Loading...
HomeMy WebLinkAboutPlanning 01/28/2021Ms. Marianne Staples, Town Clerk Town of Mansfield Six Park Row Mansfield, MA 02048 PLANNING BOARD CERTIFICATE OF ACTION SITE PLAN Re: MMED Utility Storage Garage High Street/West Church Street Engineer: TBA Architects, Inc. Owner: Mansfield Municipal Electric Department Dear Ms. Staples: Please be advised that on Wednesday, January 27, 2021, the Mansfield Planning Board conducted a public meeting and discussed the above -referenced site plan for the Mansfield Municipal Electric Department at High Street/West Church Street in accordance with Mansfield Zoning By - Law Section 230-5.3, Site Plan. At that meeting, the Mansfield Planning Board, with six (6) members present, voted to approve the site plan application titled "MMED Storage Building W. Church St. Mansfield, MA" dated November 13, 2020 and prepared by TBA Architects, Inc: The following documents were introduced at the public meeting: a. Copy of the site plan application, filed with the Town Clerk's office November 16, 2020; b. Plan titled "MMED Storage Building W. Church St. Mansfield, MA" dated November 13, 2020 and prepared by TBA Architects, Inc.; c. November 17, 2020 memo from Shaun P. Burke, Director of Planning and Development; d. January 20, 2021 memo from Joshua Reinke, EIT and Rick Alves, PE, Engineering Department; e. Sheet I of 1 of photometric plan "Mansfield Municipal Storage Building" dated January 27, 2021. Motion: On January 27, 2021, the Mansfield Planning Board, with six (6) members present, voted six (6) in favor with zero (0) opposed and zero (0) abstentions to approve the site plan application for the MMED Storage Building as shown on the plan titled "MMED Storage Building W. Church St. Mansfield, MA" dated November 13, 2020 and prepared by TBA Architects, Inc. with the following conditions: 1. Any and all department head comments (attached) must be completely addressed prior to the issuance of a building permit(s); i, 2. Hours of operation for demolition, construction deliveries, site work and construction shall be MMED Storage Garage Page 2 of 2 limited to 7:00 a.m. to 5:00 p.m. Monday through Friday and 8:00 a.m. to 4:00 p.m. on Saturday. No work shall be done on Sunday. These restricted homy ofoperation shall not apply to interior work. All loaded vehicles shall be suitably covered'to prevent dust and contents leaving the vehicle and to protect abutters and other residents, and the public way from material spilled from the load. All public rights -of -way shall be maintained free of all mud, stones or any other conditions that may result in a public safety hazard for vehicles or pedestrians. Sweeping or cleaning must be completed daily or more frequently as deemed necessary during the operation, as directed by the Mansfield Police Chief. The applicant may be required to have a police officer present during any hauling on or off site. The applicant shall consult with the Mansfield Police Chief as to whether or not this may be necessary and to discuss the best hauling routes. Erosion control measures should be installed around catch basins within the public right-of-way. (Penney-Cerretani) Friedman — In favor LeCesne — In favor Penney — In favor McClanahan — In favor Ashman -Collins — In favor Cerretani — In favor Six (6) in favor. Zero (0) opposed. Zero (0) abstained. PASSES Therefore, by a vote of six (6) in favor with zero (0) opposed and zero (0) abstentions, the site plan application for the "MMED Storage Building W.'Church Si Mansfield, MA" dated November 13, 2020 and prepared by TBA Architects,, Inc. is hereby approved. If you have any questions, please contact the Planning Department. Sincerely, / It �J r�`e << 141 /� C, (C C 44 / Beth Ashman -Collins, Chair Mansfield Planning Board Attachments Cc: Joseph Sollectio, Manager, Mansfield Municipal Electric Department Robert J. Blackman, Inspector of,Buil,dings/Zoning EnforcementOfficer Richard Alves, Jr., P.E., Town ,,EngineWAssistantDPW Director BAC/jd Town of Mansfield 6 Park Row, Manoeld, Masracbmeas 02048 D, artment of Public Forks Town. Engineer/Assistant DPW Director Richard C. Alves, Jr., PE MEMORANDUM TO: Shaun Burke, AICP, Director of Planning & Community Development FROM: Joshua W. Reinke EIT, Engineer II/3WR Richard C. Alves, Jr. PE, Town Engineer/Assistant DPW Director/ -CA DATE: January 20, 2021 SUBJECT: Site Plan Application, 125 High Street, Proposed MMED Storage Garage Note: Site Plans and Drainage Calculations submitted by Samiotes Consultants, Inc. dtd. 11113120, The Engineering Division provides the following comments, recommendations & questions: 1. Please highlight the top of bankand'base flood`elevaiion lines on the plan set. 2. Please indicate the location of accessible parking within the parking lot. 3. Drain pipes should match crowns. 