March 5, 1996
Mr. William Haynes RE: MANSFIELD--BWSC/SMP-4-0571
532 Adam Street, #127 Hatheway & Patterson
Milton, Massachusetts 02186 _15-County--Road
NOTICE OF RESPONSIBILITY
-� M:`G''L. c. 21E and 3TO CMR_��
40.0000
URGENT LEGAL MATTER: PROMPT ACTION NECESSARY
CERTIFIED MAIL: RETURN RECEIPT REQUESTED
Dear: Mr. Haynes:
The Department of Environmental Protection, Bureau of Waste
Site Cleanup (the Department), has determined that the Hatheway &
Patterson Co., Inc. (Hatheway & Patterson), facility at 15 County
Street, Mansfield, Massachusetts, is a disposal site (the "Site")
as defined in M.G.L. c. 21E, the Massachusetts oil and Hazardous
Material Release Prevention and Response Act and the Massachusetts
Contingency Plan (the MCP), 310 CMR 40.0000. The Site was listed
by the Department as a confirmed Disposal Site on October 15, 1988.
Massachusetts General Law Chapter 21E and the MCP require the
performance of response actions to prevent harm to health, safety,
public_ welfare and the environment, which may result from
„m this
i.iu
release and/or threat of release and govern the conduct of such
actions. The purpose of this notice is to inform you (as used in
this letter, "you" refers to William Haynes) of your legal
responsibilities under State law for assessing and/or remediating
the release at this property. For purposes of this Notice of
Responsibility, the terms and phrases used herein shall have the
meaning ascribed to such terms and phrases by the MCP unless the
context clearly indicates otherwise.
STATUTORY LIABILITIES
The Department has reason to believe that you are a
Potentially Responsible Party ("PRP") with liability under M.G.L.
c. 21E, S 5. Specifically, Section 5 states that this liability
extends to current owners or operators of a site from or at which
20 Riverside Drive a Lakeville, Massachusetts 02347 a FAX (508) 947.8557 a Telephone (508) 946-2700
0 Printed on Recyded Paper
-2-
there is or has been a release or threat of release of oil and/or
hazardous material; any person who owned or operated a site at the
time hazardous material was stored or disposed of; any person who
arranged for the transport, disposal, storage or treatment of
hazardous material to or at a site; any person who transported
hazardous material to a transport, disposal, storage or treatment
site from which there is or has been a release or threat of release
of such material; and any person who otherwise caused or is legally
responsible for a release or threat of release of oil or hazardous
material at a site.
This liability is "strict," meaning it is not based on fault,
but solely on your status as an owner, operator, generator,
transporter or disposer. It is also joint and several, meaning
that you may be liable for all response action costs incurred at
the site, regardless of the existence of any other liable parties.
The MCP requires responsible parties to take necessary
response actions at properties where there is or has been a release
and/or threat of release of oil and/or hazardous material. By
taking the necessary actions yourself, you may significantly lower
your assessment and cleanup costs and/or avoid liability for costs
incurred by the Department in taking such actions. You may also
avoid the imposition of the amount of or reduce certain permit
and/or annual compliance assurance fees payable under 310 CMR 4.00.
Please refer to M.G.L. c. 21E for a complete description of
potential liability. A summary of liability under M.G.L. c. 21E is
attached to this notice.
If you do not take the necessary response actions, or fail to
perform them in an appropriate and timely manner, the Department is
authorized by M.G.L. c. 21E to performed the work. By taking such
actions, you can avoid liability for response action costs incurred
by the Department in performing these actions and any sanctions
which may be imposed for failure to perform response actions under
the MCP.
You may be liable for up to three (3) times all response
action costs incurred by the Department. Response action costs
include, without limitation, the cost of direct hours spent by
Department employees arranging for response actions or overseeing
work performed by persons other than the Department or its
contractors, expenses incurred by the Department in support of
those direct hours, and payments to the Department's contractors.
(For more detail on cost liability, see 310 CMR 40.1200: Cost
Recovery.)
The Department may also assess interest on costs incurred at
the rate of twelve percent (12%), compounded annually. To secure
payment of this debt, the Commonwealth may place liens on all of
your property in the Commonwealth. To recover the debt, the
Commonwealth may foreclose on these liens or the Attorney General
may bring legal action against you.
In addition to your liability for up to three (3) times all
response action costs incurred by the Department, you may also be
=9n
liable to the Commonwealth for damages to natural resources caused
by the release. Civil and criminal liability may also be imposed
under M.G.L. c. 21E, S 11, and civil administrative penalties may
be imposed under M.G.L. c. 21A, S 16, for each violation of M.G.L.
c. 21E, the MCP or any order, permit or approval issued thereunder.
You should be aware that you may have claims against third
parties for damages, including claims for contribution or
reimbursement for the costs of cleanup. Such claims do not exist
indefinitely, but are governed by laws which establish the time
allowed for bringing litigation. The Department encourages you to
take any action necessary to protect any such claims you may have
against third parties.
