Loading...
HomeMy WebLinkAboutDEP - 1/6/1993Commonwealth of Massachusetts Executive Office of Environmental Affairs Department of Environmental Protection Southeast Regional Office William F. Wald Go Daniel S. Greenbaum CommhdorMf January 6, 1993 Hatheway & Patterson Co., Inc. RE: MANSFIELD--WSC/SA-4-0571 P.O. Box 177 Hatheway & Patterson Mansfield, Massachusetts 02048 _15,County Road (the "Site"), Request for Short Term Measures,' M.G.L. c. 21E,'31-0 CMP. 40.000 ATTENTION: William E. Haynes President Gentlemen: On December 22, 1992, your consultant (as used in this letter "you" and "your" refer to Hatheway & Patterson Co., Inc.), Penney Engineering, Inc., notified the Department of Environmental Protection, Bureau of Waste Site Cleanup (the "Department") of the presence of free -phase floating product in monitoring wells MW-6 and MW-12, and of the release of product to surface waters in the wetlands lying south of MW-12. A visit to the Site by the Department on January 5, 1992, confirmed these conditions. Conditions at the Site require additional Short Term Measures pursuant to 310 CMR 40.542(2)(f). NECESSARY SITE ACTIONS The undertaking of additional Short Term Measures must be preceded by the submittal and the approval under 310 CMR 40.536(2) of a Short Term Measure Proposal as described under 310 CMR 40.542(3)(b). Please be aware that a health and safety plan must be compiled and implemented in accordance with 310 CMR 40.542(3)(d). A Short Term Measure Proposal needs to include the information needed to chose and design the Short Term Measures. It should include: (i) A description of the data required to define (a) the hydrogeology of the Site, (b) the extent, nature and volume of separate -phase adsorbed and free-floating contaminants, and (c) the appropriate remedial actions needed to remove promptly the remaining separate - phase contaminants at the Site. A work plan to acquire this data, including drilling and monitoring procedures and protocols, sampling plans for all media, field screening and analytical protocols, gauging plans, bench and pilot Lakeville Hoephal a Route 105 a Lakeville, Massachusetts 02347 0 FAX (506) 947.6557 0 Telephone (508) 946.2700 -2- studies of appropriate remedial actions, and a schedule. Contingency plans may be necessary to manage additional exploratory drilling and monitoring should the assessment undertaken fail to reach the objectives identified in item (i). An interpretation of site conditions supported by compilations of data including borehole logs and completion diagrams, stratigraphic profiles, contaminant tables, maps and graphs, and vertical and areal flow nets. The Department requires that: (a) You submit for approval a Short Term Measure Proposal dealing with the assessment required at the Site (items (i) through (iii) above) within thirty (30) days of receipt of this letter. (b) You submit for Department approval a Short Term Measure Design that includes the results of your assessment and your plans for Short Term Measures within thirty (30) days of Department approval of the Short Term Measure Proposal (item (a) above). (c) You complete the construction and activate the Short Term Measures within thirty (30) days of Department approval of the Short Term Measure Design (item (b) above). (d) You submit within sixty (60) days of Department approval of the Short Term Measure Design (item (b) above) a report that fully documents the Short Term Measures as built in conformance with 310 CMR 40.542 and this letter. This report will be followed by monthly reports that monitor and evaluate the effectiveness of the Short Term Measures. The Department requires a written response within fourteen (14) days of your receipt of this letter indicating whether you intend to take the actions outlined above. You should be aware that these short term measures do not relieve you from undertaking a full Phase II - Comprehensive Site Assessment. However, the Short Term Measures can contribute greatly to the assessment and remediation of the Site. You have been previously notified of your liability in the Notice of Responsibility letter dated August 16, 1988. -3- Your cooperation in this matter is appreciated. Should you have any further questions regarding site WSC/SA-4-0571, please contact Marcel V. Boelitz of this office at (508) 947-2868. Very truly yours, Mar J. Bgg ley, C 'ef� Sie Remerdiation ectio B/MVB/rr CERTIFIED MAIL #011 215 182 RETURN RECEIPT REQUESTED cc: DEP - BOSTON - BWSC DEP - SERO - BWSC Data Entry DEP - BOSTON - WPC ATTN: Judith Perry (617) 292-5655 U.S. Army Corp of Engineers OD - Regulatory Division 424 Trapelo Road Waltham, MA 02254 - 9149 ATTN: Ulrika E. Volz (617) 647-8879 Fax (617) 647-8303 Board of Selectmen Town Hall 50 West Street Mansfield, MA 02048 Board of Health Town Hall 50 West Street Mansfield, MA 02048 ATTN: Scott Leite (508) 261-7366 aC cc: Conservation Commission Town Hall 50 West Street Mansfield, MA 02048 ATTN: Richard Lewis, agent (508) 261-7378 William Haynes, Trustee HPC Realty Trust 15 County Road, Mansfield, MA 02048 Penney Engineering, Inc. 125 High Street Mansfield, MA 02048 ATTN: Ralph P. Penney, President (508) 261-1288