
Since the sampling technique was not reported, it is impossible to use
these samples to estimate the volumes of recoverable oil at any location.
Clearly a greater sample volume of the contaminant needs to be recovered
before additional work can be performed to determine the quantity and nature
of the hydrocarbon solvents.
Obviously, the greatest portion of contamination was removed at the
beginning of the project and with the exception of the 1981 minor resurgence,
the trend has been towards ever decreasing quantities of oily seepage.
Interviews with H & P personnel involved with the recovery operation indicate
a periodic recurrence of the problem generally occurring concurrently with
periods of increased precipitation.
ANLAYSIS OF SAMPLES
Several samples of oily groundwater were obtained from the Briggs
Engineering Company of Norwell Mass, which represented a third party
performing investigations. The locations of samples taken are at locations
"T-1 through T-611. Only the sample from "T-2" had sufficient free oil to do
extensive study of the oily components. However, since this location is
adjacent to the previous recovery operation it can be assumed to be
essentially related to the prior oil contamination.
In the limited time available we have been able only to analyze for
chlorinated hydrocarbons which would be be presumed to have come from wood
preserving operations at H & P. The analytic method used was the standard
method for determination of the chloride equivalent of pent chlorophenol,
known as the line ignition method. The background sensitivity of the
procedure is appoximately .01% by weight. Analysis was performed at H & PIS
testing laboratory with correlation from the laboratory of the Forshaw
Chemicals Co., Charlotte, N.C., a major supplier of such chemicals.
EXISTING SITE
The area of the oil seepage is generally comprised of fill material. This
fill material appears to be somewhat consistent in its composition, however,
excavated material did indicate a mixture of coal cinders. Field inspection
of the soil indicated that the fill material did contain a fair amount of
sandy silt.
As the existing subsurface is primarily a gravelly fill soil,
permeability through the area is relatively high. If the gravel has been
placed over an in -situ material that is less pervious, the groundwater table
will experience extreme changes in depth throughout the year. Also since the
gravel does appear to contain substantial amounts of sandy silts, capillary
action will further decrease the depth of the table from the surface. It is
possible that this extreme range of groundwater table depth is leaching oils
that had previously been absorbed by the sandy silts and coal cinders.
At the location of the railroad bridge, the Rumford River drastically
changes its level due to the scouring pad installed during construction of the
Penn Central railroad bridge. This difference in elevation is approximately
four to five feet. Such a difference in river level will result in upset
groundwater conditions due to increased hydraulic gradients. This condition
will make prediction and actual determination of groundwater flow somewhat
difficult in the questioned area.
It was noticed that a dump, containing a number of drums, exists on the
southeast side of the property, possibly contributing to the condition at the
Rumford River. At this location a drainage outflow header also exists. At
this time the origin of this drainage line is not known but it appears to be
typical of highway drainage. It was also noticed that an underpass does exist
approximately 1500' from this outfall.
A review of existing Hatheway & Patterson facilities indicates
extraordinary means have been employed in recent years to ensure no escape of
oily contaminents into the groundwater supply.
There also are significant amounts of surface oily contamination at the
railroad tracks presumably due to normal locomotive use
RECOMMENDATIONS
The following recommendations are made for action to be undertaken
immediately so that assessment of the contamination may be initiated and
further seepage contained:
1. Continue daily monitoring and recovery of oily substances at existing
trap locations.
2. Deed restict the site against construction of potable water wells or
irrigation.
3. Clean up dump site on the southeast side and check for possible
l contaminant source.
�. 4. Further investigation of the drainage header and/or installation of
an oil trap.
5. Investigation of the use of bacterial agents to breakdown the oil.
The following are recommended actions to be taken as soon as weather
permits:
I. The installation of a permanent observation pit to determine the
extent of the contamination and relative amounts. Location to be
determined.
2. Based on the results of the above action, the installation of
Pumping/recharging stations. Such an operation will establish a
closed loop seepage path, further increasing the rate of removal of
any remaining oily contamination by the flowing groundwater. This
action should be undertaken such that it is protected from vandalism
and is easily accessable for servicing.
3. Investigation into the feasbility of installing a groundwater
intercept trench if the above recommendation does not remove the
recoverable oil. ✓ >
In the opinion of this engineer, Hatheway & Patterson Inc., has the
capabilities, facilities, and management techniques to initiate compliance wth
the above recommendations.