ACTIONS UNDERTAKEN TO DATE AT THE SITE
Information on file with the Department indicates that the
following response actions have been performed to date at this
site:
Product was observed breaking out into the Rumford River from
the Hatheway & Patterson property on July 5, 1990. This condition
was confirmed by representatives of the Department and the
Mansfield Board of Health on the following day. The Department
determined that the conditions at the Site constituted an imminent
hazard pursuant to 310 CMR 40.542(2)(a) and (f) and required a
Short Term Measure (STM) in compliance with 310 CMR 40.542.
On January 22, 1991, the Department approved a Short Term
Measure Design submitted by Keystone Environmental Resources
(Keystone) on behalf of Hatheway & Patterson. The STM design
consisted of the installation and operation of an active product
recovery system along the east bank of the Rumford River.
The system was installed in September 1991. In February 1992,
Penney Engineering redesigned the system to allow it to operate on
a full time basis. The redesign also included treating the
effluent with carbon and discharging the treated water to the
Rumford River. The discharge from the treatment system was
diverted to the municipal sewer system in October 1992. During a
year of operation by Penney Engineering, the recovery system
collected less than ten gallons of product.
Following H&P's bankruptcy in February 4, 1993 and subsequent
abandonment of the Site, pumping and treatment activities were
discontinued. Also, as a result of useable equipment being removed
during an auction at the Site in August 1993, the pump and treat
system may no longer be operable. Releases of contaminated oil to
the Rumford River and surrounding wetlands may continue
intermittently.
The Site was referred to the United States Environmental
Protection Program (USEPA). Based upon conditions at the Site, the
USEPA determined that a removal action was necessary to mitigate
the threats to human health and the environment posed by hazardous
substances at the Site.
-4-
USEPA personnel met personnel from the Department at the Site
on November 23, 1993, for a walkthrough of the Site. Following
that meeting, a general agreement was made between the Department
and USEPA. USEPA would address the time -critical threats including
removal of bulk chemicals in tanks, vessels and drums, as well as
address any contamination in surface soils that may pose a threat
to public health.
By September 1995, the USEPA had emptied all tanks, pipes,
sumps and pits containing hazardous material and shipped the
contents off -site for proper disposal or re -use. The USEPA also
delineated areas of contaminated surficial soils and covered the
areas that met or exceeded the removal criteria with geotextile and
compacted gravel and, in some areas, asphalt. In addition, the
USEPA repaired the fence around the site and posted the area with
hazardous materials warning signs.
During the removal action, the Department hired a State
Contractor to remove approximately 268 gallons of petroleum product
and sludge from an above ground tank and removed 50 gallons of
waste oil from two drums.
The Department is currently planning to address sub -surface
soils, groundwater, and surface water contamination from past wood
treatment operations and disposal at the Site.
NECESSARY RESPONSE ACTIONS AND APPLICABLE DEADLINES
This site shall not be deemed to have had all the necessary
and required response actions taken for it unless and until all
substantial hazards presented by the release and/or threat of
release have been eliminated and a level of No Significant Risk
exists or has been achieved in compliance with M.G.L. c. 21E and
the MCP.
You must employ or engage a Licensed Site Professional
("LSP"), to manage, supervise or actually perform the necessary
response actions at this site. You may obtain a list of the names
and addresses of Licensed Site Professionals by contacting the
Board of Registration of Hazardous Waste Site Cleanup Professionals
by telephone at (617) 556-1145 or in person or by mail at One
Winter Street, 6th Floor, Boston, Massachusetts 02108.
In addition, the MCP requires persons undertaking response
actions to perform Immediate Response Actions in response to sudden
releases, Imminent Hazards and Conditions of Substantial Release
Migration. Such persons must continue to evaluate the need for
Immediate Response Actions and notify the Department verbally and
within the applicable timeline, of any 2 or 72 hour conditions
which are determined to exist at the site as described in 310 CMR
40.0310.
Specific approval is required from the Department prior to the
implementation of all Immediate Response Actions ("IRA"), or
Release Abatement Measures ("RAM"), pursuant to 310 CMR 40.0420 and
310 CMR 40.0443, respectively. Assessment activities, the
construction of a fence and/or the posting of signs are actions
that are exempt from this approval requirement.
-5-
The MCP requires persons undertaking response actions at a
site to submit to the Department a Response Action Outcome
Statement prepared by a Licensed Site Professional upon determining
that a level of No Significant Risk exists or has been achieved at
the site. The MCP requires that a fee of $750.00 be submitted to
the Department when a Response Action Outcome ("RAO"), statement if
filed greater than 120 days from the date of notification.
PROCEDURES TO FOLLOW TO UNDERTAKE RESPONSE ACTIONS
You should notify the Department in writing no later than 5:00
p.m. on March 12, 1996, if you intend to undertake response actions
at this disposal site. If you fail to provide a response to this
notice as requested, or fail to undertake the necessary response
actions in accordance with the MCP, the Department may perform the
necessary response actions and take appropriate legal action
against you.
All future communications regarding this release must
reference the following Release Tracking Number: 4-0571.
Si ely,
r
erard M. Martin, AC
ng Chief
Site Management and Permitting
GMRM/cb
CERTIFIED MAIL NO. P 606 844 589
RETURN RECEIPT REQUESTED
cc: Board of Selectmen
Town Hall
50 West Street
Mansfield, MA 02048
ATTN: Dianne Royle, Chairperson
Board of Health
Town Hall
50 West Street
Mansfield, MA 02048