4. We recommend the 8" PVC drain pipe that runs 62 feet be changed to Ductile Iron Pipe due to lack of minimal cover over the pipe. The 8" DI is permissible due to the outlet pipe being of the same diameter. 5. We recommend against using a trench drain as, in our experience; they frequently clog and cease to function properly. 6. The Town requires mulch socks be used in lieu of straw wattles. Questions: 1. Is sewer service being brought to the building? If so, please indicate on the plan set. 2. Does the 6" PVC pipe running under the slab meet Plumbing Code?. 3. Is there any increase in disturbance within the Riparian Zone? Cc: Robert Blackman, Inspector of Buildings & Zoning Enforcement Officer Katelyn Merrill, Environmental & Conservation Planner Phone (508)261-7377 . • Fax (508)261-7425 Emailralves@mansfteldma.com Town of Mansfield 6 Park Row, Mansfield, Massachusetts 02048 Planning Department Shaun P. Burke Director of Planning and Development I1T/i_�i\ ["1, \ll��_ 1"jiI TO: Robert J. Blackman, Inspector of Buildings/Zoning Enforcement Officer FROM: Shaun P. Burke, Director of Planning and Development DATE: November 17, 2020 SUBJECT: Site Plan Application — MMED Storage Garage - High Street/West Church Street I have reviewed the above -referenced site for conformity to local by-laws, in the Mansfield Zoning By -Law and sound planning practices, and offer the following: 1. The proposed municipal use is allowed in the underlying zone, Industrial 3 (I3). 2. The proposed building meets both the required setbacks and FAR for the underlying zone. 3. The building as shown appears to be storage only. If there will be office space or other similar uses proposed, they should be shown on the plans. 4. The site is, for the most part, within the 200-foot outer riparian zone. 5. Approximately one -quarter of the site is within the 100-foot inner riparian zone. The proposed building appears to be wholly within the 100-foot inner riparian zone. 6. The proposed building abuts or lies within the 100-year floodplain zone, the "AE Zone." 7. The rear of the proposed building abuts the 25-foot Conservation Commission No -Touch Zone. 8. The applicant should consider relocating the proposed building to the opposite, or west, side of the site (a mirror image to the current proposal). By relocating the proposed building, the issues raised in items 4, 5, 6 and 7 above would be addressed. Phone (508)261-7363 Fax (508)261-7343 Emailsburke@mansfieldma.com 9. With a minor image of the proposed building, the rear of the proposed building would be accessible by the Mansfield Fire Department from West Church Street, although there is a chain link fence at that location from the public way. 10. Is the site subject to an Activity Use Limitation (AUL)? I am concerned about excavation for the proposed rain garden. 11. Is there a fire hydrant located on site? If not, there should be at least one located within the fenced area. 12, Will there be any lighting on the building itself? Is so, lighting should be shown. Municipal Clearinghouse The Planning Board, under the Town's Home Rule Charter, must make a recommendation to the Select Board on all municipal projects. Based on the proposal and the site suitability, I think Planning Board support should be offered to the Select Board on this project. While the building could be relocated on the parcel, the need for the equipment building is clear and the proposed use is the same or similar to the existing use. The parcel, located in the I3 zone and subject to an AUL, will be substantially improved by the site work, stormwater management improvements and indoor storage of trucks and materials. If you have any questions or would like to discuss any of the above in further detail, please feel free to contact me. SPB/id